Skip to content
Home/Contractors/R Cubed Engineering LLC

Federal Contractor Profile

R Cubed Engineering LLC

Federal contracting record: $88M obligated across 21 awards from 2 agencies, FY 2016–2026.

$88M
Total Obligated
21
Award Records
2
Agencies Served
4
NAICS Codes

Company Profile

Parent UEI (Unique Entity Identifier)

YAM9E6G1AHE5

CAGE Code

581Y4

Address

705 10TH AVE W # 102, PALMETTO, FL, 342214616

First Federal Award

Apr 18, 2016

Most Recent Award

May 27, 2026

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

Top NAICS Activity

  • 541715

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)

    15 awards

    $86M
  • 541712

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)

    4 awards

    $2.1M
  • 334515

    INSTRUMENT MANUFACTURING FOR MEASURING AND TESTING ELECTRICITY AND ELECTRICAL SIGNALS

    1 awards

    $53K
  • 334511

    SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING

    1 awards

    $5K

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Jun 17, 2026Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715SBIR PHASE III RESEARCH AND DEVELOPMENT$1.1M
Sep 16, 2025Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715SBIR PHASE III RESEARCH & DEVELOPMENT$7.0M
May 19, 2025Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715SBIR PHASE III RESEARCH AND DEVELOPMENT$497K
Apr 1, 2025Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715SBIR PHASE III RESEARCH AND DEVELOPMENT$116K
Mar 24, 2025Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715SBIR PHASE III RESEARCH AND DEVELOPMENT$3.2M
Feb 4, 2025Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715SBIR PHASE III RESEARCH AND DEVELOPMENT$4.9M
Sep 26, 2024Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715SBIR PHASE III RESEARCH AND DEVELOPMENT$20M
Sep 25, 2024Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715SBIR PHASE III RESEARCH AND DEVELOPMENT$5.4M
Sep 12, 2024Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715SBIR PHASE III RESEARCH AND DEVELOPMENT$6.2M
Aug 20, 2024Department of DefenseW6QK AATD CONTR OFF541715FINAL REPORT$3.6M
Aug 15, 2024Department of DefenseFA2823 AFTC PZIO334515MODE 5 TRANSPONDER AND GPS DATA$53K
Nov 21, 2023Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715SBIR PHASE III RESEARCH AND DEVELOPMENT$981K
Jun 22, 2023Department of DefenseW6QK AATD CONTR OFF541715FINAL REPORT$4.2M
Jun 14, 2023Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715SBIR PHASE III RESEARCH AND DEVELOPMENT$1.2M
Sep 21, 2022Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715SBIR PH III$6.7M
Mar 19, 2022Department of DefenseW6QK AATD CONTR OFF541715R CUBED ENGINEERING SBIR PHASE II$190K
Sep 25, 2021Department of DefenseW6QK AATD CONTR OFF541715R CUBED ENGINEERING SBIR PHASE II$910K
Sep 21, 2021National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER541715THIS SBIR DEMONSTRATES THAT ADVANCED DEVELOPMENT OF SOFTWARE DEFINED RADIOS (SDRS) HAS PRODUCED HIGHLY CAPABLE, MULTIFUNCTIONAL, MINIATURE AVIONICS SUITABLE FOR ALL AIRCRAFT.$375K
Sep 10, 2021Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715RESEARCH AND DEVELOPMENT$3.0M
Aug 24, 2021Department of DefenseW6QK AATD CONTR OFF541715FINAL REPORT$4.5M
Jul 8, 2020Department of DefenseW6QK AATD CONTR OFF541715FINAL REPORT$4.5M
May 8, 2020Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715RESEARCH AND DEVELOPMENT$582K
Jan 24, 2020Department of DefenseW6QK AATD CONTR OFF541715SBIR PHASE I FINAL REPORT AND PROJECT SUMMARY$108K
Oct 7, 2019Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715RESEARCH AND DEVELOPMENT$4.0M
Sep 19, 2019Department of DefenseNAVAIR WARFARE CTR AIRCRAFT DIV541715RESEARCH AND DEVELOPMENT$2.4M

Want to win work like R Cubed Engineering LLC?

Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.