Federal Contractor Profile
Nelson Engineering CO.
$55.7M obligated·147 awards·9 agencies·4 NAICS
Federal Contracts
Showing contracts 1–50 of 178 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Feb 3, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC26FA010 | 541330 | ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) BUILDING 4583 ELECTRICAL REVITALIZATON | $141K |
| Feb 2, 2026 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC026FA004 | 541330 | ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF SAFETY AND RELIABILITY UPGRADES, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 6, REVISION A. PROJECT CONTROL NUMBER (PCN) 98996.6 | $270K |
| Jan 26, 2026 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC025FA015 | 541330 | SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO DO A PUMP HOUSE ALTERNATIVES STUDY AT THE ROTATION, PROCESSING, AND SURGE FACILITY (RPSF) AT KENNEDY SPACE CENTER, FLORIDA | $74K |
| Dec 19, 2025 | Department of DefenseMISSILE DEFENSE AGENCY (MDA) | HQ085926FG372 | 541715 | SCALABLE HOMELAND INNOVATIVE ENTERPRISE LAYERED DEFENSE (SHIELD) INITIAL ORDER. | $500 |
| Dec 19, 2025 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC023FA155 | 541330 | ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE SS-1113 A/B AT THE BOOSTER FABRICATION FACILITY CHILLER NOTE: SIGNED MOD IS 80KSC023FA152 - CORRECTION PENDING | $9K |
| Sep 26, 2025 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC023FA155 | 541330 | ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE SS-1113 A/B AT THE BOOSTER FABRICATION FACILITY CHILLER NOTE: SIGNED MOD IS 80KSC023FA152 - CORRECTION PENDING | $13K |
| Sep 24, 2025 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC023FA178 | 541330 | SOUTHEAST REGIONAL ARCHITECT AND ENGINEERING DESIGN INDEFINITE DELIVERY INDEFINITE QUANTITY. PROJECT CONTROL NUMBER 99311. | $67K |
| Sep 12, 2025 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC023FA155 | 541330 | ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE SS-1113 A/B AT THE BOOSTER FABRICATION FACILITY CHILLER NOTE: SIGNED MOD IS 80KSC023FA152 - CORRECTION PENDING | $8K |
| Sep 12, 2025 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99024F00003 | 541620 | C104631 CALL 10 CS: CHRIS HSU CO: ZACH PRICE COR: THOMAS LAWRENCE | $1.5M |
| Aug 28, 2025 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99024F00004 | 541620 | C100747- DATA DRIVEN FACILITY MANAGEMENT SERVICES CS: CHRIS HSU CO: ZACH PRICE COR: KYLASH RAMESH | $3.0M |
| Jul 24, 2025 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC025FA066 | 541330 | SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO REVISED NASA UNIFIED FACILITIES GUIDE SPECIFICATION (UFGS) SECTIONS VARIOUS DISCIPLINES AT KENNEDY SPACE CENTER, FLORIDA | $213K |
| Jun 27, 2025 | Department of the InteriorWASHINGTON CONTRACTING OFFICE | 140P2125F0082 | 541620 | CONDUCT A VISUAL INSPECTION OF ALL COMPONENTS (E.G. STRUCTURAL, CIVIL, MECHANICAL, PLUMBING AND ELECTRICAL) FOR EACH ASSET IN APPENDIX I. IDENTIFY AND DOCUMENT CURRENT CONDITION, REMAINING LIFE, DEFERRED MAINTENANCE, AND FUTURE MAINTENANCE REQUIREMEN | $149K |
| Jun 11, 2025 | Department of the InteriorWASHINGTON CONTRACTING OFFICE | 140P2125F0069 | 541620 | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND TRAVEL TO PERFORM A CONDITION ASSESSMENT (CA) AT GEORGE WASHINGTON NATIONAL PARKWAY & NATIONAL MALL & MEMORIAL PARKS (NPS) REAL PROPERTY ASSIGNED TO THE CONCESSIONER UNDER CONCESSION CONT | $181K |
| Apr 16, 2025 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC025FA015 | 541330 | SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO DO A PUMP HOUSE ALTERNATIVES STUDY AT THE ROTATION, PROCESSING, AND SURGE FACILITY (RPSF) AT KENNEDY SPACE CENTER, FLORIDA | $433K |
| Apr 16, 2025 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC023FA178 | 541330 | SOUTHEAST REGIONAL ARCHITECT AND ENGINEERING DESIGN INDEFINITE DELIVERY INDEFINITE QUANTITY. PROJECT CONTROL NUMBER 99311. | $73K |
| Feb 26, 2025 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0176 | 541330 | ENGINEERING SERVICES DURING THE CONSTRUCTION OF BOOSTER FABRICATION FACILITY (BFF) SWITCHGEAR REPLACEMENT - SUBSTATIONS 1114, 1115, AND 1116 | $59K |
| Feb 24, 2025 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC024FA094 | 541330 | ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF INTERIOR RENOVATIONS AT THE BOOSTER FABRICATION FACILITY (BFF), KSC, FL | $122K |
| Jan 30, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC025F7016 | 541330 | A&E TASK ORDER FOR ATF STEAM AUGMENTATION | $309K |
| Jan 28, 2025 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC25F7020 | 541330 | COMPRESSOR 9 DESIGN-BUILD REQUEST FOR PROPOSAL AND FUNCTIONAL REQUIREMENTS DOCUMENT | $256K |
| Dec 18, 2024 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC023FA178 | 541330 | SOUTHEAST REGIONAL ARCHITECT AND ENGINEERING DESIGN INDEFINITE DELIVERY INDEFINITE QUANTITY. PROJECT CONTROL NUMBER 99311. | $53K |
| Dec 2, 2024 | National Aeronautics and Space AdministrationNASA STENNIS SPACE CENTER | 80SSC024FA023 | 541330 | ARCHITECT-ENGINEER SERVICES FOR THE DEVELOPMENT OF A DESIGN PACKAGE (DESIGN-BID-BUILD) FOR THE REFURBISHMENT OF THE BASCULE BRIDGE AT STENNIS SPACE CENTER, MS | $29K |
| Oct 30, 2024 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC025FA010 | 541330 | ARCHITECT-ENGINEER SERVICES, DESIGN LOW VOLTAGE UPGRADES BOOSTER FABRICATION FACILITY: PROJECT CONTROL NUMBER: 99604 | $409K |
| Sep 26, 2024 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC024FA094 | 541330 | ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF INTERIOR RENOVATIONS AT THE BOOSTER FABRICATION FACILITY (BFF), KSC, FL | $868K |
| Sep 20, 2024 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC024FA093 | 541330 | ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) FOR SAFETY AND RELIABILITY UPGRADE, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 5, KSC, FL | $322K |
| Sep 16, 2024 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC24FA112 | 541330 | TASK ORDER 80MSFC24FA112 MSFC REVITALIZE ELECTRICAL SYSTEMS BUILDING 4583 BASE AWARD | $399K |
| Sep 5, 2024 | National Aeronautics and Space AdministrationNASA STENNIS SPACE CENTER | 80SSC024FA023 | 541330 | ARCHITECT-ENGINEER SERVICES FOR THE DEVELOPMENT OF A DESIGN PACKAGE (DESIGN-BID-BUILD) FOR THE REFURBISHMENT OF THE BASCULE BRIDGE AT STENNIS SPACE CENTER, MS | $487K |
| Sep 4, 2024 | Department of the InteriorWASHINGTON CONTRACTING OFFICE | 140P2124F0235 | 541620 | CS - GWMP005 NAMA00 CONDITION ASSESSMENT | $198K |
| Sep 4, 2024 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC024F0071 | 541330 | ATF LV AFA - ARC FLASH PHASE 2 | $397K |
| Aug 30, 2024 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99024F00003 | 541620 | C104631 CALL 10 CS: CHRIS HSU CO: ZACH PRICE COR: THOMAS LAWRENCE | $1.1M |
| Aug 30, 2024 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99024F00004 | 541620 | C100747- DATA DRIVEN FACILITY MANAGEMENT SERVICES CS: CHRIS HSU CO: ZACH PRICE COR: KYLASH RAMESH | $2.7M |
| Aug 9, 2024 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC022FA019 | 541330 | ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF THE CONSTRUCTION OF SAFETY AND RELIABILITY UPGRADE, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 4A, PROJECT CONTROL NUMBER (PCN) 98966.4A. | $65K |
| Jul 11, 2024 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC024FA083 | 541330 | TASK ORDER 80KSC024FA083 COMPRESSOR STUDIES BASE AND OPTION 1 BASE AWARD (ENTERED IN SAP IN ERROR) | $282K |
| Jul 11, 2024 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC24FA083 | 541330 | TASK ORDER 80MSFC24FA083 COMPRESSOR STUDIES BASE AND OPTION 1 BASE AWARD | $282K |
| Jun 11, 2024 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99024F00002 | 541620 | C116720 - STRUCTURAL ENGINEERING ASSESSMENT OF EXTERIOR GRATES ON BETHESDA, POOLESVILLE, FT. DETRICK IRF, AND BAYVIEW CAMPUSES CS: CHRIS HSU CO: ZACH PRICE COR: KYLASH RAMESH | $21K |
| May 20, 2024 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0108 | 541330 | ENGINEERING SERVICES DURING CONSTRUCTION OF SAFETY AND RELIABILITY UPGRADE, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 4, PROJECT CONTROL NUMBER 98966.4. | $43K |
| Apr 9, 2024 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0154 | 541330 | DESIGN INTERIOR RENOVATIONS AT THE BOOSTER FABRICATION FACILITY (BFF) COMPLEX | $58K |
| Mar 12, 2024 | Department of CommerceDEPT OF COMMERCE NIST | 1333ND24FNB190061 | 541620 | CAPITAL ASSET MANAGEMENT, BPA CALL 9: GIS DELIVERABLES AT THE GAITHERSBURG, MD CAMPUS AND BOULDER, CO CAMPUS. | $154K |
| Feb 28, 2024 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0108 | 541330 | ENGINEERING SERVICES DURING CONSTRUCTION OF SAFETY AND RELIABILITY UPGRADE, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 4, PROJECT CONTROL NUMBER 98966.4. | $13K |
| Feb 25, 2024 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99024F00002 | 541620 | C116720 - STRUCTURAL ENGINEERING ASSESSMENT OF EXTERIOR GRATES ON BETHESDA, POOLESVILLE, FT. DETRICK IRF, AND BAYVIEW CAMPUSES CS: CHRIS HSU CO: ZACH PRICE COR: KYLASH RAMESH | $274K |
| Feb 22, 2024 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99024F00001 | 541620 | C104631: CALL 9 FACILITY ASSESSMENT SERVICES CS: CHRIS HSU CO: ZACH PRICE COR: NGA NGUYEN | $1.2M |
| Feb 21, 2024 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC024F0021 | 541330 | NASA TIERED MAINTENANCE PH III | $1.6M |
| Feb 9, 2024 | Department of CommerceDEPT OF COMMERCE NIST | 1333ND24FNB190028 | 541620 | CAPITAL ASSET MANAGEMENT CONSULTING SERVICES BPA CALL 8: FACILITY CONDITION ASSESSMENT. NIST GAITHERSBURG CAMPUS LOCATED IN MD. | $406K |
| Dec 19, 2023 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC024FA013 | 541330 | DESIGN REFRESH OF SAFE AND RELIABILITY ELECTRICAL UPGRADES, PHASES 5 & 6. | $155K |
| Nov 30, 2023 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC022F0011 | 541330 | A/E SERVICES - ISP STEAM PIPE FLEXIBILITY ANALYSIS PHASE II | $14K |
| Nov 30, 2023 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 80GRC022F0174 | 541330 | B301 LN2 STORAGE | $101K |
| Oct 23, 2023 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC021F0108 | 541330 | ENGINEERING SERVICES DURING CONSTRUCTION OF SAFETY AND RELIABILITY UPGRADE, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 4, PROJECT CONTROL NUMBER 98966.4. | $23K |
| Sep 27, 2023 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99023F00004 | 541620 | C100747 DATA-DRIVEN FACILITY MANAGEMENT SERVICES. COR: KYLASH RAMESH CO: MARIO HENRIQUEZ | $500K |
| Sep 20, 2023 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC023FA178 | 541330 | SOUTHEAST REGIONAL ARCHITECT AND ENGINEERING DESIGN INDEFINITE DELIVERY INDEFINITE QUANTITY. PROJECT CONTROL NUMBER 99311. | $1.1M |
| Aug 29, 2023 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC23F0062 | 541330 | ARCHITECT AND ENGINEER DESIGN FOR LARC ROTOCRAFT TEST STAND (RTS) UNINTERRUPTIBLE POWER SUPPLY (UPS) PROJECT | $100K |
| Aug 18, 2023 | National Aeronautics and Space AdministrationNASA KENNEDY SPACE CENTER | 80KSC023FA155 | 541330 | ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE SS-1113 A/B AT THE BOOSTER FABRICATION FACILITY CHILLER NOTE: SIGNED MOD IS 80KSC023FA152 - CORRECTION PENDING | $199K |
Get Alerted Before Nelson Engineering CO.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free