Home/Contractors/Nanoracks, LLC/contracts

Federal Contractor Profile

Nanoracks, LLC

$82M obligated·92 awards·3 agencies·4 NAICS

Federal Contracts

Showing contracts 101150 of 177 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Jul 28, 2021National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021F0117541712TO#48- MICROGRAVITY HEAT AND MASS TRANSFER: EPSCOR$35K
Jul 23, 2021National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021F0265541712TO49- CUBESAT LAUNCH INITIATIVE (CSLI) CUBESATS ELANA$1.2M
Jun 17, 2021National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021F0232541715NANORACKS TO PROVIDE$1.0M
May 13, 2021National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC21C0310541715USING AUTONOMOUS OUTPOSTS AS DATA RELAYS TO SUPPORT DISTRIBUTED SPACECRAFT$83K
Mar 16, 2021National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER80KSC021F0064336419CUBESAT 3 INTEGRATION SUPPORT FOR VENTURE CLASS LAUNCH SERVICES (VCLS) DEMONSTRATION 2.$636K
Mar 4, 2021National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021F0117541712TO#48- MICROGRAVITY HEAT AND MASS TRANSFER: EPSCOR$92K
Feb 24, 2021National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0276541712CUBESAT LAUNCH INITIATIVE (CSLI)CUBESATS-ELANA-37$390K
Feb 10, 2021National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0265541712TO#42- TRASH DEPLOYMENT PHASE II$409K
Feb 1, 2021National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC018F0163541712FIRST 6 AIRLOCK CYCLES$1.2M
Jan 28, 2021National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0276541712CUBESAT LAUNCH INITIATIVE (CSLI)CUBESATS-ELANA-37$35K
Nov 25, 2020National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021F0054541712TO47 CUBESAT LAUNCH INITIATIVE CSLI CUBESATS ELANA$1.1M
Nov 24, 2020National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC018F0163541712FIRST 6 AIRLOCK CYCLES$760K
Nov 18, 2020National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021F0049541712TO#46- ISS 360 LIVESTREAM$64K
Nov 18, 2020National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0265541712TO#42- TRASH DEPLOYMENT PHASE II$236K
Nov 13, 2020National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC021F0030541712TO#45- EXPERIMENTAL PROGRAM TO STIMULATE COMPETITIVE RESEARCH (EPSCOR)$22K
Oct 14, 2020National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0189541712TO#41- ARKSAT 2$69K
Jul 22, 2020National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0276541712CUBESAT LAUNCH INITIATIVE (CSLI)CUBESATS-ELANA-37$2.3M
Jul 15, 2020National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0265541712TO#42- TRASH DEPLOYMENT PHASE II$866K
Jul 6, 2020National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC018F0163541712FIRST 6 AIRLOCK CYCLES$88K
Jun 23, 2020National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0222541712TO#43- HYTI TIMER$10K
May 13, 2020National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0189541712TO#41- ARKSAT 2$171K
Apr 23, 2020National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0180541712TO#40- SPX22 CUBESAT LAUNCH INITIATIVE (CSLI) CUBESATS$512K
Feb 11, 2020National Aeronautics and Space AdministrationNASA HEADQUARTERSNNH17CL01C541712IGF::OT::IGF THE GOAL OF THIS RESEARCH IS TO CONDUCT A FEASIBILITY STUDY TO VALIDATE THE RELATIVE EASE AND AFFORDABILITY OF REPURPOSING ROCKET UPPER STAGES TO SERVE AS HABITATS, BEGINNING WITH A DEMONSTRATION OF CONVERTING AND ATTACHING A CENTAUR UPPER STAGE TO THE INTERNATIONAL SPACE STATION (ISS). THIS CONTRACT IS IN SUPPORT OF THE FOLLOWING LIST OF NASA OBJECTIVES FOR THIS PHASE OF THE HABITATION SYSTEM DEVELOPMENT: 1. DEVELOP AND REFINE THE EVOLVABLE, MODULAR ARCHITECTURE, FUNCTIONAL ALLOCATION OPTIONS, STANDARDS, AND COMMON INTERFACES REQUIRED TO ENABLE INTEROPERABILITY OF THE AGGREGATE SYSTEM TO PROVIDE LONG DURATION DEEP SPACE TRANSIT HABITATION. ACHIEVE A LEVEL OF FIDELITY IN TECHNICAL AND PROGRAMMATIC FEASIBILITY CONCEPTS FOR GROUND PROTOFLIGHT VEHICLES-MODULES-UNITS/ 2. FURTHER DEFINE AND DEVELOP DEEP SPACE HABITATION CAPABILITIES THAT CAN BE FLOWN AS CO-MANIFESTED PAYLOADS ON SLS BLOCK 1B WITH AN INITIAL SLS CO-MANIFESTING CAPABILITY OF 4 TO 6 METRIC TONS STARTING IN EARLY-TO-MID 2020S, OR LATER IN THE 2020S ON A CARGO-ONLY VERSION OF SLS, OR ON ALTERNATIVE LAUNCH VEHICLES. NOTE THE HABITATION SYSTEM CONCEPT CAN BE SEPARATED INTO MULTIPLE INTEGRATED MODULES WITH DISTRIBUTED FUNCTIONS. IF THE HABITATION CONCEPT IS NOT FLOWN ON SLS, PROVIDE DETAILS OF THE LAUNCH VEHICLE ASSUMPTIONS. 3. MATURE THE DESIGN OF THE OVERALL DEEP SPACE INTEGRATED SYSTEM(S) AND, AT A MINIMUM, DEVELOP A FULL SIZE, GROUND PROTOTYPE OF THE PORTION OF YOUR DESIGN THAT PROVIDES THE MAJORITY OF THE HABITATION CAPABILITIES FOR FORM, FIT, AND PARTIAL FUNCTION INTEGRATION TESTING. 4. IDENTIFY COMMERCIAL CAPABILITY DEVELOPMENT FOR LEO THAT INTERSECTS NASA LONG DURATION DEEP SPACE HABITATION REQUIREMENTS ALONG WITH ANY POTENTIAL OPTION TO MAXIMIZE THE LEVERAGING OF COMMERCIAL LEO ADVANCEMENTS TOWARDS MEETING NASA LONG DURATION DEEP SPACE HABITATION NEEDS. 5. PROVIDE INFORMATION ON COMPANY END-TO-END DEVELOPMENT EFFORT AND ROM COSTS FOR FLIGHT DEVELOPMENT - COMPANIES TO PROVIDE A PROPOSAL, SOW, AND FULLY PRICED APPENDIX A EFFORTS AND ROM COSTS FOR SUBSEQUENT PHASES FOR ENGINEERING AND FLIGHT UNIT DEVELOPMENT. THIS CONTRACT IS FOR THE LXION TEAM TO COMPLETE BOTH THE PHASE 1 AND PHASE 2 WORK IN A RAPID, EFFICIENT, AND JUDICIOUS MANNER, FINISHING BOTH THE CORE FEASIBILITY AND THE CONCEPT/ARCHITECTURE PHASES OF THE STUDY BEFORE THE END OF CALENDAR YEAR 2017. THIS WILL ALLOW THE LXION TEAM TO QUICKLY MOVE INTO DEVELOPING HARDWARE, INCLUDING OUTFITTING AN ACTUAL CENTAUR IN EARLY 2018, AND BEING READY FOR THE FIRST FLIGHT OF THE LXION HABITAT AS EARLY AS 2020. THE FOCUS OF THE IXION INITIATIVE PROPOSAL IS TO DEVELOP AND DEMONSTRATE THE CAPABILITY TO REPURPOSE PROPELLANT TANKS INTO HABITABLE VOLUMES ON-ORBIT FOR USE IN AN OVERALL IN-SPACE ARCHITECTURE. THE CAPABILITY WILL BE DEMONSTRATED IN TWO PHASES. FIRST IS A CORE FEASIBILITY STUDY AS PHASE 1 AND THEN THE IXION TEAM WILL PLAN A COMPREHENSIVE SYSTEMS CONCEPTS AND ARCHITECTURE STUDY FOR PHASE 2 SHOULD THE FEASIBILITY STUDY MERIT SUCH FURTHER WORK. REPORTS WILL INCLUDE COST-BENEFIT ANALYSES OF REPURPOSING STRATEGIES AND TECHNIQUES THAT ARE MOST ATTRACTIVE. A CON-OPS MEDIA PRESENTATION WILL BE DEVELOPED THROUGHOUT BOTH PHASES 10 ILLUSTRATE THE STRATEGY AND WILL BE ADDED TO AND ENHANCED AS THE PROJECT PROGRESSES.$3.7M
Feb 3, 2020National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0083541712COMMONWEALTH SCIENTIFIC AND INDUSTRIAL RESEARCH ORGANIZATION (CSIRO)$111K
Dec 18, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC019F0246541712TO#36 - OCTOBER 2020 CUBESAT LAUNCH INITIATIVE (CSLI) CUBESATS$673K
Nov 20, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC019F0248541712TO#37- IT- SPINS$6K
Nov 8, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0035541712TO#38- STEM ON STATION$396K
Nov 5, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC019F0246541712TO#36 - OCTOBER 2020 CUBESAT LAUNCH INITIATIVE (CSLI) CUBESATS$478K
Oct 10, 2019National Aeronautics and Space AdministrationNASA HEADQUARTERSNNH17CL01C541712IGF::OT::IGF THE GOAL OF THIS RESEARCH IS TO CONDUCT A FEASIBILITY STUDY TO VALIDATE THE RELATIVE EASE AND AFFORDABILITY OF REPURPOSING ROCKET UPPER STAGES TO SERVE AS HABITATS, BEGINNING WITH A DEMONSTRATION OF CONVERTING AND ATTACHING A CENTAUR UPPER STAGE TO THE INTERNATIONAL SPACE STATION (ISS). THIS CONTRACT IS IN SUPPORT OF THE FOLLOWING LIST OF NASA OBJECTIVES FOR THIS PHASE OF THE HABITATION SYSTEM DEVELOPMENT: 1. DEVELOP AND REFINE THE EVOLVABLE, MODULAR ARCHITECTURE, FUNCTIONAL ALLOCATION OPTIONS, STANDARDS, AND COMMON INTERFACES REQUIRED TO ENABLE INTEROPERABILITY OF THE AGGREGATE SYSTEM TO PROVIDE LONG DURATION DEEP SPACE TRANSIT HABITATION. ACHIEVE A LEVEL OF FIDELITY IN TECHNICAL AND PROGRAMMATIC FEASIBILITY CONCEPTS FOR GROUND PROTOFLIGHT VEHICLES-MODULES-UNITS/ 2. FURTHER DEFINE AND DEVELOP DEEP SPACE HABITATION CAPABILITIES THAT CAN BE FLOWN AS CO-MANIFESTED PAYLOADS ON SLS BLOCK 1B WITH AN INITIAL SLS CO-MANIFESTING CAPABILITY OF 4 TO 6 METRIC TONS STARTING IN EARLY-TO-MID 2020S, OR LATER IN THE 2020S ON A CARGO-ONLY VERSION OF SLS, OR ON ALTERNATIVE LAUNCH VEHICLES. NOTE THE HABITATION SYSTEM CONCEPT CAN BE SEPARATED INTO MULTIPLE INTEGRATED MODULES WITH DISTRIBUTED FUNCTIONS. IF THE HABITATION CONCEPT IS NOT FLOWN ON SLS, PROVIDE DETAILS OF THE LAUNCH VEHICLE ASSUMPTIONS. 3. MATURE THE DESIGN OF THE OVERALL DEEP SPACE INTEGRATED SYSTEM(S) AND, AT A MINIMUM, DEVELOP A FULL SIZE, GROUND PROTOTYPE OF THE PORTION OF YOUR DESIGN THAT PROVIDES THE MAJORITY OF THE HABITATION CAPABILITIES FOR FORM, FIT, AND PARTIAL FUNCTION INTEGRATION TESTING. 4. IDENTIFY COMMERCIAL CAPABILITY DEVELOPMENT FOR LEO THAT INTERSECTS NASA LONG DURATION DEEP SPACE HABITATION REQUIREMENTS ALONG WITH ANY POTENTIAL OPTION TO MAXIMIZE THE LEVERAGING OF COMMERCIAL LEO ADVANCEMENTS TOWARDS MEETING NASA LONG DURATION DEEP SPACE HABITATION NEEDS. 5. PROVIDE INFORMATION ON COMPANY END-TO-END DEVELOPMENT EFFORT AND ROM COSTS FOR FLIGHT DEVELOPMENT - COMPANIES TO PROVIDE A PROPOSAL, SOW, AND FULLY PRICED APPENDIX A EFFORTS AND ROM COSTS FOR SUBSEQUENT PHASES FOR ENGINEERING AND FLIGHT UNIT DEVELOPMENT. THIS CONTRACT IS FOR THE LXION TEAM TO COMPLETE BOTH THE PHASE 1 AND PHASE 2 WORK IN A RAPID, EFFICIENT, AND JUDICIOUS MANNER, FINISHING BOTH THE CORE FEASIBILITY AND THE CONCEPT/ARCHITECTURE PHASES OF THE STUDY BEFORE THE END OF CALENDAR YEAR 2017. THIS WILL ALLOW THE LXION TEAM TO QUICKLY MOVE INTO DEVELOPING HARDWARE, INCLUDING OUTFITTING AN ACTUAL CENTAUR IN EARLY 2018, AND BEING READY FOR THE FIRST FLIGHT OF THE LXION HABITAT AS EARLY AS 2020. THE FOCUS OF THE IXION INITIATIVE PROPOSAL IS TO DEVELOP AND DEMONSTRATE THE CAPABILITY TO REPURPOSE PROPELLANT TANKS INTO HABITABLE VOLUMES ON-ORBIT FOR USE IN AN OVERALL IN-SPACE ARCHITECTURE. THE CAPABILITY WILL BE DEMONSTRATED IN TWO PHASES. FIRST IS A CORE FEASIBILITY STUDY AS PHASE 1 AND THEN THE IXION TEAM WILL PLAN A COMPREHENSIVE SYSTEMS CONCEPTS AND ARCHITECTURE STUDY FOR PHASE 2 SHOULD THE FEASIBILITY STUDY MERIT SUCH FURTHER WORK. REPORTS WILL INCLUDE COST-BENEFIT ANALYSES OF REPURPOSING STRATEGIES AND TECHNIQUES THAT ARE MOST ATTRACTIVE. A CON-OPS MEDIA PRESENTATION WILL BE DEVELOPED THROUGHOUT BOTH PHASES 10 ILLUSTRATE THE STRATEGY AND WILL BE ADDED TO AND ENHANCED AS THE PROJECT PROGRESSES.$4.0M
Aug 16, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC019F0248541712TO#37- IT- SPINS$285K
Aug 15, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC019F0246541712TO#36 - OCTOBER 2020 CUBESAT LAUNCH INITIATIVE (CSLI) CUBESATS$1.1M
Aug 13, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC017F0130541712IGF::OT::IGF INTEGRATION, TRANSPORT AND DEPLOYMENT OF TWO 6U, FIVE 3U, AND FOUR 1U CUBESATS DEPLOYED FROM THE ISS.$9K
Jul 26, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC019F0215541712TO#35 - BISHOP TRASH DEPLOYER$177K
Jul 9, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC019F0201541712NRO AEROCUBE DEPOLOYMENT$825K
Jun 5, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC018F0296541712NNJ13GA08C NANORACKS TO #30_EDUCATIONAL LAUNCH OF NANOSATELLITES (ELANA)-MISSION 25$4K
Jun 5, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC019F0072541712NANORACKS (NNJ13GA08C) TO#32 HUSKYSAT-1. THIS TO PROVIDES INTEGRATION, TRANSPORT AND DEPLOYMENT OF A 3U CUBESAT, HUSKYSAT-1, SPONSORED BY THE CUBESAT LAUNCH INITIATIVE (CSLI).$8K
Jun 4, 2019National Aeronautics and Space AdministrationNASA HEADQUARTERSNNH17CL01C541712IGF::OT::IGF THE GOAL OF THIS RESEARCH IS TO CONDUCT A FEASIBILITY STUDY TO VALIDATE THE RELATIVE EASE AND AFFORDABILITY OF REPURPOSING ROCKET UPPER STAGES TO SERVE AS HABITATS, BEGINNING WITH A DEMONSTRATION OF CONVERTING AND ATTACHING A CENTAUR UPPER STAGE TO THE INTERNATIONAL SPACE STATION (ISS). THIS CONTRACT IS IN SUPPORT OF THE FOLLOWING LIST OF NASA OBJECTIVES FOR THIS PHASE OF THE HABITATION SYSTEM DEVELOPMENT: 1. DEVELOP AND REFINE THE EVOLVABLE, MODULAR ARCHITECTURE, FUNCTIONAL ALLOCATION OPTIONS, STANDARDS, AND COMMON INTERFACES REQUIRED TO ENABLE INTEROPERABILITY OF THE AGGREGATE SYSTEM TO PROVIDE LONG DURATION DEEP SPACE TRANSIT HABITATION. ACHIEVE A LEVEL OF FIDELITY IN TECHNICAL AND PROGRAMMATIC FEASIBILITY CONCEPTS FOR GROUND PROTOFLIGHT VEHICLES-MODULES-UNITS/ 2. FURTHER DEFINE AND DEVELOP DEEP SPACE HABITATION CAPABILITIES THAT CAN BE FLOWN AS CO-MANIFESTED PAYLOADS ON SLS BLOCK 1B WITH AN INITIAL SLS CO-MANIFESTING CAPABILITY OF 4 TO 6 METRIC TONS STARTING IN EARLY-TO-MID 2020S, OR LATER IN THE 2020S ON A CARGO-ONLY VERSION OF SLS, OR ON ALTERNATIVE LAUNCH VEHICLES. NOTE THE HABITATION SYSTEM CONCEPT CAN BE SEPARATED INTO MULTIPLE INTEGRATED MODULES WITH DISTRIBUTED FUNCTIONS. IF THE HABITATION CONCEPT IS NOT FLOWN ON SLS, PROVIDE DETAILS OF THE LAUNCH VEHICLE ASSUMPTIONS. 3. MATURE THE DESIGN OF THE OVERALL DEEP SPACE INTEGRATED SYSTEM(S) AND, AT A MINIMUM, DEVELOP A FULL SIZE, GROUND PROTOTYPE OF THE PORTION OF YOUR DESIGN THAT PROVIDES THE MAJORITY OF THE HABITATION CAPABILITIES FOR FORM, FIT, AND PARTIAL FUNCTION INTEGRATION TESTING. 4. IDENTIFY COMMERCIAL CAPABILITY DEVELOPMENT FOR LEO THAT INTERSECTS NASA LONG DURATION DEEP SPACE HABITATION REQUIREMENTS ALONG WITH ANY POTENTIAL OPTION TO MAXIMIZE THE LEVERAGING OF COMMERCIAL LEO ADVANCEMENTS TOWARDS MEETING NASA LONG DURATION DEEP SPACE HABITATION NEEDS. 5. PROVIDE INFORMATION ON COMPANY END-TO-END DEVELOPMENT EFFORT AND ROM COSTS FOR FLIGHT DEVELOPMENT - COMPANIES TO PROVIDE A PROPOSAL, SOW, AND FULLY PRICED APPENDIX A EFFORTS AND ROM COSTS FOR SUBSEQUENT PHASES FOR ENGINEERING AND FLIGHT UNIT DEVELOPMENT. THIS CONTRACT IS FOR THE LXION TEAM TO COMPLETE BOTH THE PHASE 1 AND PHASE 2 WORK IN A RAPID, EFFICIENT, AND JUDICIOUS MANNER, FINISHING BOTH THE CORE FEASIBILITY AND THE CONCEPT/ARCHITECTURE PHASES OF THE STUDY BEFORE THE END OF CALENDAR YEAR 2017. THIS WILL ALLOW THE LXION TEAM TO QUICKLY MOVE INTO DEVELOPING HARDWARE, INCLUDING OUTFITTING AN ACTUAL CENTAUR IN EARLY 2018, AND BEING READY FOR THE FIRST FLIGHT OF THE LXION HABITAT AS EARLY AS 2020. THE FOCUS OF THE IXION INITIATIVE PROPOSAL IS TO DEVELOP AND DEMONSTRATE THE CAPABILITY TO REPURPOSE PROPELLANT TANKS INTO HABITABLE VOLUMES ON-ORBIT FOR USE IN AN OVERALL IN-SPACE ARCHITECTURE. THE CAPABILITY WILL BE DEMONSTRATED IN TWO PHASES. FIRST IS A CORE FEASIBILITY STUDY AS PHASE 1 AND THEN THE IXION TEAM WILL PLAN A COMPREHENSIVE SYSTEMS CONCEPTS AND ARCHITECTURE STUDY FOR PHASE 2 SHOULD THE FEASIBILITY STUDY MERIT SUCH FURTHER WORK. REPORTS WILL INCLUDE COST-BENEFIT ANALYSES OF REPURPOSING STRATEGIES AND TECHNIQUES THAT ARE MOST ATTRACTIVE. A CON-OPS MEDIA PRESENTATION WILL BE DEVELOPED THROUGHOUT BOTH PHASES 10 ILLUSTRATE THE STRATEGY AND WILL BE ADDED TO AND ENHANCED AS THE PROJECT PROGRESSES.$1000K
May 15, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC019F0149541712PROVIDE INTEGRATION, TRANSPORT AND DEPLOYMENT OF TWO (2) 3U CUBESATS, AEROCUBE-14 (A/B), SPONSORED BY SPONSORED BY THE US GOVERNMENT (USG) OFFICE OF SPACE LAUNCH (OSL).$542K
Mar 28, 2019Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001119F0068541715DEFORMABLE MIRROR DEMONSTRATION SPACECRAFT (DEMI) LAUNCH SERVICES$400K
Mar 8, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC019F0072541712NANORACKS (NNJ13GA08C) TO#32 HUSKYSAT-1. THIS TO PROVIDES INTEGRATION, TRANSPORT AND DEPLOYMENT OF A 3U CUBESAT, HUSKYSAT-1, SPONSORED BY THE CUBESAT LAUNCH INITIATIVE (CSLI).$19K
Feb 22, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC018F0163541712FIRST 6 AIRLOCK CYCLES$1.1M
Feb 21, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC018F0296541712NNJ13GA08C NANORACKS TO #30_EDUCATIONAL LAUNCH OF NANOSATELLITES (ELANA)-MISSION 25$405K
Feb 20, 2019National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC019F0072541712NANORACKS (NNJ13GA08C) TO#32 HUSKYSAT-1. THIS TO PROVIDES INTEGRATION, TRANSPORT AND DEPLOYMENT OF A 3U CUBESAT, HUSKYSAT-1, SPONSORED BY THE CUBESAT LAUNCH INITIATIVE (CSLI).$38K
Nov 6, 2018National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC019F0022541712NANORACKS CONCIERGE SERVICES$9K
Sep 14, 2018National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC018F0296541712NNJ13GA08C NANORACKS TO #30_EDUCATIONAL LAUNCH OF NANOSATELLITES (ELANA)-MISSION 25$513K
Aug 17, 2018National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC018C0024541715STUDY FOR COMMERCIALIZATION OF LOW EARTH ORBIT$987K
Jun 7, 2018National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC018F0175541712SEEKER TO/NANORACKS CONTRACT$367K
Jun 5, 2018National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC017F0130541712IGF::OT::IGF INTEGRATION, TRANSPORT AND DEPLOYMENT OF TWO 6U, FIVE 3U, AND FOUR 1U CUBESATS DEPLOYED FROM THE ISS.$12K
May 24, 2018National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC018F0163541712FIRST 6 AIRLOCK CYCLES$2.5M
Apr 18, 2018National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC017F0126541712IGF::OT::IGF INTEGRATION, TRANSPORT AND DEPLOYMENT OF TWO MICROSATELLITES FROM THE ISS$702K

Get Alerted Before Nanoracks, LLC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free