Federal Contractor Profile
Granite Construction Company Guam
$1.7B obligated·138 awards·7 agencies·10 NAICS
Federal Contracts
Showing award actions 1–50 of 353 funded award actions, most recent first.
- Contracts with positive obligations
- 138
- Funded award actions shown
- 353
- Obligations shown
- $1.7B
- Awarding agencies
- 7
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of September 18, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 18, 2026 | Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION | 70B01C25F00000194 | 236220 | BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION | $4.9M |
| Sep 14, 2026 | Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION | 70B01C26F00000165 | 236220 | BORDER WALL CONSTRUCTION- VERTICAL BARRIER, LAREDO TEXAS SECTOR, LRT-4 | $2.7M |
| Sep 8, 2026 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056726C000017 | 237310 | MT FLAP BLACKF 12(1) & MT NP GLAC 12(2), FLAP & FLTP REHABILITATION OF TWO MEDICINE ROAD: CONSTRUCTION SERVICES ON WFL PROJECT MT FLAP BLACKF 12(1) & MT NP GLAC 12(2), FLAP & FLTP REHABILITATION OF TWO MEDICINE ROAD. THIS WORK CONSIST | $482K |
| Aug 28, 2026 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056726C000017 | 237310 | MT FLAP BLACKF 12(1) & MT NP GLAC 12(2), FLAP & FLTP REHABILITATION OF TWO MEDICINE ROAD: CONSTRUCTION SERVICES ON WFL PROJECT MT FLAP BLACKF 12(1) & MT NP GLAC 12(2), FLAP & FLTP REHABILITATION OF TWO MEDICINE ROAD. THIS WORK CONSIST | $24M |
| Aug 7, 2026 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056726F00019N | 237310 | CONSTRUCTION SERVICES FOR PROJECT ID BOUNDARY 5806 (3)B, RIVERSIDE ROAD IMPROVEMENTS B. THE WORK CONSISTS OF GRADING, DRAINAGE, BASE, SUBEXCAVATION, CULVERTS AND PAVING. | $950K |
| Jul 23, 2026 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $4.0M |
| Jul 16, 2026 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $659K |
| Jul 7, 2026 | Department of DefenseW075 ENDIST SAN FRAN | W912P725CA018 | 237990 | PROJECT DESCRIPTION: THIS PROJECT IS FOR THE REACH 6 LEVEE AND FLOODWALL CONSTRUCTION ALONG THE CORRALITOS CREEK, A TRIBUTARY OF THE PAJARO RIVER LEVEE SYSTEM IN THE CITY OF WATSONVILLE, COUNTY OF SANTA CRUZ. | $70K |
| Jul 1, 2026 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $85K |
| Jun 12, 2026 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $7.0M |
| Jun 11, 2026 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0006 | 237990 | HCR RODS REPLACEMENT | $6K |
| Jun 5, 2026 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056726F00019N | 237310 | CONSTRUCTION SERVICES FOR PROJECT ID BOUNDARY 5806 (3)B, RIVERSIDE ROAD IMPROVEMENTS B. THE WORK CONSISTS OF GRADING, DRAINAGE, BASE, SUBEXCAVATION, CULVERTS AND PAVING. | $21K |
| May 27, 2026 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0006 | 237990 | HCR RODS REPLACEMENT | $402K |
| May 27, 2026 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $187K |
| May 26, 2026 | Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION | 70B01C25F00000194 | 236220 | BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION | $15M |
| May 21, 2026 | Department of DefenseW076 ENDIST FT WORTH | W9126G24C0032 | 237990 | DESIGN BID BUILD CONSTRUCTION FOR RAIL YARD IMPROVEMENTS AT FORT BLISS, TEXAS | $4.3M |
| May 18, 2026 | Department of DefenseW075 ENDIST SAN FRAN | W912P725CA018 | 237990 | PROJECT DESCRIPTION: THIS PROJECT IS FOR THE REACH 6 LEVEE AND FLOODWALL CONSTRUCTION ALONG THE CORRALITOS CREEK, A TRIBUTARY OF THE PAJARO RIVER LEVEE SYSTEM IN THE CITY OF WATSONVILLE, COUNTY OF SANTA CRUZ. | $277K |
| May 15, 2026 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0006 | 237990 | HCR RODS REPLACEMENT | $1.1M |
| May 14, 2026 | Department of DefenseFA5000 673 CONS LGC | FA500026F0059 | 324121 | ASPHALT PRODUCTS (FY26) | $250K |
| Apr 27, 2026 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056726F00019N | 237310 | CONSTRUCTION SERVICES FOR PROJECT ID BOUNDARY 5806 (3)B, RIVERSIDE ROAD IMPROVEMENTS B. THE WORK CONSISTS OF GRADING, DRAINAGE, BASE, SUBEXCAVATION, CULVERTS AND PAVING. | $316K |
| Apr 27, 2026 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247319F4407 | 237310 | IGF::OT::IGF X001 P222- F-35 VERTICAL LANDING PADS AND TAXIWAY AT | $70K |
| Apr 27, 2026 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $59K |
| Apr 23, 2026 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $16K |
| Apr 17, 2026 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $3.5M |
| Apr 8, 2026 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056726F00059N | 237310 | FUNDS CONSTRUCTION PROJECT ID BOR SRAO TCROWN(1), CROWN POINT TRAIL AND PARKING AREA. WORK INCLUDES TRAIL CONSTRUCTION, TRAIL RESURFACING, SLOPE REPAIR, AND PAVING. TOTAL LENGTH IS 2.7 MILES. LOCATED IN VALLEY COUNTY, IDAHO. | $1.5M |
| Apr 1, 2026 | Department of DefenseNAVFACSYSCOM MARIANAS | N6274222C1329 | 237120 | N62742-22-C-1329, FY18 MCON P-661 NAVY-COMMERCIAL TIE-IN HARDENING JOINT REGION MARIANAS, GUAM | $144K |
| Mar 31, 2026 | Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION | 70B01C25F00000194 | 236220 | BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION | $9.5M |
| Mar 17, 2026 | Department of DefenseW076 ENDIST FT WORTH | W9126G25C0003 | 237990 | ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS | $250K |
| Mar 16, 2026 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056723C000008 | 237310 | THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F | $950K |
| Mar 16, 2026 | Department of DefenseW076 ENDIST FT WORTH | W9126G25C0003 | 237990 | ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS | $415K |
| Mar 12, 2026 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $151K |
| Mar 9, 2026 | Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION | 70B01C26F00000165 | 236220 | BORDER WALL CONSTRUCTION- VERTICAL BARRIER, LAREDO TEXAS SECTOR, LRT-4 | $512M |
| Mar 6, 2026 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $1.6M |
| Feb 6, 2026 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $4.0M |
| Feb 5, 2026 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $121K |
| Jan 29, 2026 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $9K |
| Jan 21, 2026 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056726F00019N | 237310 | CONSTRUCTION SERVICES FOR PROJECT ID BOUNDARY 5806 (3)B, RIVERSIDE ROAD IMPROVEMENTS B. THE WORK CONSISTS OF GRADING, DRAINAGE, BASE, SUBEXCAVATION, CULVERTS AND PAVING. | $8.0M |
| Dec 4, 2025 | Department of DefenseW076 ENDIST FT WORTH | W9126G25C0003 | 237990 | ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS | $123K |
| Dec 3, 2025 | Department of DefenseW076 ENDIST FT WORTH | W9126G25C0003 | 237990 | ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS | $82K |
| Nov 25, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $299K |
| Nov 17, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $54K |
| Nov 17, 2025 | Department of DefenseNAVFACSYSCOM MARIANAS | N6274222C1329 | 237120 | N62742-22-C-1329, FY18 MCON P-661 NAVY-COMMERCIAL TIE-IN HARDENING JOINT REGION MARIANAS, GUAM | $100K |
| Nov 13, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $150K |
| Nov 6, 2025 | Department of DefenseW076 ENDIST FT WORTH | W9126G24C0032 | 237990 | DESIGN BID BUILD CONSTRUCTION FOR RAIL YARD IMPROVEMENTS AT FORT BLISS, TEXAS | $83K |
| Nov 5, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823C0014 | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $600K |
| Oct 10, 2025 | Department of DefenseW076 ENDIST FT WORTH | W9126G25C0003 | 237990 | ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS | $14K |
| Oct 9, 2025 | Department of DefenseW076 ENDIST FT WORTH | W9126G24C0032 | 237990 | DESIGN BID BUILD CONSTRUCTION FOR RAIL YARD IMPROVEMENTS AT FORT BLISS, TEXAS | $1.6M |
| Sep 18, 2025 | Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION | 70B01C25F00000194 | 236220 | BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION | $908K |
| Sep 15, 2025 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056725C000008 | 237310 | FUND CONSTRUCTION PROJECT OR FLAP UMATILLA 582(1), MILL CREEK ROAD. WORK INCLUDES CHIP SEAL, CRUSHED AGGREGATE, GRADING, REPAIR OF SOLDIER PILE WALLS WITH ANCHORED WIRE MESH, SIGNING, TRAFFIC CONTROL, AND EROSION CONTROL. | $300K |
| Sep 12, 2025 | Department of DefenseFA8201 AFSC OL H PZIO | FA820125FG163 | 324121 | MISCELLANEOUS CONSTRUCTION MATERIALS | $18K |
Get Alerted Before Granite Construction Company Guam's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.