Federal Contractor Profile
Nanoracks, LLC
$82M obligated·92 awards·3 agencies·4 NAICS
Federal Contracts
Showing contracts 51–100 of 177 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 11, 2023 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC023FA160 | 541712 | MICROGRAVITY EXPERIMENT TO MEASURE THE SPEED OF SOUND INSIDE SIMULATED ASTEROID REGOLITH IN THE ISS ENVIRONMENT (MESSAR) | $44K |
| Aug 11, 2023 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC023F0031 | 541712 | SOLDER JOINTS BLACK BOX- EPSCOR | $174K |
| Jun 29, 2023 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0237 | 541715 | NANORACKS TO PROVIDE | $753K |
| May 2, 2023 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC023FA160 | 541712 | MICROGRAVITY EXPERIMENT TO MEASURE THE SPEED OF SOUND INSIDE SIMULATED ASTEROID REGOLITH IN THE ISS ENVIRONMENT (MESSAR) | $90K |
| Apr 26, 2023 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0237 | 541715 | NANORACKS TO PROVIDE | $262K |
| Apr 25, 2023 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC023F0030 | 541712 | ADVANCED STARCS TECHNOLOGY FOR RESILIENCE ISS DEMONSTRATION (ASTRID) | $215K |
| Apr 20, 2023 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC023F0037 | 336419 | CUBESAT INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) 3 FEDERAL COMMUNICATIONS COMMISSION (FCC) CONSULTING SERVICES FOR TERRESTRIAL RAYS ANALYSIS AND DETECTION (TRYAD) MISSION. | $17K |
| Apr 13, 2023 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC023FA135 | 541712 | PROVIDES PROJECT-SPECIFIC INTEGRATION AND OPERATIONS SUPPORT TO SUPPORT THE EVALUATION OF BIOFILM RESISTANT COATINGS FOR SPACECRAFT WATER SYSTEMS PROJECT | $94K |
| Apr 5, 2023 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC023FA130 | 541712 | TURBULENCE DECAY OF A BUBBLE OR SEDIMENT LADEN LIQUID IN ISS MICROGRAVITY | $15K |
| Mar 8, 2023 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC023F0031 | 541712 | SOLDER JOINTS BLACK BOX- EPSCOR | $94K |
| Mar 7, 2023 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC023F0038 | 541712 | TO#58 -TURBULENCE DECAY OF A BUBBLE OR SEDIMENT LADEN LIQUID IN ISS MICROGRAVITY | $92K |
| Mar 6, 2023 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0108 | 541712 | TO#52- OPTICA-ONBOARD PROGRAMMABLE TECHNOLOGY FOR IMAGE COMPRESSION AND ANALYSIS) | $127K |
| Feb 28, 2023 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC023F0030 | 541712 | ADVANCED STARCS TECHNOLOGY FOR RESILIENCE ISS DEMONSTRATION (ASTRID) | $263K |
| Feb 24, 2023 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0064 | 336419 | CUBESAT 3 INTEGRATION SUPPORT FOR VENTURE CLASS LAUNCH SERVICES (VCLS) DEMONSTRATION 2. | $17K |
| Feb 17, 2023 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0237 | 541715 | NANORACKS TO PROVIDE | $753K |
| Jan 11, 2023 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0237 | 541715 | NANORACKS TO PROVIDE | $942K |
| Dec 20, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0064 | 336419 | CUBESAT 3 INTEGRATION SUPPORT FOR VENTURE CLASS LAUNCH SERVICES (VCLS) DEMONSTRATION 2. | $10K |
| Nov 22, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0064 | 336419 | CUBESAT 3 INTEGRATION SUPPORT FOR VENTURE CLASS LAUNCH SERVICES (VCLS) DEMONSTRATION 2. | $4K |
| Oct 13, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0237 | 541715 | NANORACKS TO PROVIDE | $753K |
| Oct 12, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0064 | 336419 | CUBESAT 3 INTEGRATION SUPPORT FOR VENTURE CLASS LAUNCH SERVICES (VCLS) DEMONSTRATION 2. | $52K |
| Sep 29, 2022 | Department of DefenseFA8649 USAF SBIR STTR CNTRCTNG AFRL | FA864922P1209 | 541715 | AN INVESTIGATION OF IN-SPACE WELDING TECHNIQUES FOR FEASIBILITY AND OPTIMALITY | $245K |
| Sep 26, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0237 | 541715 | NANORACKS TO PROVIDE | $1.6M |
| Sep 23, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0246 | 541712 | INTEGRATION, TRANSPORT AND DEPLOYMENT OF 1 CUBESAT: AMDROHPSAT (3U) BEING DEPLOYED FROM CYGNUS | $294K |
| Sep 22, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0248 | 541712 | IN-SPACE PRODUCTION OF SEMIMETAL-SEMICONDUCTOR COMPOSITE (SSC) CRYSTALS | $710K |
| Sep 21, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0247 | 541712 | DEPLOYMENT OF TWO CUBESATS | $495K |
| Sep 21, 2022 | National Aeronautics and Space AdministrationNASA HEADQUARTERS | NNH17CL01C | 541712 | IGF::OT::IGF THE GOAL OF THIS RESEARCH IS TO CONDUCT A FEASIBILITY STUDY TO VALIDATE THE RELATIVE EASE AND AFFORDABILITY OF REPURPOSING ROCKET UPPER STAGES TO SERVE AS HABITATS, BEGINNING WITH A DEMONSTRATION OF CONVERTING AND ATTACHING A CENTAUR UPPER STAGE TO THE INTERNATIONAL SPACE STATION (ISS). THIS CONTRACT IS IN SUPPORT OF THE FOLLOWING LIST OF NASA OBJECTIVES FOR THIS PHASE OF THE HABITATION SYSTEM DEVELOPMENT: 1. DEVELOP AND REFINE THE EVOLVABLE, MODULAR ARCHITECTURE, FUNCTIONAL ALLOCATION OPTIONS, STANDARDS, AND COMMON INTERFACES REQUIRED TO ENABLE INTEROPERABILITY OF THE AGGREGATE SYSTEM TO PROVIDE LONG DURATION DEEP SPACE TRANSIT HABITATION. ACHIEVE A LEVEL OF FIDELITY IN TECHNICAL AND PROGRAMMATIC FEASIBILITY CONCEPTS FOR GROUND PROTOFLIGHT VEHICLES-MODULES-UNITS/ 2. FURTHER DEFINE AND DEVELOP DEEP SPACE HABITATION CAPABILITIES THAT CAN BE FLOWN AS CO-MANIFESTED PAYLOADS ON SLS BLOCK 1B WITH AN INITIAL SLS CO-MANIFESTING CAPABILITY OF 4 TO 6 METRIC TONS STARTING IN EARLY-TO-MID 2020S, OR LATER IN THE 2020S ON A CARGO-ONLY VERSION OF SLS, OR ON ALTERNATIVE LAUNCH VEHICLES. NOTE THE HABITATION SYSTEM CONCEPT CAN BE SEPARATED INTO MULTIPLE INTEGRATED MODULES WITH DISTRIBUTED FUNCTIONS. IF THE HABITATION CONCEPT IS NOT FLOWN ON SLS, PROVIDE DETAILS OF THE LAUNCH VEHICLE ASSUMPTIONS. 3. MATURE THE DESIGN OF THE OVERALL DEEP SPACE INTEGRATED SYSTEM(S) AND, AT A MINIMUM, DEVELOP A FULL SIZE, GROUND PROTOTYPE OF THE PORTION OF YOUR DESIGN THAT PROVIDES THE MAJORITY OF THE HABITATION CAPABILITIES FOR FORM, FIT, AND PARTIAL FUNCTION INTEGRATION TESTING. 4. IDENTIFY COMMERCIAL CAPABILITY DEVELOPMENT FOR LEO THAT INTERSECTS NASA LONG DURATION DEEP SPACE HABITATION REQUIREMENTS ALONG WITH ANY POTENTIAL OPTION TO MAXIMIZE THE LEVERAGING OF COMMERCIAL LEO ADVANCEMENTS TOWARDS MEETING NASA LONG DURATION DEEP SPACE HABITATION NEEDS. 5. PROVIDE INFORMATION ON COMPANY END-TO-END DEVELOPMENT EFFORT AND ROM COSTS FOR FLIGHT DEVELOPMENT - COMPANIES TO PROVIDE A PROPOSAL, SOW, AND FULLY PRICED APPENDIX A EFFORTS AND ROM COSTS FOR SUBSEQUENT PHASES FOR ENGINEERING AND FLIGHT UNIT DEVELOPMENT. THIS CONTRACT IS FOR THE LXION TEAM TO COMPLETE BOTH THE PHASE 1 AND PHASE 2 WORK IN A RAPID, EFFICIENT, AND JUDICIOUS MANNER, FINISHING BOTH THE CORE FEASIBILITY AND THE CONCEPT/ARCHITECTURE PHASES OF THE STUDY BEFORE THE END OF CALENDAR YEAR 2017. THIS WILL ALLOW THE LXION TEAM TO QUICKLY MOVE INTO DEVELOPING HARDWARE, INCLUDING OUTFITTING AN ACTUAL CENTAUR IN EARLY 2018, AND BEING READY FOR THE FIRST FLIGHT OF THE LXION HABITAT AS EARLY AS 2020. THE FOCUS OF THE IXION INITIATIVE PROPOSAL IS TO DEVELOP AND DEMONSTRATE THE CAPABILITY TO REPURPOSE PROPELLANT TANKS INTO HABITABLE VOLUMES ON-ORBIT FOR USE IN AN OVERALL IN-SPACE ARCHITECTURE. THE CAPABILITY WILL BE DEMONSTRATED IN TWO PHASES. FIRST IS A CORE FEASIBILITY STUDY AS PHASE 1 AND THEN THE IXION TEAM WILL PLAN A COMPREHENSIVE SYSTEMS CONCEPTS AND ARCHITECTURE STUDY FOR PHASE 2 SHOULD THE FEASIBILITY STUDY MERIT SUCH FURTHER WORK. REPORTS WILL INCLUDE COST-BENEFIT ANALYSES OF REPURPOSING STRATEGIES AND TECHNIQUES THAT ARE MOST ATTRACTIVE. A CON-OPS MEDIA PRESENTATION WILL BE DEVELOPED THROUGHOUT BOTH PHASES 10 ILLUSTRATE THE STRATEGY AND WILL BE ADDED TO AND ENHANCED AS THE PROJECT PROGRESSES. | $909K |
| Aug 29, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC021F0232 | 541715 | NANORACKS TO PROVIDE | $119K |
| Aug 21, 2022 | Department of DefenseFA9453 AFRL RVK | FA945322CA046 | 541715 | STTR I - MODPAK: MODULAR SPACECRAFT WITH VARIABLE PACKOUT CAPABILITY FOR FLEXIBLE ON-ORBIT SERVICING AND REMEDIATION | $241K |
| Aug 17, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0108 | 541712 | TO#52- OPTICA-ONBOARD PROGRAMMABLE TECHNOLOGY FOR IMAGE COMPRESSION AND ANALYSIS) | $127K |
| Jul 28, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC021F0117 | 541712 | TO#48- MICROGRAVITY HEAT AND MASS TRANSFER: EPSCOR | $14K |
| Jun 30, 2022 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 80NSSC22PB453 | 541715 | NRCSD DOUBLEWIDE 6U DEPLOYER FOR FIT CHECKS AND VIBRATION TESTING | $50K |
| Jun 27, 2022 | Department of DefenseFA9453 AFRL RVK | FA945322CA083 | 541715 | INVESTIGATING PASSIVE TECHNIQUES TO MITIGATE LOSS IN FUEL STORAGE IN SPACE ENVIRONMENTS | $247K |
| Jun 22, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0064 | 336419 | CUBESAT 3 INTEGRATION SUPPORT FOR VENTURE CLASS LAUNCH SERVICES (VCLS) DEMONSTRATION 2. | $8K |
| Jun 9, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC021F0232 | 541715 | NANORACKS TO PROVIDE | $1.1M |
| Jun 7, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0108 | 541712 | TO#52- OPTICA-ONBOARD PROGRAMMABLE TECHNOLOGY FOR IMAGE COMPRESSION AND ANALYSIS) | $499 |
| Jun 1, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0150 | 541712 | TO#53- CUBESAT LAUNCH INITIATIVE (CSLI) CUBESATS | $375K |
| May 16, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC020F0035 | 541712 | TO#38- STEM ON STATION | $12K |
| May 12, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0064 | 336419 | CUBESAT 3 INTEGRATION SUPPORT FOR VENTURE CLASS LAUNCH SERVICES (VCLS) DEMONSTRATION 2. | $13K |
| Apr 27, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0108 | 541712 | TO#52- OPTICA-ONBOARD PROGRAMMABLE TECHNOLOGY FOR IMAGE COMPRESSION AND ANALYSIS) | $348K |
| Apr 21, 2022 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 80NSSC22CA087 | 541715 | EO14042 SBIR PHASE II USING AUTONOMOUS OUTPOSTS AS DATA RELAYS TO SUPPORT DISTRIBUTED SPACECRAFT | $744K |
| Mar 29, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0087 | 541712 | TO#51 - NRAL INTERFACE HARDWARE STUDY | $146K |
| Mar 3, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC021F0232 | 541715 | NANORACKS TO PROVIDE | $199K |
| Jan 26, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC021F0232 | 541715 | NANORACKS TO PROVIDE | $541K |
| Jan 20, 2022 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC021F0232 | 541715 | NANORACKS TO PROVIDE | $55K |
| Sep 21, 2021 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC021F0232 | 541715 | NANORACKS TO PROVIDE | $740K |
| Sep 20, 2021 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0064 | 336419 | CUBESAT 3 INTEGRATION SUPPORT FOR VENTURE CLASS LAUNCH SERVICES (VCLS) DEMONSTRATION 2. | $845 |
| Sep 13, 2021 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC021F0300 | 541712 | TO#50 CUBESAT LAUNCH INITIATIVE (CSLI) CUBESAT ELANA | $673K |
| Sep 2, 2021 | National Aeronautics and Space AdministrationNASA HEADQUARTERS | NNH17CL01C | 541712 | IGF::OT::IGF THE GOAL OF THIS RESEARCH IS TO CONDUCT A FEASIBILITY STUDY TO VALIDATE THE RELATIVE EASE AND AFFORDABILITY OF REPURPOSING ROCKET UPPER STAGES TO SERVE AS HABITATS, BEGINNING WITH A DEMONSTRATION OF CONVERTING AND ATTACHING A CENTAUR UPPER STAGE TO THE INTERNATIONAL SPACE STATION (ISS). THIS CONTRACT IS IN SUPPORT OF THE FOLLOWING LIST OF NASA OBJECTIVES FOR THIS PHASE OF THE HABITATION SYSTEM DEVELOPMENT: 1. DEVELOP AND REFINE THE EVOLVABLE, MODULAR ARCHITECTURE, FUNCTIONAL ALLOCATION OPTIONS, STANDARDS, AND COMMON INTERFACES REQUIRED TO ENABLE INTEROPERABILITY OF THE AGGREGATE SYSTEM TO PROVIDE LONG DURATION DEEP SPACE TRANSIT HABITATION. ACHIEVE A LEVEL OF FIDELITY IN TECHNICAL AND PROGRAMMATIC FEASIBILITY CONCEPTS FOR GROUND PROTOFLIGHT VEHICLES-MODULES-UNITS/ 2. FURTHER DEFINE AND DEVELOP DEEP SPACE HABITATION CAPABILITIES THAT CAN BE FLOWN AS CO-MANIFESTED PAYLOADS ON SLS BLOCK 1B WITH AN INITIAL SLS CO-MANIFESTING CAPABILITY OF 4 TO 6 METRIC TONS STARTING IN EARLY-TO-MID 2020S, OR LATER IN THE 2020S ON A CARGO-ONLY VERSION OF SLS, OR ON ALTERNATIVE LAUNCH VEHICLES. NOTE THE HABITATION SYSTEM CONCEPT CAN BE SEPARATED INTO MULTIPLE INTEGRATED MODULES WITH DISTRIBUTED FUNCTIONS. IF THE HABITATION CONCEPT IS NOT FLOWN ON SLS, PROVIDE DETAILS OF THE LAUNCH VEHICLE ASSUMPTIONS. 3. MATURE THE DESIGN OF THE OVERALL DEEP SPACE INTEGRATED SYSTEM(S) AND, AT A MINIMUM, DEVELOP A FULL SIZE, GROUND PROTOTYPE OF THE PORTION OF YOUR DESIGN THAT PROVIDES THE MAJORITY OF THE HABITATION CAPABILITIES FOR FORM, FIT, AND PARTIAL FUNCTION INTEGRATION TESTING. 4. IDENTIFY COMMERCIAL CAPABILITY DEVELOPMENT FOR LEO THAT INTERSECTS NASA LONG DURATION DEEP SPACE HABITATION REQUIREMENTS ALONG WITH ANY POTENTIAL OPTION TO MAXIMIZE THE LEVERAGING OF COMMERCIAL LEO ADVANCEMENTS TOWARDS MEETING NASA LONG DURATION DEEP SPACE HABITATION NEEDS. 5. PROVIDE INFORMATION ON COMPANY END-TO-END DEVELOPMENT EFFORT AND ROM COSTS FOR FLIGHT DEVELOPMENT - COMPANIES TO PROVIDE A PROPOSAL, SOW, AND FULLY PRICED APPENDIX A EFFORTS AND ROM COSTS FOR SUBSEQUENT PHASES FOR ENGINEERING AND FLIGHT UNIT DEVELOPMENT. THIS CONTRACT IS FOR THE LXION TEAM TO COMPLETE BOTH THE PHASE 1 AND PHASE 2 WORK IN A RAPID, EFFICIENT, AND JUDICIOUS MANNER, FINISHING BOTH THE CORE FEASIBILITY AND THE CONCEPT/ARCHITECTURE PHASES OF THE STUDY BEFORE THE END OF CALENDAR YEAR 2017. THIS WILL ALLOW THE LXION TEAM TO QUICKLY MOVE INTO DEVELOPING HARDWARE, INCLUDING OUTFITTING AN ACTUAL CENTAUR IN EARLY 2018, AND BEING READY FOR THE FIRST FLIGHT OF THE LXION HABITAT AS EARLY AS 2020. THE FOCUS OF THE IXION INITIATIVE PROPOSAL IS TO DEVELOP AND DEMONSTRATE THE CAPABILITY TO REPURPOSE PROPELLANT TANKS INTO HABITABLE VOLUMES ON-ORBIT FOR USE IN AN OVERALL IN-SPACE ARCHITECTURE. THE CAPABILITY WILL BE DEMONSTRATED IN TWO PHASES. FIRST IS A CORE FEASIBILITY STUDY AS PHASE 1 AND THEN THE IXION TEAM WILL PLAN A COMPREHENSIVE SYSTEMS CONCEPTS AND ARCHITECTURE STUDY FOR PHASE 2 SHOULD THE FEASIBILITY STUDY MERIT SUCH FURTHER WORK. REPORTS WILL INCLUDE COST-BENEFIT ANALYSES OF REPURPOSING STRATEGIES AND TECHNIQUES THAT ARE MOST ATTRACTIVE. A CON-OPS MEDIA PRESENTATION WILL BE DEVELOPED THROUGHOUT BOTH PHASES 10 ILLUSTRATE THE STRATEGY AND WILL BE ADDED TO AND ENHANCED AS THE PROJECT PROGRESSES. | $99K |
| Aug 16, 2021 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC017F0130 | 541712 | IGF::OT::IGF INTEGRATION, TRANSPORT AND DEPLOYMENT OF TWO 6U, FIVE 3U, AND FOUR 1U CUBESATS DEPLOYED FROM THE ISS. | $9K |
| Aug 5, 2021 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC021F0232 | 541715 | NANORACKS TO PROVIDE | $493K |
Get Alerted Before Nanoracks, LLC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free