Showing award actions 1–50 of 75 funded award actions, most recent first.

Contracts with positive obligations
54
Funded award actions shown
75
Obligations shown
$63M
Awarding agencies
1

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of July 22, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
May 13, 2026Department of DefenseFA4819 325 CONS PKPFA481926F0011237310REPAIR EXISTING STORMWATER INFRASTRUCTURE (DRAINPIPE AND INLET STRUCTURES) AT SELECTED AREAS WITHIN THE TYNDALL AFB MAIN AIRFIELD. THE EXISTING STORMWATER INFRASTRUCTURE IS IN DEGRADED CONDITION AND NEEDS TO BE REPLACED.$7.4M
Mar 25, 2026Department of DefenseFA4819 325 CONS PKPFA481923F0037237310REPAIR EXISTING STORM WATER DRAINPIPE AND DRAINAGE STRUCTURES.$3.1M
Mar 16, 2026Department of DefenseFA4819 325 CONS PKPFA481926F0003237310MAINTENANCE OF AIRFIELD PAINT AND RUBBER$1.3M
Jan 6, 2026Department of DefenseFA4819 325 CONS PKPFA481924F0030237310REPAIR EXISTING BARRIER FOUNDATIONS ON DRONE RUNWAY$249K
Aug 15, 2025Department of DefenseFA4819 325 CONS PKPFA481925F0033237310REPAIR TAXIWAY$95K
Aug 15, 2025Department of DefenseFA4819 325 CONS PKPFA481925F0049237310AIRFIELD MARKING REPAIRS AND PAINTING$834K
Feb 11, 2025Department of DefenseFA4819 325 CONS PKPFA481925F0010237310INSTALL SIX NEW GROUNDING POINTS AT SELECTED AREAS OF THE FORMER ALERT PAD APRON FOR TEMPORARY E-9 OPERATIONS PER THE SOW DATED 20 NOV 2024 .$3K
Jan 16, 2025Department of DefenseFA4819 325 CONS PKPFA481925F0010237310INSTALL SIX NEW GROUNDING POINTS AT SELECTED AREAS OF THE FORMER ALERT PAD APRON FOR TEMPORARY E-9 OPERATIONS PER THE SOW DATED 20 NOV 2024 .$25K
Jun 25, 2024Department of DefenseFA4819 325 CONS PKPFA481924F0030237310REPAIR EXISTING BARRIER FOUNDATIONS ON DRONE RUNWAY$522K
Apr 4, 2024Department of DefenseFA4819 325 CONS PKPFA481924F0014237310THE GOVERNMENT REQUESTS A PROPOSAL TO REPAIR EXISTING TAXIWAY K CONCRETE SURFACE FOR FUTURE E-9 AIRCRAFT OPERATIONS.$98K
Feb 27, 2024Department of DefenseFA4819 325 CONS PKPFA481924F0010237310CONCRETE SLAB REPLACEMENT SUPPORT FOR RESEARCH, DEVELOPMENT, TEST AND EVALUATION PROJECTS AT TYNDALL AFB.$63K
Dec 21, 2023Department of DefenseFA4819 325 CONS PKPFA481924F0004237310MAINTAIN AIRFIELD PAINT MARKINGS ON THE TYNDALL FLIGHTLINE AND REMOVE EXCESS RUBBER BUILDUP ON THE MAIN AIRFIELD RUNWAYS.$873K
Sep 15, 2023Department of DefenseFA4819 325 CONS PKPFA481923F0085237310REPAIR EXISTING STORMWATER INFRASTRUCTURE (DRAINPIPE AND INLET STRUCTURES) AT SELECTED AREAS WITHIN THE TYNDALL AFB MAIN AIRFIELD$1.7M
Aug 3, 2023Department of DefenseFA4819 325 CONS PKPFA481922F0054237310REPAIR AIRFIELD PAVEMENTS (TAXIWAY F CENTER KEEL SLABS)$99K
Jun 12, 2023Department of DefenseFA4819 325 CONS PKPFA481923F0037237310REPAIR EXISTING STORM WATER DRAINPIPE AND DRAINAGE STRUCTURES.$1.7M
Jan 11, 2023Department of DefenseFA4819 325 CONS PKPFA481923F0005237310CONVERT PAVEMENT AND EXPAND TAXIWAY BRAVO$1.4M
Sep 30, 2022Department of DefenseFA4819 325 CONS PKPFA481922F0116237310THE PURPOSE OF THIS PROJECT IS TO REPAIR THE AIRFIELD PAVEMENT LOCATED ON TAXIWAY A FOR THE CENTER PORTION OF THE SLABS ON TYNDALL AFB.$78K
Sep 27, 2022Department of DefenseFA4819 325 CONS PKPFA481922F0116237310THE PURPOSE OF THIS PROJECT IS TO REPAIR THE AIRFIELD PAVEMENT LOCATED ON TAXIWAY A FOR THE CENTER PORTION OF THE SLABS ON TYNDALL AFB.$3.9M
Sep 27, 2022Department of DefenseFA4819 325 CONS PKPFA481922F0117237310THE PROJECT IS FOR AIRFIELD MARKING REPAIRS AND PAINTING ON TYNDALL AFB MAIN AIRFIELD.$767K
Sep 14, 2022Department of DefenseFA4819 325 CONS PKPFA481922F0062237310THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR AIRFIELD PAVEMENT ON THE OPERATIONS SIDE OF TYNDALL AFB.$1.0M
Sep 14, 2022Department of DefenseFA4819 325 CONS PKPFA481922F0100237310WORK CONSISTS OF REPAIRS TO EXISTING CENTERLINE ROAD LOCATED BETWEEN RUNWAY 14R/32L AND RUNWAY 14L/32R.$1.9M
Sep 2, 2022Department of DefenseFA4819 325 CONS PKPFA481922F0054237310REPAIR AIRFIELD PAVEMENTS (TAXIWAY F CENTER KEEL SLABS)$170K
Aug 19, 2022Department of DefenseFA4819 325 CONS PKPFA481922F0002237310THE PURPOSE OF THIS TASK IS ORDER IS TO REPAIR TAXIWAY H.$9K
Jul 15, 2022Department of DefenseFA4819 325 CONS PKPFA481922F0054237310REPAIR AIRFIELD PAVEMENTS (TAXIWAY F CENTER KEEL SLABS)$2.3M
Jun 22, 2022Department of DefenseFA4819 325 CONS PKPFA481922F0038237310THIS IS TO SETTLE AND PAY A CLAIM FOR HURRICANE MICHAEL.$69K
May 19, 2022Department of DefenseFA4819 325 CONS PKPFA481922F0031237310THE PURPOSE OF THIS TASK ORDER IS TO ADD ADDITIONAL PAINT MARKINGS.$826K
Nov 9, 2021Department of DefenseFA4819 325 CONS PKPFA481922F0002237310THE PURPOSE OF THIS TASK IS ORDER IS TO REPAIR TAXIWAY H.$4.8M
Sep 30, 2021Department of DefenseFA4819 325 CONS PKPFA481921F0077237310THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR AIRFIELD PAVEMENT ON THE OPERATIONS SIDE OF TYNDALL AFB.$95K
Sep 29, 2021Department of DefenseFA4819 325 CONS PKPFA481921F0077237310THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR AIRFIELD PAVEMENT ON THE OPERATIONS SIDE OF TYNDALL AFB.$694K
Sep 24, 2021Department of DefenseFA4819 325 CONS PKPFA481921F0073237310THE PURPOSE OF THIS REQUIREMENT IS TO SERVICE AIRFIELD OPERATIONS IN TOWING AWAY MATERIAL.$234K
Jan 19, 2021Department of DefenseFA4819 325 CONS PKPFA481920F0022237310DEMOLITION AND REPLACEMENT OF EXISTING PORTLAND CEMENT CONCRETE (PCC) SLABS WITHIN THE FOOTPRINT OF FORMER FUEL BARN FACILITY 335.$5K
Dec 3, 2020Department of DefenseFA4819 325 CONS PKPFA481920F0013237310WORK CONSISTS OF JOINT SEALANT REMOVAL AND REPLACEMENT, TO INCLUDE JOINT WIDENING TO ACCOMMODATE NEW BACKER ROD AT THE MAIN PARKING APRON. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT PER SCOPE OF WORK DATED 11 FEBRUARY 2020.$40K
Sep 21, 2020Department of DefenseFA4819 325 CONS PKPFA481920F0022237310DEMOLITION AND REPLACEMENT OF EXISTING PORTLAND CEMENT CONCRETE (PCC) SLABS WITHIN THE FOOTPRINT OF FORMER FUEL BARN FACILITY 335.$137K
Sep 16, 2020Department of DefenseFA4819 325 CONS PKPFA481920F0054237310WORK CONSISTS OF SLURRY SEAL TREATMENT ON OUTSIDE RUNWAY ASPHALT AND RANDOM SLAB REPAIRS ON OUTSIDE RUNWAY EDGE SLABS LOCATED NEAR TAXIWAY H CENTER. POP 120 DAYS$384K
Jul 29, 2020Department of DefenseFA4819 325 CONS PKPFA481920F0028237310REPAIR EXISTING ILS AREA PERIMETER ROAD LOCATED ON NORTHWESTERN PORTION OF TYNDALL FLIGHTLINE.$1.1M
Jul 28, 2020Department of DefenseFA4819 325 CONS PKPFA481920F0022237310DEMOLITION AND REPLACEMENT OF EXISTING PORTLAND CEMENT CONCRETE (PCC) SLABS WITHIN THE FOOTPRINT OF FORMER FUEL BARN FACILITY 335.$234K
Jul 28, 2020Department of DefenseFA4819 325 CONS PKPFA481920F0029237310REPAIR TRIM PAD AND POWER CHECK APRON AT TYNDALL AFB$2.4M
May 6, 2020Department of DefenseFA4819 325 CONS PKPFA481920F0008237310MILL AND OVERLAY OUTSIDE RUNWAY OVERRUNS$5K
Apr 14, 2020Department of DefenseFA4819 325 CONS PKPFA481920F0016237310DEMO AND REPLACEMENT OF PCC CONCRETE PER DRAWINGS. CRUSHING OF CONCRETE STOCKPILE. POP 365$2.3M
Apr 13, 2020Department of DefenseFA4819 325 CONS PKPFA481920F0014237310REMOVING EXISTING TREE STUMPS FROM 4 ACRE AREA THAT WILL BE USED FOR FUTURE STOCKPILING AND CRUSHING OF CLEAN CONCRETE, AND SITE PREP WORK NEEDED TO ESTABLISH FIRM WORK SURFACE FOR FUTURE STOCKPILED MATERIALS$423K
Apr 13, 2020Department of DefenseFA4819 325 CONS PKPFA481920F0015237310REMOVING EXCESS PAINT BUILD-UP AT THE INSIDE RUNWAY TOUCHDOWN ZONES AND PAINTING OF VARIOUS AIRFIELD MARKINGS IN ACCORDANCE WITH UFC-3-260-04$479K
Apr 8, 2020Department of DefenseFA4819 325 CONS PKPFA481920F0013237310WORK CONSISTS OF JOINT SEALANT REMOVAL AND REPLACEMENT, TO INCLUDE JOINT WIDENING TO ACCOMMODATE NEW BACKER ROD AT THE MAIN PARKING APRON. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT PER SCOPE OF WORK DATED 11 FEBRUARY 2020.$2.2M
Apr 6, 2020Department of DefenseFA4819 325 CONS PKPFA481920F0008237310MILL AND OVERLAY OUTSIDE RUNWAY OVERRUNS$29K
Mar 6, 2020Department of DefenseFA4819 325 CONS PKPFA481920F0008237310MILL AND OVERLAY OUTSIDE RUNWAY OVERRUNS$1.1M
Sep 12, 2019Department of DefenseFA4819 325 CONS PKPFA481919FA003237310REPAIR OF HURRICANE MICHAEL DAMAGED PERIMETER FENCE$29K
Sep 3, 2019Department of DefenseFA4819 325 CONS PKPFA481919FA044237310PAINT DRONE RUNWAY TYNDALL AFB POP 150 DAYS $700K$702K
Aug 12, 2019Department of DefenseFA4819 325 CONS PKPFA481918F7024237310REPAIR AIRFIELD PAVEMENTS XLWU 16-1090$12K
Aug 9, 2019Department of DefenseFA4819 325 CONS PKPFA481919FA008237310IGF::OT::IGF REMOVE RUBBER AND REPAINT$38K
Jul 23, 2019Department of DefenseFA4819 325 CONS PKPFA481919FA031237310REPAIR AIRFIELD PAVEMENTS TYNDALL POP 365 DAYS $3M$3.5M
Jul 12, 2019Department of DefenseFA4819 325 CONS PKPFA481919FA026237310REPAINT PARKING APRONS TYNDALL AFB$76K