Skip to content
Home/Contractors/R. J. Zavoral & Sons, INC.

Federal Contractor Profile

R. J. Zavoral & Sons, INC.

Federal contracting record: $59M obligated across 4 awards from 1 agencies, FY 2016–2026.

$59M
Total Obligated
4
Award Records
1
Agencies Served
2
NAICS Codes

Company Profile

Parent UEI (Unique Entity Identifier)

DMJLG6ADDJS6

CAGE Code

0GNN6

Address

1706 BYGLAND RD SE, EAST GRAND FORKS, MN, 567213212

First Federal Award

Apr 4, 2016

Most Recent Award

Oct 16, 2025

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

Top NAICS Activity

  • 237990

    OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

    3 awards

    $59M
  • 237310

    HIGHWAY, STREET, AND BRIDGE CONSTRUCTION

    1 awards

    $89K

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Sep 29, 2025Department of DefenseW07V ENDIST ST PAUL237990FMM SOUTHERN EMBANKMENT SE-2B$13M
Jul 21, 2025Department of DefenseW07V ENDIST ST PAUL237990FMM SOUTHERN EMBANKMENT SE-2B$1.9M
Nov 12, 2024Department of DefenseW07V ENDIST ST PAUL237990FMM SOUTHERN EMBANKMENT SE-2B$1.6M
Sep 27, 2024Department of DefenseW07V ENDIST ST PAUL237990FMM SOUTHERN EMBANKMENT SE-2B$10K
Sep 26, 2024Department of DefenseW07V ENDIST ST PAUL237990FMM SOUTHERN EMBANKMENT SE-2B$250K
Jul 25, 2024Department of DefenseW07V ENDIST ST PAUL237990FMM SOUTHERN EMBANKMENT SE-2B$38K
Jul 2, 2024Department of DefenseW07V ENDIST ST PAUL237990FMM SOUTHERN EMBANKMENT SE-2B$18M
Mar 11, 2024Department of DefenseW07V ENDIST ST PAUL237990FMM SOUTHERN EMBANKMENT SE-2B$24M
Jul 1, 2020Department of DefenseW07V ENDIST ST PAUL237310BITUMINOUS OVERLAY OF ROAD$1K
Jun 3, 2019Department of DefenseW07V ENDIST ST PAUL237310BITUMINOUS OVERLAY OF ROAD$88K
Mar 7, 2017Department of DefenseW07V ENDIST ST PAUL237990IGF::OT::IGF THE WORK INCLUDES BUT IS NOT LIMITED TO CONSTRUCTION SERVICES TO COMPLETE APPROXIMATELY 6,500 FEET OF THE ROSEAU DIVERSION CHANNEL, THE CHANNEL INLET STRUCTURE INTO THE DIVERSION CHANNEL FROM THE ROSEAU RIVER AND A CONCRETE RESTRICTION STRUCTURE SPANNING THE ROSEAU RIVER. THE DIVERSION CHANNEL IS APPROXIMATELY 16-18 FEET DEEP IN MOST OF THIS REACH. WORK INCLUDES APPROXIMATELY 700,000 CUBIC YARDS OF EXCAVATION OF POTENTIALLY SATURATED SOILS IN A RELATIVELY SHORT PERIOD OF 150 - 180 CALENDAR DAYS. WINTER EXCAVATION WILL BE REQUIRED. A PERMANENT SUBTERRANEAN DRAINAGE SYSTEM IS REQUIRED AND THE CONTRACTOR WILL NEED TO APPLY EXPERTISE IN MANAGING HIGH GROUND WATER LEVELS WITHIN THE EXCAVATION AREA.$8K →
Jan 13, 2017Department of DefenseW07V ENDIST ST PAUL237990IGF::OT::IGF WORK UNDER THIS CONTRACT INCLUDES THE PROVISION OF A DEWATERING PUMP, PUMP CONTROLS AND ASSOCIATED PIPING FOR DEWATERING THE HOMME DAM DISCHARGE SPILLWAY.$12K →
Dec 22, 2016Department of DefenseW07V ENDIST ST PAUL237990IGF::OT::IGF THE WORK INCLUDES BUT IS NOT LIMITED TO CONSTRUCTION SERVICES TO COMPLETE APPROXIMATELY 6,500 FEET OF THE ROSEAU DIVERSION CHANNEL, THE CHANNEL INLET STRUCTURE INTO THE DIVERSION CHANNEL FROM THE ROSEAU RIVER AND A CONCRETE RESTRICTION STRUCTURE SPANNING THE ROSEAU RIVER. THE DIVERSION CHANNEL IS APPROXIMATELY 16-18 FEET DEEP IN MOST OF THIS REACH. WORK INCLUDES APPROXIMATELY 700,000 CUBIC YARDS OF EXCAVATION OF POTENTIALLY SATURATED SOILS IN A RELATIVELY SHORT PERIOD OF 150 - 180 CALENDAR DAYS. WINTER EXCAVATION WILL BE REQUIRED. A PERMANENT SUBTERRANEAN DRAINAGE SYSTEM IS REQUIRED AND THE CONTRACTOR WILL NEED TO APPLY EXPERTISE IN MANAGING HIGH GROUND WATER LEVELS WITHIN THE EXCAVATION AREA.$122K →
Sep 30, 2016Department of DefenseW07V ENDIST ST PAUL237990IGF::OT::IGF THE WORK INCLUDES BUT IS NOT LIMITED TO CONSTRUCTION SERVICES TO COMPLETE APPROXIMATELY 6,500 FEET OF THE ROSEAU DIVERSION CHANNEL, THE CHANNEL INLET STRUCTURE INTO THE DIVERSION CHANNEL FROM THE ROSEAU RIVER AND A CONCRETE RESTRICTION STRUCTURE SPANNING THE ROSEAU RIVER. THE DIVERSION CHANNEL IS APPROXIMATELY 16-18 FEET DEEP IN MOST OF THIS REACH. WORK INCLUDES APPROXIMATELY 700,000 CUBIC YARDS OF EXCAVATION OF POTENTIALLY SATURATED SOILS IN A RELATIVELY SHORT PERIOD OF 150 - 180 CALENDAR DAYS. WINTER EXCAVATION WILL BE REQUIRED. A PERMANENT SUBTERRANEAN DRAINAGE SYSTEM IS REQUIRED AND THE CONTRACTOR WILL NEED TO APPLY EXPERTISE IN MANAGING HIGH GROUND WATER LEVELS WITHIN THE EXCAVATION AREA.$88K →
Apr 4, 2016Department of DefenseW07V ENDIST ST PAUL237990IGF::OT::IGF WORK UNDER THIS CONTRACT INCLUDES THE PROVISION OF A DEWATERING PUMP, PUMP CONTROLS AND ASSOCIATED PIPING FOR DEWATERING THE HOMME DAM DISCHARGE SPILLWAY.$4K →

Want to win work like R. J. Zavoral & Sons, INC.?

Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.