Federal Contracts
Showing award actions 51–100 of 353 funded award actions, most recent first.
- Contracts with positive obligations
- 138
- Funded award actions shown
- 353
- Obligations shown
- $1.7B
- Awarding agencies
- 7
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of September 18, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 5, 2025 | Department of DefenseW075 ENDIST SAN FRAN | W912P725CA018 | 237990 | PROJECT DESCRIPTION: THIS PROJECT IS FOR THE REACH 6 LEVEE AND FLOODWALL CONSTRUCTION ALONG THE CORRALITOS CREEK, A TRIBUTARY OF THE PAJARO RIVER LEVEE SYSTEM IN THE CITY OF WATSONVILLE, COUNTY OF SANTA CRUZ. | $39M |
| Sep 3, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $51K |
| Sep 3, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $51K |
| Sep 2, 2025 | Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION | 70B01C25F00000194 | 236220 | BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION | $20M |
| Aug 27, 2025 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056723C000008 | 237310 | THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F | $5.6M |
| Aug 19, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $244K |
| Aug 12, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $10K |
| Jul 28, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $379K |
| Jul 8, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $197K |
| Jul 3, 2025 | Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION | 70B01C25F00000194 | 236220 | BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION | $54M |
| Jun 2, 2025 | Department of DefenseW076 ENDIST FT WORTH | W9126G24C0032 | 237990 | DESIGN BID BUILD CONSTRUCTION FOR RAIL YARD IMPROVEMENTS AT FORT BLISS, TEXAS | $5.7M |
| May 20, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $175K |
| May 13, 2025 | Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION | 70B01C25F00000194 | 236220 | BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION | $1.6M |
| May 9, 2025 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247325F5234 | 237310 | MINIMUM GUARANTEE - GRANITE CONSTRUCTION | $5K |
| May 1, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $163K |
| Apr 30, 2025 | Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION | 70B01C25F00000194 | 236220 | BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION | $23M |
| Apr 30, 2025 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056725D000003 | 237310 | IDAHO, MONTANA, AND SURROUNDING AREAS INDEFINITE DELIVERY/ INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) | $10K |
| Apr 15, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $244K |
| Apr 9, 2025 | Department of JusticeFCI OTISVILLE | 15B21125P00000063 | 237110 | WELL REHAB WITH CAMERAS AND NEW PUMP | $6K |
| Apr 1, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $263K |
| Mar 28, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $33K |
| Mar 24, 2025 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056723C000008 | 237310 | THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F | $45K |
| Mar 24, 2025 | Department of DefenseNAVFACSYSCOM MARIANAS | N6274222C1329 | 237120 | N62742-22-C-1329, FY18 MCON P-661 NAVY-COMMERCIAL TIE-IN HARDENING JOINT REGION MARIANAS, GUAM | $597K |
| Mar 14, 2025 | Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION | 70B01C25F00000194 | 236220 | BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION | $70M |
| Mar 4, 2025 | Department of JusticeFCI OTISVILLE | 15B21125P00000063 | 237110 | WELL REHAB WITH CAMERAS AND NEW PUMP | $110K |
| Feb 26, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $41K |
| Feb 24, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0006 | 237990 | HCR RODS REPLACEMENT | $24K |
| Feb 19, 2025 | Department of DefenseW076 ENDIST FT WORTH | W9126G23C0013 | 237990 | 3 LEVEE REACH2/VINYARD & HARRISON SUMPS | $6K |
| Feb 18, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $370K |
| Feb 12, 2025 | Department of DefenseW076 ENDIST FT WORTH | W9126G25C0003 | 237990 | ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS | $14M |
| Feb 4, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0006 | 237990 | HCR RODS REPLACEMENT | $93K |
| Jan 21, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $213K |
| Jan 7, 2025 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056725C000008 | 237310 | FUND CONSTRUCTION PROJECT OR FLAP UMATILLA 582(1), MILL CREEK ROAD. WORK INCLUDES CHIP SEAL, CRUSHED AGGREGATE, GRADING, REPAIR OF SOLDIER PILE WALLS WITH ANCHORED WIRE MESH, SIGNING, TRAFFIC CONTROL, AND EROSION CONTROL. | $3.2M |
| Dec 20, 2024 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $292K |
| Dec 18, 2024 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $583K |
| Nov 21, 2024 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $53K |
| Oct 24, 2024 | Department of DefenseW076 ENDIST FT WORTH | W9126G23C0013 | 237990 | 3 LEVEE REACH2/VINYARD & HARRISON SUMPS | $19K |
| Sep 27, 2024 | Department of DefenseW076 ENDIST FT WORTH | W9126G23C0013 | 237990 | 3 LEVEE REACH2/VINYARD & HARRISON SUMPS | $161K |
| Sep 26, 2024 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056723C000008 | 237310 | THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F | $422K |
| Sep 25, 2024 | Department of DefenseW076 ENDIST FT WORTH | W9126G24C0032 | 237990 | DESIGN BID BUILD CONSTRUCTION FOR RAIL YARD IMPROVEMENTS AT FORT BLISS, TEXAS | $71M |
| Sep 23, 2024 | Department of DefenseNAVFACSYSCOM MARIANAS | N6274222C1329 | 237120 | N62742-22-C-1329, FY18 MCON P-661 NAVY-COMMERCIAL TIE-IN HARDENING JOINT REGION MARIANAS, GUAM | $471K |
| Sep 16, 2024 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $800K |
| Jun 20, 2024 | Department of DefenseNAVFACSYSCOM MARIANAS | N6274222C1329 | 237120 | N62742-22-C-1329, FY18 MCON P-661 NAVY-COMMERCIAL TIE-IN HARDENING JOINT REGION MARIANAS, GUAM | $67K |
| Jun 5, 2024 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0006 | 237990 | HCR RODS REPLACEMENT | $125K |
| May 30, 2024 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $49K |
| May 23, 2024 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0006 | 237990 | HCR RODS REPLACEMENT | $9K |
| May 15, 2024 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247319F5250 | 237310 | X002 ST16-1341; DBB; REPAIR FAILING TAXIWAY INDIA, RWY 36 - NBC N | $327K |
| May 15, 2024 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247319F5250 | 237310 | X002 ST16-1341; DBB; REPAIR FAILING TAXIWAY INDIA, RWY 36 - NBC N | $160K |
| May 14, 2024 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $203K |
| May 1, 2024 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $43K |