Federal Contractor Profile
Metro Paving Corp
$67M obligated·14 awards·3 agencies·4 NAICS
Federal Contracts
Showing award actions 1–48 of 48 funded award actions, most recent first.
- Contracts with positive obligations
- 14
- Funded award actions shown
- 48
- Obligations shown
- $67M
- Awarding agencies
- 3
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of June 9, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Jun 9, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000013 | 237310 | PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER PEDESTRIAN/BICYCLE TRAIL ACCESS AND SAFETY IMPROVEMENTS, AND REHABILITATION OF ROCK CREEK AND POTOMAC PARKWAY (ROUTE 16). THE WORK INCLUDES ASPHALT PAVEMENT MILL AND OVER | $743K |
| Mar 13, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000013 | 237310 | PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER PEDESTRIAN/BICYCLE TRAIL ACCESS AND SAFETY IMPROVEMENTS, AND REHABILITATION OF ROCK CREEK AND POTOMAC PARKWAY (ROUTE 16). THE WORK INCLUDES ASPHALT PAVEMENT MILL AND OVER | $1.8M |
| Jan 21, 2026 | Department of DefenseW2SD ENDIST NORFOLK | W9123625F0046 | 237990 | GENERAL SCOPE OF THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: MEIGS DRIVE, SHERMAN DRIVE, SCHLEY DRIVE AND CONNECTING INTERSECTIONS. | $69K |
| Dec 18, 2025 | Department of DefenseW2SD ENDIST NORFOLK | W9123625F0046 | 237990 | GENERAL SCOPE OF THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: MEIGS DRIVE, SHERMAN DRIVE, SCHLEY DRIVE AND CONNECTING INTERSECTIONS. | $110K |
| Oct 29, 2025 | Department of DefenseW2SD ENDIST NORFOLK | W9123624C2011 | 237110 | SANITARY SEWER LINE REPAIR AT ARLINGTON NATIONAL CEMETARY, ARLINGTON, VIRGINIA | $173K |
| Sep 16, 2025 | Department of DefenseW2SD ENDIST NORFOLK | W9123624C2011 | 237110 | SANITARY SEWER LINE REPAIR AT ARLINGTON NATIONAL CEMETARY, ARLINGTON, VIRGINIA | $187K |
| Sep 3, 2025 | Department of DefenseW2SD ENDIST NORFOLK | W9123623F0079 | 237990 | THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: SHERIDAN DRIVE, WILSON DRIVE, MCCLELLAN DRIVE, AND THE WEEKS/GRANT LOOP. | $78K |
| Aug 28, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000013 | 237310 | PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER PEDESTRIAN/BICYCLE TRAIL ACCESS AND SAFETY IMPROVEMENTS, AND REHABILITATION OF ROCK CREEK AND POTOMAC PARKWAY (ROUTE 16). THE WORK INCLUDES ASPHALT PAVEMENT MILL AND OVER | $3.5M |
| Jul 15, 2025 | Department of DefenseW2SD ENDIST NORFOLK | W9123625F0046 | 237990 | GENERAL SCOPE OF THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: MEIGS DRIVE, SHERMAN DRIVE, SCHLEY DRIVE AND CONNECTING INTERSECTIONS. | $316K |
| Jun 30, 2025 | Department of DefenseW2SD ENDIST NORFOLK | W9123625F0046 | 237990 | GENERAL SCOPE OF THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: MEIGS DRIVE, SHERMAN DRIVE, SCHLEY DRIVE AND CONNECTING INTERSECTIONS. | $13M |
| May 28, 2025 | Department of DefenseW2SD ENDIST NORFOLK | W9123624F0073 | 237990 | GENERAL SCOPE OF THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION SECTION OF FARRAGUT DRIVE AND MCPHERSON DRIVE LOCATED AT ARLINGTON NATIONAL CEMETERY IN ARLINGTON, VIRGINIA. | $11K |
| May 20, 2025 | Department of DefenseW2SD ENDIST NORFOLK | W9123623F0079 | 237990 | THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: SHERIDAN DRIVE, WILSON DRIVE, MCCLELLAN DRIVE, AND THE WEEKS/GRANT LOOP. | $18K |
| Jan 31, 2025 | Department of DefenseW2SD ENDIST NORFOLK | W9123623F0079 | 237990 | THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: SHERIDAN DRIVE, WILSON DRIVE, MCCLELLAN DRIVE, AND THE WEEKS/GRANT LOOP. | $60K |
| Dec 11, 2024 | Department of DefenseW2SD ENDIST NORFOLK | W9123623F0079 | 237990 | THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: SHERIDAN DRIVE, WILSON DRIVE, MCCLELLAN DRIVE, AND THE WEEKS/GRANT LOOP. | $30K |
| Nov 7, 2024 | Department of DefenseW2SD ENDIST NORFOLK | W9123624F0061 | 237990 | THIS PROJECT IS TO MILL AND PAVE THE ROOSEVELT-WHEATON PARKING LOT. | $15K |
| Oct 21, 2024 | Department of DefenseW2SD ENDIST NORFOLK | W9123623F0079 | 237990 | THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: SHERIDAN DRIVE, WILSON DRIVE, MCCLELLAN DRIVE, AND THE WEEKS/GRANT LOOP. | $49K |
| Sep 18, 2024 | Department of DefenseW2SD ENDIST NORFOLK | W9123624F0073 | 237990 | GENERAL SCOPE OF THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION SECTION OF FARRAGUT DRIVE AND MCPHERSON DRIVE LOCATED AT ARLINGTON NATIONAL CEMETERY IN ARLINGTON, VIRGINIA. | $3.4M |
| Aug 15, 2024 | Department of DefenseW2SD ENDIST NORFOLK | W9123623F0079 | 237990 | THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: SHERIDAN DRIVE, WILSON DRIVE, MCCLELLAN DRIVE, AND THE WEEKS/GRANT LOOP. | $101K |
| Aug 15, 2024 | Department of DefenseW2SD ENDIST NORFOLK | W9123624F0061 | 237990 | THIS PROJECT IS TO MILL AND PAVE THE ROOSEVELT-WHEATON PARKING LOT. | $541K |
| Jul 26, 2024 | Department of DefenseW2SD ENDIST NORFOLK | W9123623F0079 | 237990 | THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: SHERIDAN DRIVE, WILSON DRIVE, MCCLELLAN DRIVE, AND THE WEEKS/GRANT LOOP. | $15K |
| Jul 3, 2024 | Department of DefenseW2SD ENDIST NORFOLK | W9123623F0079 | 237990 | THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: SHERIDAN DRIVE, WILSON DRIVE, MCCLELLAN DRIVE, AND THE WEEKS/GRANT LOOP. | $58K |
| Jun 21, 2024 | Department of DefenseW2SD ENDIST NORFOLK | W9123624C2011 | 237110 | SANITARY SEWER LINE REPAIR AT ARLINGTON NATIONAL CEMETARY, ARLINGTON, VIRGINIA | $3.9M |
| Mar 1, 2024 | Department of DefenseW2SD ENDIST NORFOLK | W9123623F0079 | 237990 | THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: SHERIDAN DRIVE, WILSON DRIVE, MCCLELLAN DRIVE, AND THE WEEKS/GRANT LOOP. | $72K |
| Oct 16, 2023 | Department of DefenseW2SD ENDIST NORFOLK | W9123623F0052 | 237990 | MEMORIAL AVENUE MILL & PAVE, ARLINGTON NATIONAL CEMETERY | $6K |
| Sep 28, 2023 | Department of DefenseW2SD ENDIST NORFOLK | W9123623F0079 | 237990 | THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: SHERIDAN DRIVE, WILSON DRIVE, MCCLELLAN DRIVE, AND THE WEEKS/GRANT LOOP. | $13M |
| Sep 27, 2023 | Department of DefenseW2SD ENDIST NORFOLK | W9123623F0052 | 237990 | MEMORIAL AVENUE MILL & PAVE, ARLINGTON NATIONAL CEMETERY | $4K |
| Sep 7, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000013 | 237310 | PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER PEDESTRIAN/BICYCLE TRAIL ACCESS AND SAFETY IMPROVEMENTS, AND REHABILITATION OF ROCK CREEK AND POTOMAC PARKWAY (ROUTE 16). THE WORK INCLUDES ASPHALT PAVEMENT MILL AND OVER | $79K |
| Aug 2, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000013 | 237310 | PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER PEDESTRIAN/BICYCLE TRAIL ACCESS AND SAFETY IMPROVEMENTS, AND REHABILITATION OF ROCK CREEK AND POTOMAC PARKWAY (ROUTE 16). THE WORK INCLUDES ASPHALT PAVEMENT MILL AND OVER | $398K |
| Jun 27, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000013 | 237310 | PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER PEDESTRIAN/BICYCLE TRAIL ACCESS AND SAFETY IMPROVEMENTS, AND REHABILITATION OF ROCK CREEK AND POTOMAC PARKWAY (ROUTE 16). THE WORK INCLUDES ASPHALT PAVEMENT MILL AND OVER | $2.1M |
| Jun 27, 2023 | Department of DefenseW2SD ENDIST NORFOLK | W9123623F0052 | 237990 | MEMORIAL AVENUE MILL & PAVE, ARLINGTON NATIONAL CEMETERY | $605K |
| May 16, 2023 | Department of the InteriorNCR REGIONAL CONTRACTING(30000) | 140P3023C0002 | 237310 | NATIONAL PARK SERVICE (NPS) - NATIONAL CAPITAL AREA (NCA) - GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP): REPAIR TURKEY RUN PARK ROAD AND PARKING LOT PAVEMENT | $9K |
| Apr 21, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000013 | 237310 | PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER PEDESTRIAN/BICYCLE TRAIL ACCESS AND SAFETY IMPROVEMENTS, AND REHABILITATION OF ROCK CREEK AND POTOMAC PARKWAY (ROUTE 16). THE WORK INCLUDES ASPHALT PAVEMENT MILL AND OVER | $304K |
| Apr 6, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000013 | 237310 | PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER PEDESTRIAN/BICYCLE TRAIL ACCESS AND SAFETY IMPROVEMENTS, AND REHABILITATION OF ROCK CREEK AND POTOMAC PARKWAY (ROUTE 16). THE WORK INCLUDES ASPHALT PAVEMENT MILL AND OVER | $151K |
| Mar 29, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000013 | 237310 | PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER PEDESTRIAN/BICYCLE TRAIL ACCESS AND SAFETY IMPROVEMENTS, AND REHABILITATION OF ROCK CREEK AND POTOMAC PARKWAY (ROUTE 16). THE WORK INCLUDES ASPHALT PAVEMENT MILL AND OVER | $277K |
| Mar 13, 2023 | Department of DefenseW2SD ENDIST NORFOLK | W9123622F0057 | 237990 | ANC PATTON DR MILL & PAVE | $40K |
| Dec 20, 2022 | Department of the InteriorNCR REGIONAL CONTRACTING(30000) | 140P3023C0002 | 237310 | NATIONAL PARK SERVICE (NPS) - NATIONAL CAPITAL AREA (NCA) - GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP): REPAIR TURKEY RUN PARK ROAD AND PARKING LOT PAVEMENT | $1.5M |
| Dec 15, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000013 | 237310 | PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER PEDESTRIAN/BICYCLE TRAIL ACCESS AND SAFETY IMPROVEMENTS, AND REHABILITATION OF ROCK CREEK AND POTOMAC PARKWAY (ROUTE 16). THE WORK INCLUDES ASPHALT PAVEMENT MILL AND OVER | $559K |
| Sep 15, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000013 | 237310 | PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER PEDESTRIAN/BICYCLE TRAIL ACCESS AND SAFETY IMPROVEMENTS, AND REHABILITATION OF ROCK CREEK AND POTOMAC PARKWAY (ROUTE 16). THE WORK INCLUDES ASPHALT PAVEMENT MILL AND OVER | $1.8M |
| Sep 9, 2022 | Department of DefenseW2SD ENDIST NORFOLK | W9123622F0057 | 237990 | ANC PATTON DR MILL & PAVE | $587K |
| Aug 30, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000013 | 237310 | PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER PEDESTRIAN/BICYCLE TRAIL ACCESS AND SAFETY IMPROVEMENTS, AND REHABILITATION OF ROCK CREEK AND POTOMAC PARKWAY (ROUTE 16). THE WORK INCLUDES ASPHALT PAVEMENT MILL AND OVER | $131K |
| May 12, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000013 | 237310 | PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER PEDESTRIAN/BICYCLE TRAIL ACCESS AND SAFETY IMPROVEMENTS, AND REHABILITATION OF ROCK CREEK AND POTOMAC PARKWAY (ROUTE 16). THE WORK INCLUDES ASPHALT PAVEMENT MILL AND OVER | $371K |
| Jan 21, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000013 | 237310 | PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER PEDESTRIAN/BICYCLE TRAIL ACCESS AND SAFETY IMPROVEMENTS, AND REHABILITATION OF ROCK CREEK AND POTOMAC PARKWAY (ROUTE 16). THE WORK INCLUDES ASPHALT PAVEMENT MILL AND OVER | $172K |
| Nov 10, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000013 | 237310 | PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER PEDESTRIAN/BICYCLE TRAIL ACCESS AND SAFETY IMPROVEMENTS, AND REHABILITATION OF ROCK CREEK AND POTOMAC PARKWAY (ROUTE 16). THE WORK INCLUDES ASPHALT PAVEMENT MILL AND OVER | $24K |
| Jun 10, 2021 | Department of DefenseW2SD ENDIST NORFOLK | W9123621F0048 | 237990 | MINIMUM GUARANTEE | $10K |
| Mar 10, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000013 | 237310 | PROJECT NP JFK1(2) NAMA16(2) TRL(1): THE PROJECT CONSISTS OF KENNEDY CENTER PEDESTRIAN/BICYCLE TRAIL ACCESS AND SAFETY IMPROVEMENTS, AND REHABILITATION OF ROCK CREEK AND POTOMAC PARKWAY (ROUTE 16). THE WORK INCLUDES ASPHALT PAVEMENT MILL AND OVER | $8.3M |
| Jun 4, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7320C000020 | 237310 | PROJECT NP-GWMP 6(1), 7(2): THE PROJECT CONSISTS OF THE REHABILITATION OF THE CLARA BARTON PARKWAY AND ASSOCIATED PARKING AREAS, ACCESS ROADS, AND RAMPS WITHIN THE GEORGE WASHINGTON MEMORIAL PARKWAY. THE WORK INCLUDES ASPHALT PAVEMENT MILLING AND O | $10M |
| Oct 17, 2017 | Department of the InteriorIBC ACQ SVCS DIRECTORATE (00004) | IND17PX00401 | 238990 | RE-PAVEMENT OF E RAMP IGF::OT::IGF | $28K |
| Sep 24, 2017 | Department of the InteriorIBC ACQ SVCS DIRECTORATE (00004) | IND17PX00401 | 238990 | RE-PAVEMENT OF E RAMP IGF::OT::IGF | $45K |
Get Alerted Before Metro Paving Corp's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.