Home/Contractors/Manson Construction CO/contracts

Federal Contractor Profile

Manson Construction CO

$2.73B obligated·213 awards·5 agencies·5 NAICS

Federal Contracts

Showing contracts 150 of 611 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Mar 23, 2026Department of CommerceDEPT OF COMMERCE NOAA1305M423CNAAJ0021237990DESIGN BUILD CONSTRUCTION AT PIER ROMEO IN NORTH CHARLESTON SC.$571K
Jan 14, 2026Department of DefenseNAVFACSYSCOM SOUTHWESTN6247326F0100237990CONSTRUCTS A NEW 69KV SUBSTATION X AND UPGRADES EXISTING FACILITIES AND INFRASTRUCTURE TO INCREASE TOTAL PIER LIMA ELECTRICAL CAPACITY.$45.5M
Jan 8, 2026Department of DefenseNAVFACSYSCOM SOUTHWESTN6247324F4105237990P508: FLOATING DRY DOCK MOORING FACILITY$1.1M
Dec 5, 2025Department of DefenseW075 ENDIST SAN FRANW912P726CA006237990THE WORK INCLUDES ANNUAL MAINTENANCE DREDGING OF THE OAKLAND INNER AND OUTER HARBOR CHANNEL TO -50-FT (MLLW) PLUS 1-FT OF PAID OVER-DEPTH AND TRANSPORTING OF THE DREDGED MATERIAL PER THE REQUIREMENTS IN SPECIFICATION SECTION 00 10 00$23.1M
Nov 26, 2025Department of DefenseW07V ENDIST NEW ORLEANSW912P825F0102237990TASK ORDER #2 - BERWICK BAY HARBOR$4.7M
Nov 21, 2025Department of DefenseW075 ENDIST LOS ANGELESW912PL25C00032379901ST CYC DREDG CHAN ISL -B,C,D,G -1ST 1M$6.9M
Oct 28, 2025Department of DefenseNAVFACSYSCOM SOUTHWESTN6247324F4105237990P508: FLOATING DRY DOCK MOORING FACILITY$228K
Oct 22, 2025Department of DefenseW2SN ENDIST ALASKAW911KB24C00052379902024 - 2026 MAINTENANCE DREDGING, ANCHORAGE HARBOR, ALASKA$8K
Oct 15, 2025Department of DefenseW074 ENDIST JACKSNVLLEW912EP26CA001237990COASTAL STORM RISK MANAGEMENT PROJECT HUTCHINSON ISLAND ST. LUCIE COUNTY, FLORIDA$14.7M
Oct 6, 2025Department of DefenseW2SN ENDIST ALASKAW911KB24C00052379902024 - 2026 MAINTENANCE DREDGING, ANCHORAGE HARBOR, ALASKA$775K
Sep 30, 2025Department of DefenseNAVFACSYSCOM SOUTHEASTN6945025C1079237990DESIGN-BID-BUILD (BBD), FIRM-FIXED-PRICE (FFP), CONSTRUCTION CONTRACT FOR P021 LIGHTERAGE AND SMALL CRAFT FACILITY AT MARINE CORP SUPPORT FACILITY (MCSF) BLOUNT ISLAND COMMAND (BIC), JACKSONVILLE, FLORIDA.$61.1M
Sep 29, 2025Department of DefenseNAVFACSYSCOM NORTHWESTN4425525F0025237990REMOVE AND REPLACE FIVE 14 INCH WOOD PILE AND INSTALL FIVE SACRIFICIAL ANODES TO THE FIVE NEW STEEL PILE. REMOVE AND REPLACE ALL KB DOCKS PIER AND TRESTLE PILE BRACING, CROSS BRACING AND HARDWARE.$52K
Sep 28, 2025Department of DefenseW075 ENDIST LOS ANGELESW912PL25C00032379901ST CYC DREDG CHAN ISL -B,C,D,G -1ST 1M$2.1M
Sep 26, 2025Department of DefenseW071 ENDIST PORTLANDW9127N25C0005237990FY25 WEST COAST HOPPER DREDGING$480K
Sep 22, 2025Department of DefenseW07V ENDIST NEW ORLEANSW912P825F0102237990TASK ORDER #2 - BERWICK BAY HARBOR$1.7M
Sep 19, 2025Department of DefenseNAVFACSYSCOM SOUTHWESTN6247324F4105237990P508: FLOATING DRY DOCK MOORING FACILITY$213K
Sep 19, 2025Department of DefenseW074 ENDIST JACKSNVLLEW912EP25CA010237990FORT PIERCE BEACH RENOURISHMENT, ST. LUCIE COUNTY, FLORIDA SEE PARAGRAPH 1.2.1 OF SPECIFICATIONS SECTION 01 11 00 FOR ADDITIONAL DETAILS.$15.0M
Sep 15, 2025Department of DefenseW07V ENDIST NEW ORLEANSW912P825F0102237990TASK ORDER #2 - BERWICK BAY HARBOR$8.1M
Sep 5, 2025Department of DefenseNAVFACSYSCOM SOUTHWESTN6247324F4105237990P508: FLOATING DRY DOCK MOORING FACILITY$39K
Aug 28, 2025Department of CommerceDEPT OF COMMERCE NOAA1305M423CNAAJ0021237990DESIGN BUILD CONSTRUCTION AT PIER ROMEO IN NORTH CHARLESTON SC.$135K
Aug 27, 2025Department of DefenseW071 ENDIST PORTLANDW9127N25C0005237990FY25 WEST COAST HOPPER DREDGING$1.1M
Aug 20, 2025Department of DefenseW074 ENDIST MOBILEW9127823F0270237990MAINTENANCE DREDGING OF MOBILE HARBOR$3.0M
Aug 18, 2025Department of DefenseW071 ENDIST PORTLANDW9127N25C0005237990FY25 WEST COAST HOPPER DREDGING$160K
Aug 13, 2025Department of DefenseW074 ENDIST MOBILEW9127825FA099237990THE CONTRACTOR SHALL FURNISH THE EQUIPMENT, MATERIALS, SUPPLIES, AND MANPOWER REQUIRED TO PERFORM MAINTENANCE DREDGING OF PANAMA CITY HARBOR. THE WORK TO BE PERFORMED SHALL BE IAW THE PLANS SCHEDULE AS DIRECTED BY THE PANAMA CITY SITE OFFICE.$825K
Aug 11, 2025Department of DefenseW07V ENDIST NEW ORLEANSW912P824C0027237990DREDGING$302K
Aug 6, 2025Department of DefenseW07V ENDIST NEW ORLEANSW912P825C0017237990SOUTHWEST PASS - DREDGING$8.5M
Aug 6, 2025Department of DefenseNAVFACSYSCOM NORTHWESTN4425524F5003237990X003 6030108 1785603 -- (22952620)(SIOP) PIER 5 PILE REPLACEMENT$1.0M
Aug 6, 2025Department of DefenseW07V ENDIST NEW ORLEANSW912P825F0102237990TASK ORDER #2 - BERWICK BAY HARBOR$14.0M
Aug 4, 2025Department of DefenseW075 ENDIST LOS ANGELESW912PL22C0005237990MAINTENANCE DREDGING OCEANSIDE HARBOR, SAN DIEGO COUNTY, CALIFORNIA FIRST CYCLE FY22$189K
Aug 4, 2025Department of DefenseW074 ENDIST MOBILEW9127825F0030237990DREDGING GULFPORT HARBOR CHANNELS$2.1M
Jul 31, 2025Department of CommerceDEPT OF COMMERCE NOAA1305M423CNAAJ0021237990DESIGN BUILD CONSTRUCTION AT PIER ROMEO IN NORTH CHARLESTON SC.$1.5M
Jul 24, 2025Department of DefenseW074 ENDIST JACKSNVLLEW912EP24C0019237990NAVAL SUBMARINE BASE KINGS BAY, ENTRANCE CHANNEL$587K
Jul 23, 2025Department of DefenseW07V ENDIST NEW ORLEANSW912P825C0019237990DREDGING$39.0M
Jul 18, 2025Department of DefenseW07V ENDIST NEW ORLEANSW912P824C0027237990DREDGING$10K
Jul 10, 2025Department of DefenseW071 ENDIST PORTLANDW9127N25C0005237990FY25 WEST COAST HOPPER DREDGING$327K
Jul 2, 2025Department of DefenseW07V ENDIST NEW ORLEANSW912P825F0096237990MINIMUM GUARANTEE$10K
Jul 2, 2025Department of DefenseW071 ENDIST PORTLANDW9127N25C0005237990FY25 WEST COAST HOPPER DREDGING$1.8M
Jun 26, 2025Department of DefenseW07V ENDIST NEW ORLEANSW912P825C0017237990SOUTHWEST PASS - DREDGING$14.0M
Jun 4, 2025Department of DefenseNAVFACSYSCOM SOUTHWESTN6247324F4105237990P508: FLOATING DRY DOCK MOORING FACILITY$1.0M
May 28, 2025Department of DefenseW07V ENDIST NEW ORLEANSW912P824C0042237990NEW ORLEANS TO VENICE, NON FEDERAL LEVEE, FRITCHIE BRACKISH MARSH$372K
May 15, 2025Department of DefenseNAVFACSYSCOM SOUTHWESTN6247324F4105237990P508: FLOATING DRY DOCK MOORING FACILITY$200K
May 12, 2025Department of DefenseW075 ENDIST SAN FRANW912P725C0003237990RICHMOND INNER HARBOR FY25 MAINTENANCE DREDGING$3.1M
May 5, 2025Department of DefenseNAVFACSYSCOM NORTHWESTN4425525F0025237990REMOVE AND REPLACE FIVE 14 INCH WOOD PILE AND INSTALL FIVE SACRIFICIAL ANODES TO THE FIVE NEW STEEL PILE. REMOVE AND REPLACE ALL KB DOCKS PIER AND TRESTLE PILE BRACING, CROSS BRACING AND HARDWARE.$662K
Apr 29, 2025Department of DefenseW075 ENDIST SAN FRANW912P725C0003237990RICHMOND INNER HARBOR FY25 MAINTENANCE DREDGING$1.7M
Apr 24, 2025Department of CommerceDEPT OF COMMERCE NOAA1305M423CNAAJ0021237990DESIGN BUILD CONSTRUCTION AT PIER ROMEO IN NORTH CHARLESTON SC.$1.7M
Apr 18, 2025Department of DefenseW071 ENDIST SEATTLEW912DW22C0006237990LWSC LARGE LOCK CENTER GATE REPLACEMENT$269K
Mar 28, 2025Department of DefenseW07V ENDIST NEW ORLEANSW912P824C0022237990DREDGING$4.0M
Mar 21, 2025Department of DefenseW075 ENDIST LOS ANGELESW912PL22C0005237990MAINTENANCE DREDGING OCEANSIDE HARBOR, SAN DIEGO COUNTY, CALIFORNIA FIRST CYCLE FY22$5.3M
Mar 13, 2025Department of DefenseNAVFACSYSCOM SOUTHWESTN6247324F4105237990P508: FLOATING DRY DOCK MOORING FACILITY$111K
Mar 12, 2025Department of DefenseW075 ENDIST SAN FRANW912P725C0003237990RICHMOND INNER HARBOR FY25 MAINTENANCE DREDGING$230K

Get Alerted Before Manson Construction CO's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free