Federal Contractor Profile
Nelson Engineering CO.
$55.7M obligated·147 awards·9 agencies·4 NAICS
Federal Contracts
Showing contracts 51–100 of 178 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 16, 2023 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC023F0095 | 541330 | ATF HV ARC FLASH | $286K |
| Aug 2, 2023 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC022F0011 | 541330 | A/E SERVICES - ISP STEAM PIPE FLEXIBILITY ANALYSIS PHASE II | $54K |
| Jul 26, 2023 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC022F0180 | 541330 | LV ARC FLASH ANALYSIS PHASE 1 | $476K |
| Jul 25, 2023 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC023FA140 | 541330 | STUDY OF UPGRADE OPERATIONS AND CHECKOUT BUILDING SOUTH WING MECHANICAL SYSTEMS | $173K |
| Jul 21, 2023 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC022FA019 | 541330 | ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF THE CONSTRUCTION OF SAFETY AND RELIABILITY UPGRADE, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 4A, PROJECT CONTROL NUMBER (PCN) 98966.4A. | $28K |
| Jul 20, 2023 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC023FA142 | 541330 | FIRE PROTECTION DESIGN ANALYSIS VEHICLE ASSEMBLY BUILDING UNINTERRUPTIBLE POWER SUPPLY SYSTEM | $14K |
| Jul 14, 2023 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0154 | 541330 | DESIGN INTERIOR RENOVATIONS AT THE BOOSTER FABRICATION FACILITY (BFF) COMPLEX | $28K |
| Jul 10, 2023 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0154 | 541330 | DESIGN INTERIOR RENOVATIONS AT THE BOOSTER FABRICATION FACILITY (BFF) COMPLEX | $327K |
| Jul 7, 2023 | Department of CommerceDEPT OF COMMERCE NIST | 1333ND23FNB190152 | 541620 | A/E DESIGN | $106K |
| Jul 6, 2023 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC023F0070 | 541330 | FY24 HQ TIERED MAINTENANCE EACA | $1.3M |
| May 26, 2023 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99023F00003 | 541620 | C100747 DATA-DRIVEN FACILITY MANAGEMENT SERVICES. COR: KYLASH RAMESH CO: MARIO HENRIQUEZ POP: 06/01/2023 - 05/31/2024 | $1.7M |
| May 11, 2023 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99023F00002 | 541620 | C104631 FACILITY ASSESSMENT SERVICES. COR: NGA NGUYEN CO: MARIO HENRIQUEZ POP: 05/15/2023 - 05/14/2024 | $182K |
| May 7, 2023 | Department of the InteriorWASHINGTON CONTRACTING OFFICE | 140P2122F0184 | 541620 | GRSM001 & GRSM002 CONDITON ASSESSMENT | $7K |
| Mar 30, 2023 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC23FA022 | 541330 | TASK ORDER FOR MARSHALL SPACE FLIGHT CENTER RELIABILITY CENTER MAINTENANCE ENGINEERING PHASE II UNDER THE SOUTH EASTERN REGIONAL A AND E CONTRACT. | $1.1M |
| Mar 9, 2023 | Department of the InteriorWASHINGTON CONTRACTING OFFICE | 140P2122F0001 | 541620 | GLCA007 CONDITION ASSESSMENT | $6K |
| Feb 28, 2023 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC023FA114 | 541330 | ARCHITECT AND ENGINEERING TASK ORDER FOR ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF M6-0794 REPLACE OBSOLETE FIRE ALARM CONTROL PANEL (FACP) AND SMOKE DUCT AND HEAT DETECTORS. PROJECT CONTROL NUMBER 99403. | $19K |
| Feb 28, 2023 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC023FA113 | 541330 | ARCHITECTURE AND ENGINEERING TASK ORDER - ENGINEERING SERVICES DURING CONSTRUCTION OF M7-0351 REPLACE FIRE ALARM CONTROL PANEL AND SMOKE DUCT BEAM AND HEAT DETECTORS, PROJECT CONTROL NUMBER 99541 | $15K |
| Feb 6, 2023 | Department of CommerceDEPT OF COMMERCE NIST | 1333ND23FNB190041 | 541620 | A/E DESIGN | $454K |
| Jan 12, 2023 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0176 | 541330 | ENGINEERING SERVICES DURING THE CONSTRUCTION OF BOOSTER FABRICATION FACILITY (BFF) SWITCHGEAR REPLACEMENT - SUBSTATIONS 1114, 1115, AND 1116 | $3K |
| Dec 15, 2022 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC023F0017 | 541330 | OSI TIERED MAINTENANCE POLICY | $150K |
| Dec 15, 2022 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC023F0016 | 541330 | OSI ASSET CRITICALITY ASSESSMENT | $1.7M |
| Dec 14, 2022 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99023F00001 | 541620 | PERFORM CONDITION AND SUSTAINABILITY ASSESSMENT FOR BUILDINGS IN THE FACILITY ASSESSMENT CYCLE, MULTIPLE NIH CAMPUSES | $1.3M |
| Dec 7, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0154 | 541330 | DESIGN INTERIOR RENOVATIONS AT THE BOOSTER FABRICATION FACILITY (BFF) COMPLEX | $84K |
| Dec 2, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC023FA023 | 541330 | ARCHITECTURE AND ENGINEERING (A&E) TASK ORDER (TO) ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF SPACE STATION PROCESSING FACILITY FIRE ALARM UPGRADES AUDIBILITY AND VISIBILITY. | $11K |
| Nov 21, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC023FA015 | 541330 | ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE OXYGEN DEFICIENCY MONITORING SYSTEM (ODMS) AT THE BOOSTER FABRICATION FACILITY (BFF). | $4K |
| Nov 21, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC023FA015 | 541330 | ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE OXYGEN DEFICIENCY MONITORING SYSTEM (ODMS) AT THE BOOSTER FABRICATION FACILITY (BFF). | $45K |
| Sep 23, 2022 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC022F0174 | 541330 | B301 LN2 STORAGE | $334K |
| Sep 21, 2022 | Department of CommerceDEPT OF COMMERCE NIST | 1333ND22FNB190256 | 541620 | BPA CALL 005 | $608K |
| Sep 20, 2022 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC022F0180 | 541330 | LV ARC FLASH ANALYSIS PHASE 1 | $563K |
| Sep 16, 2022 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99022F00001 | 541620 | C100747 - DATA-DRIVEN FACILITY MANAGEMENT. CO: ZACHARY PRICE CS: MARIO HENRIQUEZ COR: KYLASH RAMESH PAST PERFORMANCE POC: STEVE O'REILLY | $744K |
| Sep 13, 2022 | Department of the InteriorWASHINGTON CONTRACTING OFFICE | 140P2122F0184 | 541620 | GRSM001 & GRSM002 CONDITON ASSESSMENT | $55K |
| Sep 12, 2022 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC022F0171 | 541330 | NEAT WP3 ALTITUDE CHAMBER | $310K |
| Sep 9, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC022FA084 | 541330 | THE REVISION OF UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS) VARIOUS DISCIPLINES AT THE KENNEDY SPACE CENTER (KSC), FLORIDA. | $291K |
| Sep 2, 2022 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC021F0161 | 541330 | A/E TASK ORDER FOR HV ARC FLASH STUDY | $283K |
| Aug 5, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0154 | 541330 | DESIGN INTERIOR RENOVATIONS AT THE BOOSTER FABRICATION FACILITY (BFF) COMPLEX | $150K |
| Jul 21, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC022FA038 | 541330 | ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF UPGRADE FIRE PROTECTION SYSTEMS AT ROTATION PROCESSING SURGE FACILITY (RPSF). | $14K |
| Jun 7, 2022 | General Services AdministrationPBS R4 AMD CAPITAL/AE BRANCH | 47PE0322F0016 | 541620 | SAVANNAH GA COURTHOUSE ANNEX FALL PROTECTION DESIGN SERVICES | $31K |
| Apr 25, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0155 | 541330 | DESIGN OF REPLACE OPERATIONS & CHECKOUT SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KSC, FL PCN: 99311 | $203K |
| Apr 22, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC022FA038 | 541330 | ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF UPGRADE FIRE PROTECTION SYSTEMS AT ROTATION PROCESSING SURGE FACILITY (RPSF). | $145K |
| Feb 25, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC022FA019 | 541330 | ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF THE CONSTRUCTION OF SAFETY AND RELIABILITY UPGRADE, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 4A, PROJECT CONTROL NUMBER (PCN) 98966.4A. | $94K |
| Feb 24, 2022 | Department of DefenseW7M2 USPFO ACTIVITY FLANG 125 | W50S6Y22F0002 | 541620 | COMPREHENSIVE DRINKING WATER CROSS-CONNECTION & BACK-FLOW PREVENTION SURVEY | $19K |
| Jan 18, 2022 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0154 | 541330 | DESIGN INTERIOR RENOVATIONS AT THE BOOSTER FABRICATION FACILITY (BFF) COMPLEX | $27K |
| Dec 27, 2021 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC022F0011 | 541330 | A/E SERVICES - ISP STEAM PIPE FLEXIBILITY ANALYSIS PHASE II | $128K |
| Dec 20, 2021 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0108 | 541330 | ENGINEERING SERVICES DURING CONSTRUCTION OF SAFETY AND RELIABILITY UPGRADE, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 4, PROJECT CONTROL NUMBER 98966.4. | $8K |
| Nov 23, 2021 | General Services AdministrationPBS R4 AMD BLUE RIDGE EAST BRANCH | 47PE0621F0122 | 541620 | FALL PROTECTION SURVEY-NORTH CAROLINA | $4K |
| Nov 23, 2021 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC022F0007 | 541330 | B144 E38/39 EXHAUSTERS AND SPRAY MUFFLER/STACK (SNUBBER) | $51K |
| Nov 19, 2021 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC021F0090 | 541330 | A&E TASK ORDER FOR ISP FACILITY STEAM PIPE FLEXIBILITY ANALYSIS | $13K |
| Nov 18, 2021 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0083 | 541330 | FIRE ALARM AUDIBILITY & VISIBILITY IMPROVEMENTS SSPF PCN 99406 | $10K |
| Nov 2, 2021 | Department of the InteriorWASHINGTON CONTRACTING OFFICE | 140P2122F0001 | 541620 | GLCA007 CONDITION ASSESSMENT | $495K |
| Sep 17, 2021 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0176 | 541330 | ENGINEERING SERVICES DURING THE CONSTRUCTION OF BOOSTER FABRICATION FACILITY (BFF) SWITCHGEAR REPLACEMENT - SUBSTATIONS 1114, 1115, AND 1116 | $216K |
Get Alerted Before Nelson Engineering CO.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free