Federal Contractor Profile
Nobis Engineering, INC
$94M obligated·90 awards·3 agencies·1 NAICS
Federal Contracts
Showing contracts 1–50 of 272 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Feb 27, 2026 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0321F0088 | 562910 | REGION 3 MULTI-SITE FIELD SERVICES SUPPORT THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE THE ENVIRONMENTAL PROTECTION AGENCY (EPA) WITH FIELD | $78K |
| Feb 2, 2026 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0122F0011 | 562910 | ESO TASK ORDER FOR TECHNICAL ASSISTANCE ACTIVITIES AT THE ELIZABETH MINE SUPERFUND SITE IN STRAFFORD, VT. | $461K |
| Jan 23, 2026 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0321F0039 | 562910 | SHAFER/ARBUCKLE CREEK AREA SITE - REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES) THE PURPOSE OF THIS TASK ORDER (TO) IS FOR THE CONTRACTOR TO PERFORM REMEDIAL INVESTIGATION AND FEASIBILITY STUDY (RI/FS) SUPPORT SERVICES | $32K |
| Dec 23, 2025 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0124F0013 | 562910 | DES PIKE HILL COPPER MINES SUPERFUND SITE RA OVERSIGHT | $358K |
| Dec 15, 2025 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0124F0011 | 562910 | ELY SF RA OVERSIGHT - NOBIS DES | $984K |
| Dec 9, 2025 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0321F0088 | 562910 | REGION 3 MULTI-SITE FIELD SERVICES SUPPORT THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE THE ENVIRONMENTAL PROTECTION AGENCY (EPA) WITH FIELD | $19K |
| Sep 24, 2025 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0124F0013 | 562910 | DES PIKE HILL COPPER MINES SUPERFUND SITE RA OVERSIGHT | $531K |
| Sep 22, 2025 | Environmental Protection AgencyREGION 2 CONTRACTING OFFICE | 68HE0220F0082 | 562910 | RAF PHASE 1 AND 2 TARGETED BROWNFIELDS ASSESSMENTS (TBAS) | $21K |
| Aug 5, 2025 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0124F0022 | 562910 | RAF DES TASK ORDER TO NOBIS ENGINEERING, INC. TASK ORDER SACO TANNERY WASTE PITS SUPERFUND SITE IN SACO, MAINE. APPROVAL OF WORK PLAN AND COST ESTIMATE. | $321K |
| Jul 27, 2025 | Environmental Protection AgencyREGION 2 CONTRACTING OFFICE | 68HE0220F0045 | 562910 | THE PURPOSE OF THIS REQUIREMENT AND THE STATEMENT OF WORK (SOW) IS TO PROPERLY CONDUCT LONG-TERM REMEDIAL ACTION (LTRA) ACTIVITIES AT THE COROZAL WELL SITE. THIS INCLUDES THE FOLLOWING: -PERFORMANCE OF THE LONG-TERM MONITORING PLAN (LTMP), -GROUNDW | $11K |
| Jun 13, 2025 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0121F0051 | 562910 | DES CONTRACT NOBIS GROUP RAYMARK OU5/7/8 APPROVAL OF WORK PLAN AND COST ESTIMATE | $128K |
| Jun 6, 2025 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0120F0044 | 562910 | INITIATION OF ESO TASK ORDER FOR NAVAL CONSTRUCTION BATTALION CENTER (NORTH KINGSTOWN, RI) AND FORT DEVENS (DEVENS, MA) OVERSIGHT ACTIVITIES | $121K |
| May 22, 2025 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0121F0015 | 562910 | REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES). ISSUANCE OF TASK ORDER FOR THE MICROFAB SUPERFUND SITE. | $298K |
| Apr 3, 2025 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0320F0031 | 562910 | 033D ORDNANCE PRODUCTS LONG-TERM REMEDIAL ACTION (LTRA) FOR THE OPERATIONS OF THE GROUNDWATER TREATMENT AND EXTRACTION SYSTEM AND MONITORING AT OU-2. | $698K |
| Mar 27, 2025 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0321F0088 | 562910 | REGION 3 MULTI-SITE FIELD SERVICES SUPPORT THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE THE ENVIRONMENTAL PROTECTION AGENCY (EPA) WITH FIELD | $15K |
| Mar 27, 2025 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0324F0041 | 562910 | MCADOO ASSOCIATES (0312) OU00 CONTRACT: ESO/NOBIS ENGINEERING, CONTRACT: 68HE0118D0007, TASK ORDER: NEW TECH ASSIST: SAMPLING MONITORING WELLS IN SUPPORT OF THE FIVE-YEAR REVIEW USING VOLUMETRIC METHODS FOR ANALYSIS OF VOLATILE ORGANICS AND INORGA | $4K |
| Dec 20, 2024 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0321F0088 | 562910 | REGION 3 MULTI-SITE FIELD SERVICES SUPPORT THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE THE ENVIRONMENTAL PROTECTION AGENCY (EPA) WITH FIELD | $67K |
| Dec 13, 2024 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0321F0088 | 562910 | REGION 3 MULTI-SITE FIELD SERVICES SUPPORT THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE THE ENVIRONMENTAL PROTECTION AGENCY (EPA) WITH FIELD | $35K |
| Sep 27, 2024 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0320F0031 | 562910 | 033D ORDNANCE PRODUCTS LONG-TERM REMEDIAL ACTION (LTRA) FOR THE OPERATIONS OF THE GROUNDWATER TREATMENT AND EXTRACTION SYSTEM AND MONITORING AT OU-2. | $721K |
| Sep 24, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0120F0044 | 562910 | INITIATION OF ESO TASK ORDER FOR NAVAL CONSTRUCTION BATTALION CENTER (NORTH KINGSTOWN, RI) AND FORT DEVENS (DEVENS, MA) OVERSIGHT ACTIVITIES | $335K |
| Sep 23, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0124F0044 | 562910 | CREESE AND COOK RA SUPPORT (DES). AWARD AND FUNDING FOR RA001 AND RA002. | $4.6M |
| Sep 19, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0122F0046 | 562910 | AWARD OF RAF DES TASK ORDER FOR THE PIKE HILL RI/FS AND TECHNICAL ASSISTANCE. | $494K |
| Sep 17, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0122F0011 | 562910 | ESO TASK ORDER FOR TECHNICAL ASSISTANCE ACTIVITIES AT THE ELIZABETH MINE SUPERFUND SITE IN STRAFFORD, VT. | $377K |
| Sep 4, 2024 | Environmental Protection AgencyREGION 2 CONTRACTING OFFICE | 68HE0220F0045 | 562910 | THE PURPOSE OF THIS REQUIREMENT AND THE STATEMENT OF WORK (SOW) IS TO PROPERLY CONDUCT LONG-TERM REMEDIAL ACTION (LTRA) ACTIVITIES AT THE COROZAL WELL SITE. THIS INCLUDES THE FOLLOWING: -PERFORMANCE OF THE LONG-TERM MONITORING PLAN (LTMP), -GROUNDW | $2K |
| Aug 28, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0121F0051 | 562910 | DES CONTRACT NOBIS GROUP RAYMARK OU5/7/8 APPROVAL OF WORK PLAN AND COST ESTIMATE | $133K |
| Aug 28, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0121F0041 | 562910 | ENHANCED IN SITU BIOREMEDIATION (EISB) REMEDIAL ACTION (RA) AT THE EASTERN SURPLUS SUPERFUND SITE, LOCATED IN MEDDYBEMPS, WASHINGTON COUNTY, MAINE | $2.0M |
| Aug 27, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0122F0011 | 562910 | ESO TASK ORDER FOR TECHNICAL ASSISTANCE ACTIVITIES AT THE ELIZABETH MINE SUPERFUND SITE IN STRAFFORD, VT. | $26K |
| Aug 15, 2024 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0321F0088 | 562910 | REGION 3 MULTI-SITE FIELD SERVICES SUPPORT THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE THE ENVIRONMENTAL PROTECTION AGENCY (EPA) WITH FIELD | $54K |
| Jul 24, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0121F0015 | 562910 | REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES). ISSUANCE OF TASK ORDER FOR THE MICROFAB SUPERFUND SITE. | $213K |
| Jul 23, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0120F0014 | 562910 | AWARD OF REGION 1 ESO TASK ORDER FOR OVERSIGHT SUPPORT AT SULLIVAN'S LEDGE SUPERFUND SITE IN NEW BEDFORD, BRISTAL COUNTY, MA. | $201K |
| Jul 22, 2024 | Environmental Protection AgencyREGION 2 CONTRACTING OFFICE | 68HE0220F0045 | 562910 | THE PURPOSE OF THIS REQUIREMENT AND THE STATEMENT OF WORK (SOW) IS TO PROPERLY CONDUCT LONG-TERM REMEDIAL ACTION (LTRA) ACTIVITIES AT THE COROZAL WELL SITE. THIS INCLUDES THE FOLLOWING: -PERFORMANCE OF THE LONG-TERM MONITORING PLAN (LTMP), -GROUNDW | $29K |
| Jul 9, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0124F0022 | 562910 | RAF DES TASK ORDER TO NOBIS ENGINEERING, INC. TASK ORDER SACO TANNERY WASTE PITS SUPERFUND SITE IN SACO, MAINE. APPROVAL OF WORK PLAN AND COST ESTIMATE. | $1.0M |
| Jul 9, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0120F0048 | 562910 | RECOMMEND APPROVAL FOR TASK ORDER AWARD TO NOBIS ENGINEERING, CONTRACT 68HE0118D0007, UNDER RFO 68HE0120Q0022, OVERSIGHT AT NEW LONDON NAVAL SUB BASE AND NETC | $507K |
| Jun 12, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0122F0011 | 562910 | ESO TASK ORDER FOR TECHNICAL ASSISTANCE ACTIVITIES AT THE ELIZABETH MINE SUPERFUND SITE IN STRAFFORD, VT. | $63K |
| Jun 11, 2024 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0321F0088 | 562910 | REGION 3 MULTI-SITE FIELD SERVICES SUPPORT THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE THE ENVIRONMENTAL PROTECTION AGENCY (EPA) WITH FIELD | $18K |
| Jun 5, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0121F0015 | 562910 | REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES). ISSUANCE OF TASK ORDER FOR THE MICROFAB SUPERFUND SITE. | $228K |
| May 30, 2024 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0320F0031 | 562910 | 033D ORDNANCE PRODUCTS LONG-TERM REMEDIAL ACTION (LTRA) FOR THE OPERATIONS OF THE GROUNDWATER TREATMENT AND EXTRACTION SYSTEM AND MONITORING AT OU-2. | $56K |
| May 21, 2024 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0324F0041 | 562910 | MCADOO ASSOCIATES (0312) OU00 CONTRACT: ESO/NOBIS ENGINEERING, CONTRACT: 68HE0118D0007, TASK ORDER: NEW TECH ASSIST: SAMPLING MONITORING WELLS IN SUPPORT OF THE FIVE-YEAR REVIEW USING VOLUMETRIC METHODS FOR ANALYSIS OF VOLATILE ORGANICS AND INORGA | $41K |
| May 16, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0124F0013 | 562910 | DES PIKE HILL COPPER MINES SUPERFUND SITE RA OVERSIGHT | $0 |
| May 9, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0124F0013 | 562910 | DES PIKE HILL COPPER MINES SUPERFUND SITE RA OVERSIGHT | $1.3M |
| May 8, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0124F0011 | 562910 | ELY SF RA OVERSIGHT - NOBIS DES | $1.3M |
| Apr 30, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0121F0018 | 562910 | THIS ACTION INITIATES A NEW TASK ORDER UNDER THE REMEDIAL ACTION FRAMEWORK (RAF) FOR DESIGN AND ENVIRONMENTAL SERVICES (DES)FOR THE KEDDY MILL SUPERFUND SITE RI/FS SUPPORT. | $883K |
| Apr 19, 2024 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0321F0088 | 562910 | REGION 3 MULTI-SITE FIELD SERVICES SUPPORT THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE THE ENVIRONMENTAL PROTECTION AGENCY (EPA) WITH FIELD | $175K |
| Apr 17, 2024 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0324F0032 | 562910 | THIS IS A REMEDIATION ACTION FRAMEWORK (RAF) ENVIRONMENTAL SERVICES OVERSIGHT (ESO) TASK ORDER (TO) TO OBTAIN CONTRACTOR SUPPORT TO OPERATE AND MAINTAIN (O&M) THE INTERIM GROUNDWATER COLLECTION AND TREATMENT SYSTEM (GCTS) AS PART OF THE NON-TIME | $2.2M |
| Jan 30, 2024 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0321F0039 | 562910 | SHAFER/ARBUCKLE CREEK AREA SITE - REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES) THE PURPOSE OF THIS TASK ORDER (TO) IS FOR THE CONTRACTOR TO PERFORM REMEDIAL INVESTIGATION AND FEASIBILITY STUDY (RI/FS) SUPPORT SERVICES | $56K |
| Jan 19, 2024 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0321F0088 | 562910 | REGION 3 MULTI-SITE FIELD SERVICES SUPPORT THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE THE ENVIRONMENTAL PROTECTION AGENCY (EPA) WITH FIELD | $163K |
| Jan 10, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0120F0025 | 562910 | THIS ACTION INITIATES A NEW TASK ORDER UNDER THE REMEDIAL ACTION FRAMEWORK (RAF)FOR DESIGN AND ENVIRONMENTAL SERVICES (DES)FOR THE OLIN CHEMICAL SUPERFUND SITE. THIS TASK ORDER IS A COST PLUS FIXED FEE ORDER UNDER RAF DES CLIN 001. | $1.6M |
| Jan 10, 2024 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0122F0011 | 562910 | ESO TASK ORDER FOR TECHNICAL ASSISTANCE ACTIVITIES AT THE ELIZABETH MINE SUPERFUND SITE IN STRAFFORD, VT. | $358K |
| Oct 26, 2023 | Environmental Protection AgencyREGION 1 CONTRACTING OFFICE | 68HE0124F0005 | 562910 | SCOVILL DES RA OVERSIGHT. CONTRACT #: 68HE0318D00013, NOBIS | $2.1M |
| Oct 23, 2023 | Environmental Protection AgencyREGION 3 CONTRACTING OFFICE | 68HE0321F0039 | 562910 | SHAFER/ARBUCKLE CREEK AREA SITE - REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES) THE PURPOSE OF THIS TASK ORDER (TO) IS FOR THE CONTRACTOR TO PERFORM REMEDIAL INVESTIGATION AND FEASIBILITY STUDY (RI/FS) SUPPORT SERVICES | $46K |
Get Alerted Before Nobis Engineering, INC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free