Federal Contractor Profile
Mowa-barlovento Joint Venture A
Federal contracting record: $340M obligated across 167 awards from 1 agencies, FY 2016–2026.
Company Profile
UEI (Unique Entity Identifier)
C8TLJHGBMJM8
CAGE Code
6TX36
Parent Organization
Mowa-barlovento Joint Venture A
Address
2700 OLD SPANISH TRAIL, GAUTIER, MS, 395536066
First Federal Award
Nov 23, 2015
Most Recent Award
Jan 23, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- $340M
Department of Defense
100.0% of total obligations
Top NAICS Activity
- $309M
236220
COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION
56 awards
- $31M
236210
INDUSTRIAL BUILDING CONSTRUCTION
111 awards
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Nov 10, 2025 | Department of DefenseFA4877 355 CONS PK | 236220 | CONTRACTOR TO FURNISH ALL LABOR, EQUIPMENT, APPLIANCES, AND MATERIALS AND PERFORM ALL OPERATIONS IN CONNECTION WITH THE PROJECT TO PAVE TOW ROAD (IRVINGTON RD TO KOLB RD BRIDGE), AMARG AT DAVIS-MONTHAN AFB | $62K |
| Sep 30, 2025 | Department of DefenseFA8903 772 ESS PK | 236220 | DESIGN BUILD CONSTRUCTION SERVICES FOR REPAIR AIRBORNE WARNING AND CONTROL SYSTEM APRON PHASE II, REPAIR WEST AIR LOGISTICS CENTER MAINTENANCE APRON PHASE II AND REPAIR AIRCRAFT PARKING APRON WEST OF HANGAR 3102 AT TINKER AIR FORCE BASE OKLAHOMA | $3.2M |
| Sep 30, 2025 | Department of DefenseFA8903 772 ESS PK | 236220 | DESIGN-BUILD CONSTRUCTION SERVICES UNDER THE REGIONAL ENGINEERING AND CONSTRUCTION CONTRACT (REC) CENTRAL REGION TO REPAIR TAXIWAY D AT TINKER AFB, OK. | $2.4M |
| Sep 3, 2025 | Department of DefenseFA3016 502 CONS CL | 236220 | REPAIR HVAC B.5450 AND B.5460 | $135K |
| May 21, 2025 | Department of DefenseFA3016 502 CONS CL | 236220 | THIS IS A CONSTRUCTION PROJECT TO RENOVATE B2792 FORT SAM HOUSTON TEXAS IN ACCORDANCE WITH A GOVERNMENT PROVIDED DESIGN, AND TECHNICAL AND REGULATORY REQUIREMENTS. | $2.0M |
| Apr 28, 2025 | Department of DefenseFA8903 772 ESS PK | 236220 | DESIGN BUILD CONSTRUCTION SERVICES FOR REPAIR AIRBORNE WARNING AND CONTROL SYSTEM APRON PHASE II, REPAIR WEST AIR LOGISTICS CENTER MAINTENANCE APRON PHASE II AND REPAIR AIRCRAFT PARKING APRON WEST OF HANGAR 3102 AT TINKER AIR FORCE BASE OKLAHOMA | $1.1M |
| Mar 24, 2025 | Department of DefenseFA4877 355 CONS PK | 236220 | CONTRACTOR TO FURNISH ALL LABOR, EQUIPMENT, APPLIANCES, AND MATERIALS AND PERFORM ALL OPERATIONS IN CONNECTION WITH THE PROJECT TO PAVE TOW ROAD (IRVINGTON RD TO KOLB RD BRIDGE), AMARG AT DAVIS-MONTHAN AFB | $1.2M |
| Mar 14, 2025 | Department of DefenseFA3016 502 CONS CL | 236220 | THIS IS A CONSTRUCTION PROJECT TO RENOVATE B2792 FORT SAM HOUSTON TEXAS IN ACCORDANCE WITH A GOVERNMENT PROVIDED DESIGN, AND TECHNICAL AND REGULATORY REQUIREMENTS. | $43K |
| Feb 28, 2025 | Department of DefenseFA8903 772 ESS PK | 236220 | DESIGN BID BUILD CONSTRUCTION SERVICES TO REPAIR RUNWAY TOUCHDOWNS AND TURNAROUNDS AT CAPE CANAVERAL SFS, FL | $998K |
| Feb 20, 2025 | Department of DefenseFA3030 17 CONS CC | 236220 | REPAIR ROADS VALIANT AND CANBERRA. TOTAL PERIOD OF PERFORMANCE IS 225 CALENDAR DAYS FROM ISSUANCE OF NOTICE TO PROCEED. CLIN 0001: NINETY (90) CALENDAR DAYS. CLIN 0002: NINETY (90) CALENDAR DAYS. CLIN 0003: FORTY-FIVE (45) CALENDAR DAYS. | $37K |
| Jan 23, 2025 | Department of DefenseFA8903 772 ESS PK | 236220 | CONSTRUCTION OF APRON A AT KIRTLAND AFB | $11K |
| Jan 8, 2025 | Department of DefenseFA8903 772 ESS PK | 236220 | DESIGN BUILD CONSTRUCTION SERVICES FOR REPAIR AIRBORNE WARNING AND CONTROL SYSTEM APRON PHASE II, REPAIR WEST AIR LOGISTICS CENTER MAINTENANCE APRON PHASE II AND REPAIR AIRCRAFT PARKING APRON WEST OF HANGAR 3102 AT TINKER AIR FORCE BASE OKLAHOMA | $2.9M |
| Dec 4, 2024 | Department of DefenseFA3016 502 CONS CL | 236220 | REPLACE AIRFIELD LIGHTING (ALSF-1) AND (ALCMS-1) RANDOLPH, TX. | $4K |
| Nov 27, 2024 | Department of DefenseFA3016 502 CONS CL | 236220 | REPAIR OF CONFINEMENT FACILITY - CHAPMAN ANNEX, JBSA TX | $345K |
| Sep 30, 2024 | Department of DefenseFA4600 55 CONS PKP | 236220 | REPAIR ELECTRICAL SUBSTATION B565 AT OFFUTT AFB, NE | $1.9M |
| Sep 30, 2024 | Department of DefenseFA3016 502 CONS CL | 236220 | THIS IS A CONSTRUCTION PROJECT TO RENOVATE B2792 FORT SAM HOUSTON TEXAS IN ACCORDANCE WITH A GOVERNMENT PROVIDED DESIGN, AND TECHNICAL AND REGULATORY REQUIREMENTS. | $2.9M |
| Sep 30, 2024 | Department of DefenseFA8051 772 ESS PKD | 236220 | HOLLOMAN AIR FORCE BASE ADVANCED METER READING SYSTEM (AMRS) | $450K |
| Sep 27, 2024 | Department of DefenseFA4600 55 CONS PKP | 236220 | REPAIR FIRE PROTECTION SYSTEMS AND ALARMS - B517 AT OFFUTT AFB, NE | $1.2M |
| Sep 27, 2024 | Department of DefenseFA4600 55 CONS PKP | 236220 | REPLACE FIRE PROTECTION SYSTEMS - B507 AT OFFUTT AFB, NE | $3.1M |
| Sep 20, 2024 | Department of DefenseFA3016 502 CONS CL | 236220 | THIS IS A CONSTRUCTION PROJECT TO RENOVATE B2792 FORT SAM HOUSTON TEXAS IN ACCORDANCE WITH A GOVERNMENT PROVIDED DESIGN, AND TECHNICAL AND REGULATORY REQUIREMENTS. | $545K |
| Sep 20, 2024 | Department of DefenseFA2521 45 CONS PK | 236220 | PROVIDING THE LABOR, EQUIPMENT AND MATERIALS FOR NEW UNDERGROUND WATER UTILITIES AND INFRASTRUCTURE AMENITIES. | $6.8M |
| Sep 12, 2024 | Department of DefenseFA8051 772 ESS PKD | 236220 | BARKSDALE AFB AMRS PROJECT | $418K |
| Sep 11, 2024 | Department of DefenseFA3030 17 CONS CC | 236220 | REPAIR ROADS VALIANT AND CANBERRA. TOTAL PERIOD OF PERFORMANCE IS 225 CALENDAR DAYS FROM ISSUANCE OF NOTICE TO PROCEED. CLIN 0001: NINETY (90) CALENDAR DAYS. CLIN 0002: NINETY (90) CALENDAR DAYS. CLIN 0003: FORTY-FIVE (45) CALENDAR DAYS. | $986K |
| Sep 8, 2024 | Department of DefenseFA3016 502 CONS CL | 236220 | REPAIR HVAC B.5450 AND B.5460 | $6K |
| Sep 5, 2024 | Department of DefenseFA3016 502 CONS CL | 236220 | RECURRING RUBBER REMOVAL JBSA-WIDE LOCALITIES INCLUDING RANDOLPH AIR FORCE BASE EAST RUNWAY, SEGUIN AUXILIARY FIELD, AND LACKLAND AIR FORCE BASE KELLY FIELD; PERIOD OF PERFORMANCE IS 389 CALENDAR DAYS AFTER ISSUANCE OF NOTICE TO PROCEED. | $972K |
Related Contractors
Other companies active in NAICS 236220 — COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION.
Track Mowa-barlovento Joint Venture A Recompetes Before They Post
Mindy monitors Mowa-barlovento Joint Venture A's active contracts and alerts you 12 months before they expire — so you can position to compete on recompete.
Get Free Recompete Alerts