Federal Contractor Profile
Kenneth Hahn Architects INC
$60M obligated·276 awards·4 agencies·2 NAICS
Federal Contracts
Showing contracts 1–50 of 359 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Oct 28, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823F0008 | 541330 | PROJECT TITLE AND LOCATION: FY 2024 DEFENSE LOGISTICS AGENCY (DLA) REPAIRS AND IMPROVEMENTS, SIERRA ARMY DEPOT, CA (100% DESIGN). | $33K |
| Sep 29, 2025 | Department of DefenseFA4528 5 CONS | FA452825F0073 | 541330 | THE A-E FIRM SHALL VALIDATE THE PROJECT REQUIREMENTS AND PREPARE A REVISED DRAFT AND FINAL DD1391. RENOVATE IMF FOR LRSO BUILDING 1134 AT MINOT AFB, ND WILL COVER ONLY A PORTION OF THE BUILDINGS FOOTPRINT TO INCLUDE ADMIN SPACE AND WORK BAY AREA. | $25K |
| Sep 26, 2025 | Department of DefenseFA4528 5 CONS | FA452825F0072 | 541330 | THE A-E FIRM SHALL VALIDATE THE PROJECT REQUIREMENTS AND PREPARE A REVISED DRAFT AND FINAL DD1391. IT WILL ALSO PROVIDE THE DESIGNER WITH A BASIS FOR UNDERSTANDING THE PROJECT REQUIREMENTS AND ESTABLISHES A FRAMEWORK FOR PROJECT EXECUTION. | $204K |
| Sep 26, 2025 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ24F4024 | 541330 | ACP GATE DESIGN | $54K |
| Sep 26, 2025 | Department of DefenseFA4528 5 CONS | FA452825F0073 | 541330 | THE A-E FIRM SHALL VALIDATE THE PROJECT REQUIREMENTS AND PREPARE A REVISED DRAFT AND FINAL DD1391. RENOVATE IMF FOR LRSO BUILDING 1134 AT MINOT AFB, ND WILL COVER ONLY A PORTION OF THE BUILDINGS FOOTPRINT TO INCLUDE ADMIN SPACE AND WORK BAY AREA. | $163K |
| Sep 26, 2025 | Department of DefenseFA4528 5 CONS | FA452825F0071 | 541330 | THE A-E FIRM SHALL VALIDATE THE PROJECT SCOPE, SITE, REQUIREMENTS, COSTS, AND PREPARE A REVISED DRAFT AND FINAL DD1391. THE RENOVATE B-52 SQUADRON OPS BUILDING, B475 WILL COVER ONLY THE 3RD FLOOR, TO INCLUDE SPECIAL ACCESS PROGRAM FACILITY (SAPF). | $206K |
| Sep 11, 2025 | Department of DefenseFA4528 5 CONS | FA452825F0052 | 541330 | THE A-E DESIGN SERVICES INCLUDE, BUT NOT LIMITED TO, RECONSTRUCTION OF FLIGHTLINE DRIVE: STORM SEWER, DRAINAGE, SUBGRADE, PAVEMENTS, CURB, GUTTER, SIGNAGE, PAVEMENT MARKINGS, AND OTHER INCIDENTAL FEATURES TO MEET FUTURE TRAFFIC LOADINGS. | $485K |
| Aug 25, 2025 | Department of DefenseW071 ENDIST OMAHA | W9128F25FA128 | 541330 | DESIGN DPAA FORENSIC LABORATORY FACILITY AT OFFUTT AIR FORCE BASE, NEBRASKA | $1.1M |
| Aug 12, 2025 | Department of DefenseW071 ENDIST OMAHA | W9128F24F0268 | 541330 | PCR FOR DEMOLISH BLDGS 501, 522, AND 597 | $16K |
| Jul 11, 2025 | Department of DefenseFA4528 5 CONS | FA452825F0035 | 541330 | DESIGN THE REPLACEMENT OF THE HVAC SYSTEM IN BUILDING 774 PMEL TO MEET ALL REGULATORY REQUIREMENTS. | $211K |
| Jul 3, 2025 | Department of DefenseFA4659 319 CONS PK | FA465923C0005 | 541310 | JFSD201806CR CR-AT-SECURITY ENHANCEMENTS CMRCL GATE | $5K |
| Jul 2, 2025 | Department of DefenseFA4528 5 CONS | FA452825F0036 | 541330 | DESIGN SERVICES TO RECONSTRUCTION OF THE B870 PARKING LOT, INCLUDING STORM SEWER SYSTEMS, DRAINAGE SOLUTIONS, SUBGRADE IMPROVEMENTS, PAVEMENTS, CURBS, GUTTERS, PAVEMENT MARKINGS, AND OTHER FEATURES TO ACCOMMODATE CURRENT AND PLANNED PARKING LOADS. | $154K |
| Jun 17, 2025 | Department of DefenseFA4621 22 CONS PK | FA462125C0003 | 541310 | THE ARCHITECT-ENGINEER (A-E) WILL PROVIDE POST AWARD CONSTRUCTION A-E TITLE II SITE AND INSPECTION SERVICES IN SUPPORT OF THE CONSTRUCTION PROJECT 195777, CONSTRUCT MILITARY WORKING DOG (MWD) KENNEL, LOCATED AT MCCONNELL AFB, WICHITA, KS. | $91K |
| Apr 28, 2025 | General Services AdministrationPBS R6 CONSTRUCTION ACQUISITION BRANCH | 47PG0223F0084 | 541310 | EDWARD ZORINSKY FEDERAL BUILDING, 1616 CAPITOL AVE OMAHA, NE 68102-4908 WORK ORDER 15 IS ISSUED FOR ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD COMPLAINT REMEDIATION (ABAAS). | $47K |
| Apr 23, 2025 | Department of DefenseFA4528 5 CONS | FA452825F0021 | 541330 | THE A-E DESIGN TEAM CONTRACTOR SHALL PROVIDE A-E DESIGN SERVICES REQUIRED TO DELIVER 100% COMPLETE CONSTRUCTION BID DOCUMENTS NECESSARY FOR THE ACCOMPLISHMENT OF PROJECT NO 1143173. REPLACE ROOF AND REMODEL MOC BATHROOMS, B768. | $102K |
| Apr 18, 2025 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ25FA014 | 541330 | NWK SB AE IDIQ MATOC MINIMUM GUARANTEE- KENNETH HAHN ARCHITECTS, INC. | $3K |
| Apr 2, 2025 | Department of DefenseFA4528 5 CONS | FA452824F0088 | 541330 | ARCHITECT AND ENGINEERING SERVICES INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT | $26K |
| Mar 26, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | W9123823F0008 | 541330 | PROJECT TITLE AND LOCATION: FY 2024 DEFENSE LOGISTICS AGENCY (DLA) REPAIRS AND IMPROVEMENTS, SIERRA ARMY DEPOT, CA (100% DESIGN). | $24K |
| Feb 19, 2025 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ24F4024 | 541330 | ACP GATE DESIGN | $20K |
| Feb 11, 2025 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | 140P2025F0026 | 541310 | THIS PROJECT WILL ALTER AND EXPAND THE EXISTING WASTEWATER TREATMENT PLANT AT MOUNT RUSHMORE NATIONAL MEMORIAL AND ENLARGE THE EXISTING PLANT CAPACITY FOR FLOW AND TREATMENT. THE PLANT PROCESSES WASTEWATER FROM RESTROOMS AND CONCESSION OPERATIONS THA | $449K |
| Sep 27, 2024 | Department of DefenseW071 ENDIST OMAHA | W9128F24F0261 | 541330 | AREA DEVELOPMENT PLAN FOR US STRATEGIC COMMAND | $1.3M |
| Sep 27, 2024 | Department of DefenseW071 ENDIST OMAHA | W9128F24F0268 | 541330 | PCR FOR DEMOLISH BLDGS 501, 522, AND 597 | $1.4M |
| Sep 26, 2024 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ23F4056 | 541330 | BUILDING 61 ELECTRICAL UPDATES | $97K |
| Sep 25, 2024 | Department of the InteriorNORTHEAST REGIONAL CONTRACTING | 140P4224F0085 | 541310 | DESIGN SERVICES FOR WELCOME PARK AT INDEPENDENCE NATIONAL HISTORICAL PARK. | $297K |
| Sep 24, 2024 | General Services AdministrationPBS R6 CONSTRUCTION ACQUISITION BRANCH | 47PG0224F0052 | 541310 | GENERAL SERVICES ADMINISTRATION. WORK ORDER 19 IS ISSUED FOR A FACADE AND HVAC STUDY AT THE EDWARD ZORINSKY FEDERAL BUILDING. 1616 CAPITOL AVE, OMAHA, NE 68102 | $42K |
| Sep 24, 2024 | Department of DefenseW071 ENDIST OMAHA | W9128F24F0190 | 541330 | PCR-1 DELTA 3 PETERSON SFB | $640K |
| Sep 19, 2024 | Department of DefenseFA4528 5 CONS | FA452824F0088 | 541330 | ARCHITECT AND ENGINEERING SERVICES INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT | $402K |
| Sep 13, 2024 | Department of DefenseW071 ENDIST OMAHA | W9128F24F0217 | 541330 | UPGRADE ELECTIRCAL DISTRIBUTION SYS PCR | $393K |
| Sep 11, 2024 | Department of DefenseFA4600 55 CONS PKP | FA460024F0148 | 541330 | DEVELOP DESIGN BUILD RFP PACKAGE DOCUMENTS THAT OUTLINE REPAIRS REQUIRED FOR B44 AND INCLUDES FURTHER DEVELOPMENT OF THE PROVIDED DB TEMPLATE IN A FORMAT THAT CAN BE TAILORED TO PROJECTS OF VARYING SCOPES, DISCIPLINES, AND COST THRESHOLDS. | $70K |
| Aug 30, 2024 | Department of DefenseFA4600 55 CONS PKP | FA460024F0126 | 541330 | DESIGN AN ADDITIONAL NEW ELEVATOR IN THE BUILDING 1003 LOADING DOCK TO THE EXACT SPECIFICATIONS, PARTS, FUNCTION, AND CAPABILITIES AS THE EXISTING FREIGHT ELEVATOR, OR IF NOT, AS SIMILAR AS PHYSICALLY POSSIBLE. | $112K |
| Aug 28, 2024 | Department of DefenseFA4600 55 CONS PKP | FA460024F0109 | 541330 | DESIGN MECHANICAL AND ELECTRICAL CONNECTIONS TO INCLUDE BUILDING MANAGEMENT SYSTEM MODIFICATIONS REQUIRED TO SUPPORT MOBILIZATION, STARTUP, AND CONTINUOUS OPERATIONS OF EXTERNAL AIR-COOLED CHILLERS TO SUPPORT THE C2F CAMPUS COOLING REQUIREMENTS. | $223K |
| Aug 16, 2024 | General Services AdministrationPBS R6 CONSTRUCTION ACQUISITION BRANCH | 47PG0222F0031 | 541310 | DAVENPORT FEDERAL COURTHOUSE, DAVENPORT, IA. TASK ORDER TO PROVIDE FOR AE DESIGN TO REMEDIATE THE ACCESS DEFICIENCIES IDENTIFIED PREVIOUSLY. PROJECT WILL START WITH A PRE-DESIGN PHASE TO EVALUATE THE REQUIREMENTS, FOLLOWED BY DESIGN. | $34K |
| Jul 31, 2024 | General Services AdministrationPBS R6 CONSTRUCTION ACQUISITION BRANCH | 47PG0224F0052 | 541310 | GENERAL SERVICES ADMINISTRATION. WORK ORDER 19 IS ISSUED FOR A FACADE AND HVAC STUDY AT THE EDWARD ZORINSKY FEDERAL BUILDING. 1616 CAPITOL AVE, OMAHA, NE 68102 | $41K |
| Jul 5, 2024 | Department of DefenseFA4528 5 CONS | FA452824F0004 | 541330 | REFRESH THE DESIGN FOR THE REPAIR OF MINUTEMAN DRIVE TO COMPLY WITH ADDITIONAL COMMENTS AND NEW SPECIFICATIONS | $30K |
| Jul 3, 2024 | Department of DefenseFA4600 55 CONS PKP | FA460024F0050 | 541330 | AE DESIGN MECHANICAL VENTILATION SYSTEMS FOR SUB-STATION 5, B457 | $52K |
| Jul 1, 2024 | Department of the InteriorMWR MIDWEST REGION(60000) | 140P6024F0058 | 541310 | FOLS - ALARM SYSTEM TITLE III SERVICES | $70K |
| Jun 21, 2024 | Department of the InteriorMWR MIDWEST REGION(60000) | 140P6023F0060 | 541310 | MWRO MULTI-PARK ALARM SYS | $24K |
| Jun 17, 2024 | Department of the InteriorMWR MIDWEST REGION(60000) | 140P6024F0021 | 541310 | BADL, BEN RIEFEL VISITOR CENTER AE DD-CD SERVICES | $899K |
| Jun 14, 2024 | Department of DefenseFA4600 55 CONS PKP | FA460024F0054 | 541330 | EVALUATE SCIF ELECTRICAL SYSTEM UNDER UTILITY AND GENERATOR POWER, IDENTIFY ISSUES, AND DESIGN A RELIABLE GENERATOR CONNECTION POINT FOR OUTAGES. | $35K |
| Apr 26, 2024 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ24F4025 | 541330 | ACP FEASIBILITY STUDIES | $146K |
| Apr 26, 2024 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ24F4024 | 541330 | ACP GATE DESIGN | $220K |
| Apr 16, 2024 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ23F4056 | 541330 | BUILDING 61 ELECTRICAL UPDATES | $270K |
| Apr 12, 2024 | General Services AdministrationPBS R6 CONSTRUCTION ACQUISITION BRANCH | 47PG0224F0034 | 541310 | GENERAL SERVICES ADMINISTRATION. WORK ORDER 18 IS FOR DESIGN BRIDGING SERVICES TO DEVELOP A NEW FIRE ALARM SYSTEM FOR ROMAN L. HRUSKA U.S. COURTHOUSE. 1343 S 75TH ST, OMAHA, NE 68124. | $89K |
| Mar 28, 2024 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ23F4007 | 541330 | AE DESIGN SECURITY FORCES DOG KENNELS AT MARB | $34K |
| Mar 15, 2024 | Department of DefenseFA4528 5 CONS | FA452824F0006 | 541330 | REDESIGN THE DOCK 8 FIRE ALARM SYSTEM TO COMPLY WITH SUNDOWN FOAM FIRE SUPPRESSION POLICY AND THE STATEMENT OF WORK. | $57K |
| Mar 15, 2024 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | 140P2024F0137 | 541310 | MORU 272051 - DDCD - SPECIFICATIONS | $16K |
| Mar 15, 2024 | Department of DefenseFA4528 5 CONS | FA452824F0004 | 541330 | REFRESH THE DESIGN FOR THE REPAIR OF MINUTEMAN DRIVE TO COMPLY WITH ADDITIONAL COMMENTS AND NEW SPECIFICATIONS | $53K |
| Mar 15, 2024 | Department of DefenseFA4528 5 CONS | FA452824F0018 | 541330 | DESIGN THE REPAIR OF THE ROOF ON BUILDING 1119 IN ACCORDANCE WITH THE STATEMENT OF WORK. | $76K |
| Feb 26, 2024 | General Services AdministrationPBS R6 CONSTRUCTION ACQUISITION BRANCH | 47PG0224F0022 | 541310 | GENERAL SERVICES ADMINISTRATION. WORK ORDER 17 IS FOR DESIGN-BUILD BRIDGING SERVICES FOR THE SIDEWALK PROJECT AT DENNEY FEDERAL BUILDING. WORK WILL TAKE PLACE AT 1343 S 75TH ST, OMAHA, NE 68124-1610. | $129K |
| Feb 15, 2024 | Department of DefenseFA4528 5 CONS | FA452824F0008 | 541330 | THE ARCHITECT-ENGINEER DESIGN SHALL CONDUCT AN ELECTRICAL HAZARD ANALYSIS FOR EACH ROOM WITHIN B1134. SUBMITTALS ARE TO INCLUDE A DESIGN ANALYSIS AND PROFESSIONAL ENGINEER STAMPED DRAWINGS INDICATING HAZARD CLASSIFICATION TYPE AND REGION. | $41K |
Get Alerted Before Kenneth Hahn Architects INC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free