Federal Contractor Profile
Head, LLC
Federal contracting record: $49M obligated across 17 awards from 1 agencies, FY 2016–2026.
Company Profile
Parent UEI (Unique Entity Identifier)
U6SSD32NGXH4
CAGE Code
0CHP1
Address
4477 E 5TH AVE, COLUMBUS, OH, 432191817
First Federal Award
Nov 23, 2015
Most Recent Award
May 29, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- Department of Defense$49M
100.0% of total obligations
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| May 1, 2026 | Department of DefenseW071 ENDIST OMAHA | 237310 | REPAIR HARDSTANDS AROUND BUILDINGS 2792, 2992, 3092, AND 3292 AT FORT CARSON, CO | $346K |
| Apr 27, 2026 | Department of DefenseW071 ENDIST OMAHA | 237310 | CURRENTLY INSTALLED AIRFIELD LIGHTING INCLUDES HALOGEN AND INCANDESCENT AIRFIELD LIGHTING FIXTURES AT LOCATIONS ON THE HELIPORT, THEY WILL BE REMOVED AND REPLACED WITH NEW LED FIXTURES. | $245K |
| Sep 30, 2025 | Department of DefenseW071 ENDIST OMAHA | 237310 | REPAIR HARDSTANDS AROUND BUILDINGS 2792, 2992, 3092, AND 3292 AT FORT CARSON, CO | $2.6M |
| Sep 26, 2025 | Department of DefenseW071 ENDIST OMAHA | 237310 | CURRENTLY INSTALLED AIRFIELD LIGHTING INCLUDES HALOGEN AND INCANDESCENT AIRFIELD LIGHTING FIXTURES AT LOCATIONS ON THE HELIPORT, THEY WILL BE REMOVED AND REPLACED WITH NEW LED FIXTURES. | $1.4M |
| Sep 15, 2025 | Department of DefenseW071 ENDIST OMAHA | 237310 | REPAIR PARKING LOTS AT BUILDING 2355, BUILDING 2357, AND BUILDING 2359 TO INCLUDE FULL DEPTH REPLACEMENT OF ASPHALT AS WELL AS ALLOWANCES FOR CURB AND GUTTER REPAIR FT. CARSON CO. W59XQG52470330 | $1.0M |
| May 9, 2025 | Department of DefenseW071 ENDIST OMAHA | 237310 | THIS PROJECT WILL REPAIR THE EXISTING ASPHALT PAVEMENT BY CRACK SEALING AND SELECTIVE MILL/OVERLAY. TAXIWAY A WILL BE MILLED AND OVERLAID WITH 2-INCHES OF ACC. | $2.6M |
| May 8, 2025 | Department of DefenseW071 ENDIST OMAHA | 237310 | MASLR | $178K |
| Feb 17, 2025 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | 237310 | THE 169TH FIGHTER WING REQUIRES A CONTRACTOR TO SEAL CRACKS AND JOINTS ON AIRFIELD PAVEMENT. CONTRACTOR WILL FURNISH ALL NECESSARY MATERIAL, EQUIPMENT, LABOR, MSDSS, TOOLS, AND TRANSPORTATION NEEDED TO ACCOMPLISH THIS WORK AT MCENTIRE JNGB. | $61K |
| Jan 23, 2025 | Department of DefenseW071 ENDIST OMAHA | 237310 | MASLR | $8K |
| Jan 21, 2025 | Department of DefenseFA3099 47 CONF CC | 237310 | THIS PROJECT IS FOR REPAIR BY MILL AND OVERLAY SEVERAL SECTIONS OF THE OVERRUNS ON THE CENTER RUNWAY TO INCLUDE EDGE LIGHTING TO BRING IT UP TO CURRENT STANDARDS | $10K |
| Jan 15, 2025 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $11K |
| Jan 15, 2025 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $7K |
| Jan 7, 2025 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $10K |
| Jan 7, 2025 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $32K |
| Nov 8, 2024 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | 237310 | REPAIR & WIDEN TAXIWAY PHASE II | $9.8M |
| Oct 31, 2024 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | 237310 | PSTE 159098 CONSTRUCT HAZARDOUS CARGO PAD ON MCENTIRE JNGB, EASTOVER SOUTH CAROLINA. CONSTRUCTION INCLUDES GRADING, COMPACTION, SITE PREPARATION, BASE COARSE INSTALLATION, ASPHALT INSTALLATION, PAINTING, AND LIMITED ELECTRICAL WORK. | $71K |
| Sep 3, 2024 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $9K |
| Aug 22, 2024 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | 237310 | PSTE 159098 CONSTRUCT HAZARDOUS CARGO PAD ON MCENTIRE JNGB, EASTOVER SOUTH CAROLINA. CONSTRUCTION INCLUDES GRADING, COMPACTION, SITE PREPARATION, BASE COARSE INSTALLATION, ASPHALT INSTALLATION, PAINTING, AND LIMITED ELECTRICAL WORK. | $824K |
| Aug 14, 2024 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $9K |
| Jul 9, 2024 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $466K |
| Jun 14, 2024 | Department of DefenseFA3099 47 CONF CC | 237310 | THIS PROJECT IS FOR REPAIR BY MILL AND OVERLAY SEVERAL SECTIONS OF THE OVERRUNS ON THE CENTER RUNWAY TO INCLUDE EDGE LIGHTING TO BRING IT UP TO CURRENT STANDARDS | $16K |
| May 17, 2024 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $59K |
| May 17, 2024 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $14K |
| Feb 23, 2024 | Department of DefenseFA3099 47 CONF CC | 237310 | THIS PROJECT IS FOR REPAIR BY MILL AND OVERLAY SEVERAL SECTIONS OF THE OVERRUNS ON THE CENTER RUNWAY TO INCLUDE EDGE LIGHTING TO BRING IT UP TO CURRENT STANDARDS | $45K |
| Dec 22, 2023 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | 237310 | PSTE 159098 CONSTRUCT HAZARDOUS CARGO PAD ON MCENTIRE JNGB, EASTOVER SOUTH CAROLINA. CONSTRUCTION INCLUDES GRADING, COMPACTION, SITE PREPARATION, BASE COARSE INSTALLATION, ASPHALT INSTALLATION, PAINTING, AND LIMITED ELECTRICAL WORK. | $8.8M |
Top Compensated Officers
From FFATA executive compensation disclosures. Reported when federal contract activity exceeds the statutory threshold.
- $2.2M
JAMES HEAD
Rank 1 · Reported Jan 26, 2024
- $450K
PAUL ONDERA
Rank 2 · Reported Jan 26, 2024
- $304K
JOHN RODDY
Rank 3 · Reported Sep 21, 2018
- $200K
AL HARTWIG
Rank 4 · Reported Jan 26, 2024
- $184K
CHRIS BANDEL
Rank 5 · Reported Jan 26, 2024
Want to win work like Head, LLC?
Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.