Federal Contractor Profile
Head, LLC
$49M obligated·17 awards·1 agencies·2 NAICS
Federal Contracts
Showing award actions 1–34 of 34 funded award actions, most recent first.
- Contracts with positive obligations
- 17
- Funded award actions shown
- 34
- Obligations shown
- $49M
- Awarding agencies
- 1
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of May 29, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| May 1, 2026 | Department of DefenseW071 ENDIST OMAHA | W9128F25FA194 | 237310 | REPAIR HARDSTANDS AROUND BUILDINGS 2792, 2992, 3092, AND 3292 AT FORT CARSON, CO | $346K |
| Apr 27, 2026 | Department of DefenseW071 ENDIST OMAHA | W9128F25FA180 | 237310 | CURRENTLY INSTALLED AIRFIELD LIGHTING INCLUDES HALOGEN AND INCANDESCENT AIRFIELD LIGHTING FIXTURES AT LOCATIONS ON THE HELIPORT, THEY WILL BE REMOVED AND REPLACED WITH NEW LED FIXTURES. | $245K |
| Sep 30, 2025 | Department of DefenseW071 ENDIST OMAHA | W9128F25FA194 | 237310 | REPAIR HARDSTANDS AROUND BUILDINGS 2792, 2992, 3092, AND 3292 AT FORT CARSON, CO | $2.6M |
| Sep 26, 2025 | Department of DefenseW071 ENDIST OMAHA | W9128F25FA180 | 237310 | CURRENTLY INSTALLED AIRFIELD LIGHTING INCLUDES HALOGEN AND INCANDESCENT AIRFIELD LIGHTING FIXTURES AT LOCATIONS ON THE HELIPORT, THEY WILL BE REMOVED AND REPLACED WITH NEW LED FIXTURES. | $1.4M |
| Sep 15, 2025 | Department of DefenseW071 ENDIST OMAHA | W9128F25FA165 | 237310 | REPAIR PARKING LOTS AT BUILDING 2355, BUILDING 2357, AND BUILDING 2359 TO INCLUDE FULL DEPTH REPLACEMENT OF ASPHALT AS WELL AS ALLOWANCES FOR CURB AND GUTTER REPAIR FT. CARSON CO. W59XQG52470330 | $1.0M |
| May 9, 2025 | Department of DefenseW071 ENDIST OMAHA | W9128F25FA029 | 237310 | THIS PROJECT WILL REPAIR THE EXISTING ASPHALT PAVEMENT BY CRACK SEALING AND SELECTIVE MILL/OVERLAY. TAXIWAY A WILL BE MILLED AND OVERLAID WITH 2-INCHES OF ACC. | $2.6M |
| May 8, 2025 | Department of DefenseW071 ENDIST OMAHA | W9128F24F0003 | 237310 | MASLR | $178K |
| Feb 17, 2025 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | W50S9525CA001 | 237310 | THE 169TH FIGHTER WING REQUIRES A CONTRACTOR TO SEAL CRACKS AND JOINTS ON AIRFIELD PAVEMENT. CONTRACTOR WILL FURNISH ALL NECESSARY MATERIAL, EQUIPMENT, LABOR, MSDSS, TOOLS, AND TRANSPORTATION NEEDED TO ACCOMPLISH THIS WORK AT MCENTIRE JNGB. | $61K |
| Jan 23, 2025 | Department of DefenseW071 ENDIST OMAHA | W9128F24F0003 | 237310 | MASLR | $8K |
| Jan 21, 2025 | Department of DefenseFA3099 47 CONF CC | FA309923C0006 | 237310 | THIS PROJECT IS FOR REPAIR BY MILL AND OVERLAY SEVERAL SECTIONS OF THE OVERRUNS ON THE CENTER RUNWAY TO INCLUDE EDGE LIGHTING TO BRING IT UP TO CURRENT STANDARDS | $10K |
| Jan 15, 2025 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | W912QG23C0002 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $11K |
| Jan 15, 2025 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | W912QG23C0002 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $7K |
| Jan 7, 2025 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | W912QG23C0002 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $10K |
| Jan 7, 2025 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | W912QG23C0002 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $32K |
| Nov 8, 2024 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | W50S9525C0001 | 237310 | REPAIR & WIDEN TAXIWAY PHASE II | $9.8M |
| Oct 31, 2024 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | W50S9524C0001 | 237310 | PSTE 159098 CONSTRUCT HAZARDOUS CARGO PAD ON MCENTIRE JNGB, EASTOVER SOUTH CAROLINA. CONSTRUCTION INCLUDES GRADING, COMPACTION, SITE PREPARATION, BASE COARSE INSTALLATION, ASPHALT INSTALLATION, PAINTING, AND LIMITED ELECTRICAL WORK. | $71K |
| Sep 3, 2024 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | W912QG23C0002 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $9K |
| Aug 22, 2024 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | W50S9524C0001 | 237310 | PSTE 159098 CONSTRUCT HAZARDOUS CARGO PAD ON MCENTIRE JNGB, EASTOVER SOUTH CAROLINA. CONSTRUCTION INCLUDES GRADING, COMPACTION, SITE PREPARATION, BASE COARSE INSTALLATION, ASPHALT INSTALLATION, PAINTING, AND LIMITED ELECTRICAL WORK. | $824K |
| Aug 14, 2024 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | W912QG23C0002 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $9K |
| Jul 9, 2024 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | W912QG23C0002 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $466K |
| Jun 14, 2024 | Department of DefenseFA3099 47 CONF CC | FA309923C0006 | 237310 | THIS PROJECT IS FOR REPAIR BY MILL AND OVERLAY SEVERAL SECTIONS OF THE OVERRUNS ON THE CENTER RUNWAY TO INCLUDE EDGE LIGHTING TO BRING IT UP TO CURRENT STANDARDS | $16K |
| May 17, 2024 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | W912QG23C0002 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $14K |
| May 17, 2024 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | W912QG23C0002 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $59K |
| Feb 23, 2024 | Department of DefenseFA3099 47 CONF CC | FA309923C0006 | 237310 | THIS PROJECT IS FOR REPAIR BY MILL AND OVERLAY SEVERAL SECTIONS OF THE OVERRUNS ON THE CENTER RUNWAY TO INCLUDE EDGE LIGHTING TO BRING IT UP TO CURRENT STANDARDS | $45K |
| Dec 22, 2023 | Department of DefenseW7NZ USPFO ACTIVITY SCANG 169 | W50S9524C0001 | 237310 | PSTE 159098 CONSTRUCT HAZARDOUS CARGO PAD ON MCENTIRE JNGB, EASTOVER SOUTH CAROLINA. CONSTRUCTION INCLUDES GRADING, COMPACTION, SITE PREPARATION, BASE COARSE INSTALLATION, ASPHALT INSTALLATION, PAINTING, AND LIMITED ELECTRICAL WORK. | $8.8M |
| Dec 7, 2023 | Department of DefenseW071 ENDIST OMAHA | W9128F24F0003 | 237310 | MASLR | $3.0M |
| Sep 8, 2023 | Department of DefenseFA3099 47 CONF CC | FA309923C0006 | 237310 | THIS PROJECT IS FOR REPAIR BY MILL AND OVERLAY SEVERAL SECTIONS OF THE OVERRUNS ON THE CENTER RUNWAY TO INCLUDE EDGE LIGHTING TO BRING IT UP TO CURRENT STANDARDS | $4.6M |
| Jul 6, 2023 | Department of DefenseW7NZ USPFO ACTIVITY SC ARNG | W912QG23C0002 | 237310 | REPAIR AND WIDEN PRIMARY TAXIWAY. REMOVE EXISTING SUBSTANDARD CONCRETE AND ASPHALTIC PAVEMENT ON TAXIWAY A, STARTING BETWEEN TAXIWAYS E AND F AND ENDING AT SOUTH EDGE OF RUNWAY ON TAXIWAY H. | $9.7M |
| Jan 10, 2023 | Department of DefenseW071 ENDIST OMAHA | W9128F23F0034 | 237310 | MINIMUM GUARANTEE - AFP SB MATOC | $3K |
| Sep 21, 2018 | Department of DefenseNAVFACSYSCOM SOUTHEAST | N6945013C1759 | 237310 | IGF::OT::IGF AIRFIELD REPAIRS NAS FT WORTH,TX JRB | $911K |
| Dec 5, 2016 | Department of DefenseNAVFACSYSCOM MID-ATLANTIC | N6945013C1773 | 237310 | IGF::OT::IGF P-456 SIMULATED LHD FLIGHT DECK | $600K |
| Nov 1, 2016 | Department of DefenseW076 ENDIST LITTLE ROCK | W9127S14C6000 | 236220 | IGF::OT::IGF FT BLISS AIRCRAFT ARRESTING SYSTEM - CONSTRUCTION ONLY. | $62K |
| May 10, 2016 | Department of DefenseNAVFACSYSCOM SOUTHEAST | N6945014C0767 | 237310 | IGF::OT::IGF AIRFIELD REPAIRS, NAS CORPUS CHRISTI, TEXAS | $1.8M |
| Feb 19, 2016 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ14C4017 | 237310 | IGF::OT::IGF TAXIWAY E, F AND APRONS PAVEMENT AND CONCRETE WORK, REPAIR OR REPLACE MATERIALS. | $42K |
Get Alerted Before Head, LLC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free