Federal Contractor Profile
Mowa-barlovento Joint Venture A
$340M obligated·167 awards·1 agencies·2 NAICS
Federal Contracts
Showing contracts 1–50 of 260 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Nov 10, 2025 | Department of DefenseFA4877 355 CONS PK | FA487724F0195 | 236220 | CONTRACTOR TO FURNISH ALL LABOR, EQUIPMENT, APPLIANCES, AND MATERIALS AND PERFORM ALL OPERATIONS IN CONNECTION WITH THE PROJECT TO PAVE TOW ROAD (IRVINGTON RD TO KOLB RD BRIDGE), AMARG AT DAVIS-MONTHAN AFB | $62K |
| Sep 30, 2025 | Department of DefenseFA8903 772 ESS PK | FA890324F0068 | 236220 | DESIGN-BUILD CONSTRUCTION SERVICES UNDER THE REGIONAL ENGINEERING AND CONSTRUCTION CONTRACT (REC) CENTRAL REGION TO REPAIR TAXIWAY D AT TINKER AFB, OK. | $2.4M |
| Sep 30, 2025 | Department of DefenseFA8903 772 ESS PK | FA890319F0153 | 236220 | DESIGN BUILD CONSTRUCTION SERVICES FOR REPAIR AIRBORNE WARNING AND CONTROL SYSTEM APRON PHASE II, REPAIR WEST AIR LOGISTICS CENTER MAINTENANCE APRON PHASE II AND REPAIR AIRCRAFT PARKING APRON WEST OF HANGAR 3102 AT TINKER AIR FORCE BASE OKLAHOMA | $3.2M |
| Sep 3, 2025 | Department of DefenseFA3016 502 CONS CL | FA301622F0401 | 236220 | REPAIR HVAC B.5450 AND B.5460 | $135K |
| May 21, 2025 | Department of DefenseFA3016 502 CONS CL | FA301621F0585 | 236220 | THIS IS A CONSTRUCTION PROJECT TO RENOVATE B2792 FORT SAM HOUSTON TEXAS IN ACCORDANCE WITH A GOVERNMENT PROVIDED DESIGN, AND TECHNICAL AND REGULATORY REQUIREMENTS. | $2.0M |
| Apr 28, 2025 | Department of DefenseFA8903 772 ESS PK | FA890319F0153 | 236220 | DESIGN BUILD CONSTRUCTION SERVICES FOR REPAIR AIRBORNE WARNING AND CONTROL SYSTEM APRON PHASE II, REPAIR WEST AIR LOGISTICS CENTER MAINTENANCE APRON PHASE II AND REPAIR AIRCRAFT PARKING APRON WEST OF HANGAR 3102 AT TINKER AIR FORCE BASE OKLAHOMA | $1.1M |
| Mar 24, 2025 | Department of DefenseFA4877 355 CONS PK | FA487724F0195 | 236220 | CONTRACTOR TO FURNISH ALL LABOR, EQUIPMENT, APPLIANCES, AND MATERIALS AND PERFORM ALL OPERATIONS IN CONNECTION WITH THE PROJECT TO PAVE TOW ROAD (IRVINGTON RD TO KOLB RD BRIDGE), AMARG AT DAVIS-MONTHAN AFB | $1.2M |
| Mar 14, 2025 | Department of DefenseFA3016 502 CONS CL | FA301621F0585 | 236220 | THIS IS A CONSTRUCTION PROJECT TO RENOVATE B2792 FORT SAM HOUSTON TEXAS IN ACCORDANCE WITH A GOVERNMENT PROVIDED DESIGN, AND TECHNICAL AND REGULATORY REQUIREMENTS. | $43K |
| Feb 28, 2025 | Department of DefenseFA8903 772 ESS PK | FA890324F0023 | 236220 | DESIGN BID BUILD CONSTRUCTION SERVICES TO REPAIR RUNWAY TOUCHDOWNS AND TURNAROUNDS AT CAPE CANAVERAL SFS, FL | $998K |
| Feb 20, 2025 | Department of DefenseFA3030 17 CONS CC | FA303024F0043 | 236220 | REPAIR ROADS VALIANT AND CANBERRA. TOTAL PERIOD OF PERFORMANCE IS 225 CALENDAR DAYS FROM ISSUANCE OF NOTICE TO PROCEED. CLIN 0001: NINETY (90) CALENDAR DAYS. CLIN 0002: NINETY (90) CALENDAR DAYS. CLIN 0003: FORTY-FIVE (45) CALENDAR DAYS. | $37K |
| Jan 23, 2025 | Department of DefenseFA8903 772 ESS PK | FA890322F0127 | 236220 | CONSTRUCTION OF APRON A AT KIRTLAND AFB | $11K |
| Jan 8, 2025 | Department of DefenseFA8903 772 ESS PK | FA890319F0153 | 236220 | DESIGN BUILD CONSTRUCTION SERVICES FOR REPAIR AIRBORNE WARNING AND CONTROL SYSTEM APRON PHASE II, REPAIR WEST AIR LOGISTICS CENTER MAINTENANCE APRON PHASE II AND REPAIR AIRCRAFT PARKING APRON WEST OF HANGAR 3102 AT TINKER AIR FORCE BASE OKLAHOMA | $2.9M |
| Dec 4, 2024 | Department of DefenseFA3016 502 CONS CL | FA301623F0358 | 236220 | REPLACE AIRFIELD LIGHTING (ALSF-1) AND (ALCMS-1) RANDOLPH, TX. | $4K |
| Nov 27, 2024 | Department of DefenseFA3016 502 CONS CL | FA301622F0437 | 236220 | REPAIR OF CONFINEMENT FACILITY - CHAPMAN ANNEX, JBSA TX | $345K |
| Sep 30, 2024 | Department of DefenseFA3016 502 CONS CL | FA301621F0585 | 236220 | THIS IS A CONSTRUCTION PROJECT TO RENOVATE B2792 FORT SAM HOUSTON TEXAS IN ACCORDANCE WITH A GOVERNMENT PROVIDED DESIGN, AND TECHNICAL AND REGULATORY REQUIREMENTS. | $2.9M |
| Sep 30, 2024 | Department of DefenseFA8051 772 ESS PKD | FA805123F0026 | 236220 | HOLLOMAN AIR FORCE BASE ADVANCED METER READING SYSTEM (AMRS) | $450K |
| Sep 30, 2024 | Department of DefenseFA4600 55 CONS PKP | FA460023F0073 | 236220 | REPAIR ELECTRICAL SUBSTATION B565 AT OFFUTT AFB, NE | $1.9M |
| Sep 27, 2024 | Department of DefenseFA4600 55 CONS PKP | FA460024F0212 | 236220 | REPLACE FIRE PROTECTION SYSTEMS - B507 AT OFFUTT AFB, NE | $3.1M |
| Sep 27, 2024 | Department of DefenseFA4600 55 CONS PKP | FA460024F0213 | 236220 | REPAIR FIRE PROTECTION SYSTEMS AND ALARMS - B517 AT OFFUTT AFB, NE | $1.2M |
| Sep 20, 2024 | Department of DefenseFA2521 45 CONS PK | FA252124F0413 | 236220 | PROVIDING THE LABOR, EQUIPMENT AND MATERIALS FOR NEW UNDERGROUND WATER UTILITIES AND INFRASTRUCTURE AMENITIES. | $6.8M |
| Sep 20, 2024 | Department of DefenseFA3016 502 CONS CL | FA301621F0585 | 236220 | THIS IS A CONSTRUCTION PROJECT TO RENOVATE B2792 FORT SAM HOUSTON TEXAS IN ACCORDANCE WITH A GOVERNMENT PROVIDED DESIGN, AND TECHNICAL AND REGULATORY REQUIREMENTS. | $545K |
| Sep 12, 2024 | Department of DefenseFA8051 772 ESS PKD | FA805124F0044 | 236220 | BARKSDALE AFB AMRS PROJECT | $418K |
| Sep 11, 2024 | Department of DefenseFA3030 17 CONS CC | FA303024F0043 | 236220 | REPAIR ROADS VALIANT AND CANBERRA. TOTAL PERIOD OF PERFORMANCE IS 225 CALENDAR DAYS FROM ISSUANCE OF NOTICE TO PROCEED. CLIN 0001: NINETY (90) CALENDAR DAYS. CLIN 0002: NINETY (90) CALENDAR DAYS. CLIN 0003: FORTY-FIVE (45) CALENDAR DAYS. | $986K |
| Sep 8, 2024 | Department of DefenseFA3016 502 CONS CL | FA301622F0401 | 236220 | REPAIR HVAC B.5450 AND B.5460 | $6K |
| Sep 5, 2024 | Department of DefenseFA3016 502 CONS CL | FA301624F0315 | 236220 | RECURRING RUBBER REMOVAL JBSA-WIDE LOCALITIES INCLUDING RANDOLPH AIR FORCE BASE EAST RUNWAY, SEGUIN AUXILIARY FIELD, AND LACKLAND AIR FORCE BASE KELLY FIELD; PERIOD OF PERFORMANCE IS 389 CALENDAR DAYS AFTER ISSUANCE OF NOTICE TO PROCEED. | $972K |
| Aug 7, 2024 | Department of DefenseFA8903 772 ESS PK | FA890322F0045 | 236220 | RECONSTRUCT MAIN OPERATION APRON, CANNON AFB, NM. PROJECT #CZQZ1067057 | $34K |
| Jul 30, 2024 | Department of DefenseFA4877 355 CONS PK | FA487724F0195 | 236220 | CONTRACTOR TO FURNISH ALL LABOR, EQUIPMENT, APPLIANCES, AND MATERIALS AND PERFORM ALL OPERATIONS IN CONNECTION WITH THE PROJECT TO PAVE TOW ROAD (IRVINGTON RD TO KOLB RD BRIDGE), AMARG AT DAVIS-MONTHAN AFB | $3.4M |
| Jul 23, 2024 | Department of DefenseFA8051 772 ESS PKD | FA805124F0049 | 236220 | MACDILL AFB FL AMRS PROJECT | $2.7M |
| Jul 5, 2024 | Department of DefenseFA8051 772 ESS PKD | FA805123F0026 | 236220 | HOLLOMAN AIR FORCE BASE ADVANCED METER READING SYSTEM (AMRS) | $28K |
| Jul 1, 2024 | Department of DefenseFA8051 772 ESS PKD | FA805124F0044 | 236220 | BARKSDALE AFB AMRS PROJECT | $2.8M |
| Jun 28, 2024 | Department of DefenseFA8051 772 ESS PKD | FA805124F0045 | 236220 | ARNOLD AFB TN AMRS PROJECT | $3.9M |
| Jun 4, 2024 | Department of DefenseFA8903 772 ESS PK | FA890324F0068 | 236220 | DESIGN-BUILD CONSTRUCTION SERVICES UNDER THE REGIONAL ENGINEERING AND CONSTRUCTION CONTRACT (REC) CENTRAL REGION TO REPAIR TAXIWAY D AT TINKER AFB, OK. | $12M |
| May 16, 2024 | Department of DefenseFA3016 502 CONS CL | FA301622F0401 | 236220 | REPAIR HVAC B.5450 AND B.5460 | $9K |
| May 6, 2024 | Department of DefenseFA8051 772 ESS PKD | FA805122F0058 | 236220 | DYESS AIR FORCE BASE ADVANCED METER READING SYSTEM (AMRS) | $19K |
| Apr 17, 2024 | Department of DefenseFA3016 502 CONS CL | FA301622F0401 | 236220 | REPAIR HVAC B.5450 AND B.5460 | $13K |
| Apr 12, 2024 | Department of DefenseFA8903 772 ESS PK | FA890322F0127 | 236220 | CONSTRUCTION OF APRON A AT KIRTLAND AFB | $232K |
| Apr 12, 2024 | Department of DefenseFA8903 772 ESS PK | FA890322F0127 | 236220 | CONSTRUCTION OF APRON A AT KIRTLAND AFB | $156K |
| Mar 20, 2024 | Department of DefenseFA3016 502 CONS CL | FA301622F0401 | 236220 | REPAIR HVAC B.5450 AND B.5460 | $60K |
| Feb 27, 2024 | Department of DefenseFA8051 772 ESS PKD | FA805121F0043 | 236220 | SHAW AFB ADVANCED METER READING SYSTEM (AMRS) | $154K |
| Feb 14, 2024 | Department of DefenseFA8903 772 ESS PK | FA890322F0127 | 236220 | CONSTRUCTION OF APRON A AT KIRTLAND AFB | $326K |
| Feb 12, 2024 | Department of DefenseFA3016 502 CONS CL | FA301622F0437 | 236220 | REPAIR OF CONFINEMENT FACILITY - CHAPMAN ANNEX, JBSA TX | $256K |
| Feb 2, 2024 | Department of DefenseFA3016 502 CONS CL | FA301622F0401 | 236220 | REPAIR HVAC B.5450 AND B.5460 | $163K |
| Dec 13, 2023 | Department of DefenseFA8903 772 ESS PK | FA890319F0153 | 236220 | DESIGN BUILD CONSTRUCTION SERVICES FOR REPAIR AIRBORNE WARNING AND CONTROL SYSTEM APRON PHASE II, REPAIR WEST AIR LOGISTICS CENTER MAINTENANCE APRON PHASE II AND REPAIR AIRCRAFT PARKING APRON WEST OF HANGAR 3102 AT TINKER AIR FORCE BASE OKLAHOMA | $2.5M |
| Dec 13, 2023 | Department of DefenseFA8903 772 ESS PK | FA890324F0023 | 236220 | DESIGN BID BUILD CONSTRUCTION SERVICES TO REPAIR RUNWAY TOUCHDOWNS AND TURNAROUNDS AT CAPE CANAVERAL SFS, FL | $50M |
| Nov 28, 2023 | Department of DefenseFA8903 772 ESS PK | FA890319F0153 | 236220 | DESIGN BUILD CONSTRUCTION SERVICES FOR REPAIR AIRBORNE WARNING AND CONTROL SYSTEM APRON PHASE II, REPAIR WEST AIR LOGISTICS CENTER MAINTENANCE APRON PHASE II AND REPAIR AIRCRAFT PARKING APRON WEST OF HANGAR 3102 AT TINKER AIR FORCE BASE OKLAHOMA | $2.9M |
| Sep 22, 2023 | Department of DefenseFA8903 772 ESS PK | FA890323F0140 | 236220 | DESIGN AND CONSTRUCTION FOR SECURITY FENCE AROUND MAIN RAMP AT EBBING FIELD, FT SMITH, AR. | $701K |
| Sep 8, 2023 | Department of DefenseFA4686 9 CONS PK | FA468621F0068 | 236220 | TOOL CRIB, PARKING AND FENCE | $47K |
| Sep 5, 2023 | Department of DefenseFA3030 17 CONS CC | FA303023F0081 | 236220 | REPAIR APACHE TRAIL - GOODFELLOW AFB | $738K |
| Aug 4, 2023 | Department of DefenseFA8051 772 ESS PKD | FA805123F0026 | 236220 | HOLLOMAN AIR FORCE BASE ADVANCED METER READING SYSTEM (AMRS) | $3.0M |
| Aug 1, 2023 | Department of DefenseW2V6 USA ENG SPT CTR HUNTSVIL | W912DY18F0952 | 236220 | IGF::OT::IGF CONSTRUCTION BUILDING 970 | $439K |
Get Alerted Before Mowa-barlovento Joint Venture A's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free