Skip to content

Federal Contractor Profile

Granite Construction Company Guam

$1.7B obligated·138 awards·7 agencies·10 NAICS

Federal Contracts

Showing award actions 1–50 of 353 funded award actions, most recent first.

Contracts with positive obligations
138
Funded award actions shown
353
Obligations shown
$1.7B
Awarding agencies
7

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of September 18, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Sep 18, 2026Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION70B01C25F00000194236220BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION$4.9M
Sep 14, 2026Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION70B01C26F00000165236220BORDER WALL CONSTRUCTION- VERTICAL BARRIER, LAREDO TEXAS SECTOR, LRT-4$2.7M
Sep 8, 2026Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056726C000017237310MT FLAP BLACKF 12(1) & MT NP GLAC 12(2), FLAP & FLTP REHABILITATION OF TWO MEDICINE ROAD: CONSTRUCTION SERVICES ON WFL PROJECT MT FLAP BLACKF 12(1) & MT NP GLAC 12(2), FLAP & FLTP REHABILITATION OF TWO MEDICINE ROAD. THIS WORK CONSIST$482K
Aug 28, 2026Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056726C000017237310MT FLAP BLACKF 12(1) & MT NP GLAC 12(2), FLAP & FLTP REHABILITATION OF TWO MEDICINE ROAD: CONSTRUCTION SERVICES ON WFL PROJECT MT FLAP BLACKF 12(1) & MT NP GLAC 12(2), FLAP & FLTP REHABILITATION OF TWO MEDICINE ROAD. THIS WORK CONSIST$24M
Aug 7, 2026Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056726F00019N237310CONSTRUCTION SERVICES FOR PROJECT ID BOUNDARY 5806 (3)B, RIVERSIDE ROAD IMPROVEMENTS B. THE WORK CONSISTS OF GRADING, DRAINAGE, BASE, SUBEXCAVATION, CULVERTS AND PAVING.$950K
Jul 23, 2026Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$4.0M
Jul 16, 2026Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$659K
Jul 7, 2026Department of DefenseW075 ENDIST SAN FRANW912P725CA018237990PROJECT DESCRIPTION: THIS PROJECT IS FOR THE REACH 6 LEVEE AND FLOODWALL CONSTRUCTION ALONG THE CORRALITOS CREEK, A TRIBUTARY OF THE PAJARO RIVER LEVEE SYSTEM IN THE CITY OF WATSONVILLE, COUNTY OF SANTA CRUZ.$70K
Jul 1, 2026Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$85K
Jun 12, 2026Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$7.0M
Jun 11, 2026Department of DefenseW075 ENDIST SACRAMENTOW9123823C0006237990HCR RODS REPLACEMENT$6K
Jun 5, 2026Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056726F00019N237310CONSTRUCTION SERVICES FOR PROJECT ID BOUNDARY 5806 (3)B, RIVERSIDE ROAD IMPROVEMENTS B. THE WORK CONSISTS OF GRADING, DRAINAGE, BASE, SUBEXCAVATION, CULVERTS AND PAVING.$21K
May 27, 2026Department of DefenseW075 ENDIST SACRAMENTOW9123823C0006237990HCR RODS REPLACEMENT$402K
May 27, 2026Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$187K
May 26, 2026Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION70B01C25F00000194236220BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION$15M
May 21, 2026Department of DefenseW076 ENDIST FT WORTHW9126G24C0032237990DESIGN BID BUILD CONSTRUCTION FOR RAIL YARD IMPROVEMENTS AT FORT BLISS, TEXAS$4.3M
May 18, 2026Department of DefenseW075 ENDIST SAN FRANW912P725CA018237990PROJECT DESCRIPTION: THIS PROJECT IS FOR THE REACH 6 LEVEE AND FLOODWALL CONSTRUCTION ALONG THE CORRALITOS CREEK, A TRIBUTARY OF THE PAJARO RIVER LEVEE SYSTEM IN THE CITY OF WATSONVILLE, COUNTY OF SANTA CRUZ.$277K
May 15, 2026Department of DefenseW075 ENDIST SACRAMENTOW9123823C0006237990HCR RODS REPLACEMENT$1.1M
May 14, 2026Department of DefenseFA5000 673 CONS LGCFA500026F0059324121ASPHALT PRODUCTS (FY26)$250K
Apr 27, 2026Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056726F00019N237310CONSTRUCTION SERVICES FOR PROJECT ID BOUNDARY 5806 (3)B, RIVERSIDE ROAD IMPROVEMENTS B. THE WORK CONSISTS OF GRADING, DRAINAGE, BASE, SUBEXCAVATION, CULVERTS AND PAVING.$316K
Apr 27, 2026Department of DefenseNAVFACSYSCOM SOUTHWESTN6247319F4407237310IGF::OT::IGF X001 P222- F-35 VERTICAL LANDING PADS AND TAXIWAY AT$70K
Apr 27, 2026Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$59K
Apr 23, 2026Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$16K
Apr 17, 2026Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$3.5M
Apr 8, 2026Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056726F00059N237310FUNDS CONSTRUCTION PROJECT ID BOR SRAO TCROWN(1), CROWN POINT TRAIL AND PARKING AREA. WORK INCLUDES TRAIL CONSTRUCTION, TRAIL RESURFACING, SLOPE REPAIR, AND PAVING. TOTAL LENGTH IS 2.7 MILES. LOCATED IN VALLEY COUNTY, IDAHO.$1.5M
Apr 1, 2026Department of DefenseNAVFACSYSCOM MARIANASN6274222C1329237120N62742-22-C-1329, FY18 MCON P-661 NAVY-COMMERCIAL TIE-IN HARDENING JOINT REGION MARIANAS, GUAM$144K
Mar 31, 2026Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION70B01C25F00000194236220BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION$9.5M
Mar 17, 2026Department of DefenseW076 ENDIST FT WORTHW9126G25C0003237990ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS$250K
Mar 16, 2026Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056723C000008237310THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F$950K
Mar 16, 2026Department of DefenseW076 ENDIST FT WORTHW9126G25C0003237990ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS$415K
Mar 12, 2026Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$151K
Mar 9, 2026Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION70B01C26F00000165236220BORDER WALL CONSTRUCTION- VERTICAL BARRIER, LAREDO TEXAS SECTOR, LRT-4$512M
Mar 6, 2026Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$1.6M
Feb 6, 2026Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$4.0M
Feb 5, 2026Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$121K
Jan 29, 2026Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$9K
Jan 21, 2026Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056726F00019N237310CONSTRUCTION SERVICES FOR PROJECT ID BOUNDARY 5806 (3)B, RIVERSIDE ROAD IMPROVEMENTS B. THE WORK CONSISTS OF GRADING, DRAINAGE, BASE, SUBEXCAVATION, CULVERTS AND PAVING.$8.0M
Dec 4, 2025Department of DefenseW076 ENDIST FT WORTHW9126G25C0003237990ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS$123K
Dec 3, 2025Department of DefenseW076 ENDIST FT WORTHW9126G25C0003237990ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS$82K
Nov 25, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$299K
Nov 17, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$54K
Nov 17, 2025Department of DefenseNAVFACSYSCOM MARIANASN6274222C1329237120N62742-22-C-1329, FY18 MCON P-661 NAVY-COMMERCIAL TIE-IN HARDENING JOINT REGION MARIANAS, GUAM$100K
Nov 13, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$150K
Nov 6, 2025Department of DefenseW076 ENDIST FT WORTHW9126G24C0032237990DESIGN BID BUILD CONSTRUCTION FOR RAIL YARD IMPROVEMENTS AT FORT BLISS, TEXAS$83K
Nov 5, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$600K
Oct 10, 2025Department of DefenseW076 ENDIST FT WORTHW9126G25C0003237990ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS$14K
Oct 9, 2025Department of DefenseW076 ENDIST FT WORTHW9126G24C0032237990DESIGN BID BUILD CONSTRUCTION FOR RAIL YARD IMPROVEMENTS AT FORT BLISS, TEXAS$1.6M
Sep 18, 2025Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION70B01C25F00000194236220BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION$908K
Sep 15, 2025Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056725C000008237310FUND CONSTRUCTION PROJECT OR FLAP UMATILLA 582(1), MILL CREEK ROAD. WORK INCLUDES CHIP SEAL, CRUSHED AGGREGATE, GRADING, REPAIR OF SOLDIER PILE WALLS WITH ANCHORED WIRE MESH, SIGNING, TRAFFIC CONTROL, AND EROSION CONTROL.$300K
Sep 12, 2025Department of DefenseFA8201 AFSC OL H PZIOFA820125FG163324121MISCELLANEOUS CONSTRUCTION MATERIALS$18K

Get Alerted Before Granite Construction Company Guam's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start for free