Skip to content

Federal Contractor Profile

R. J. Zavoral & Sons, INC.

$59M obligated·4 awards·1 agencies·2 NAICS

Federal Contracts

Showing award actions 1–15 of 15 funded award actions, most recent first.

Contracts with positive obligations
4
Funded award actions shown
15
Obligations shown
$59M
Awarding agencies
1

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of June 22, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Sep 29, 2025Department of DefenseW07V ENDIST ST PAULW912ES24C0009237990FMM SOUTHERN EMBANKMENT SE-2B$13M
Jul 21, 2025Department of DefenseW07V ENDIST ST PAULW912ES24C0009237990FMM SOUTHERN EMBANKMENT SE-2B$1.9M
Nov 12, 2024Department of DefenseW07V ENDIST ST PAULW912ES24C0009237990FMM SOUTHERN EMBANKMENT SE-2B$1.6M
Sep 27, 2024Department of DefenseW07V ENDIST ST PAULW912ES24C0009237990FMM SOUTHERN EMBANKMENT SE-2B$10K
Sep 26, 2024Department of DefenseW07V ENDIST ST PAULW912ES24C0009237990FMM SOUTHERN EMBANKMENT SE-2B$250K
Jul 25, 2024Department of DefenseW07V ENDIST ST PAULW912ES24C0009237990FMM SOUTHERN EMBANKMENT SE-2B$38K
Jul 2, 2024Department of DefenseW07V ENDIST ST PAULW912ES24C0009237990FMM SOUTHERN EMBANKMENT SE-2B$18M
Mar 11, 2024Department of DefenseW07V ENDIST ST PAULW912ES24C0009237990FMM SOUTHERN EMBANKMENT SE-2B$24M
Jul 1, 2020Department of DefenseW07V ENDIST ST PAULW912ES19P0062237310BITUMINOUS OVERLAY OF ROAD$1K
Jun 3, 2019Department of DefenseW07V ENDIST ST PAULW912ES19P0062237310BITUMINOUS OVERLAY OF ROAD$88K
Mar 7, 2017Department of DefenseW07V ENDIST ST PAULW912ES14C0011237990IGF::OT::IGF THE WORK INCLUDES BUT IS NOT LIMITED TO CONSTRUCTION SERVICES TO COMPLETE APPROXIMATELY 6,500 FEET OF THE ROSEAU DIVERSION CHANNEL, THE CHANNEL INLET STRUCTURE INTO THE DIVERSION CHANNEL FROM THE ROSEAU RIVER AND A CONCRETE RESTRICTION STRUCTURE SPANNING THE ROSEAU RIVER. THE DIVERSION CHANNEL IS APPROXIMATELY 16-18 FEET DEEP IN MOST OF THIS REACH. WORK INCLUDES APPROXIMATELY 700,000 CUBIC YARDS OF EXCAVATION OF POTENTIALLY SATURATED SOILS IN A RELATIVELY SHORT PERIOD OF 150 - 180 CALENDAR DAYS. WINTER EXCAVATION WILL BE REQUIRED. A PERMANENT SUBTERRANEAN DRAINAGE SYSTEM IS REQUIRED AND THE CONTRACTOR WILL NEED TO APPLY EXPERTISE IN MANAGING HIGH GROUND WATER LEVELS WITHIN THE EXCAVATION AREA.$8K
Jan 13, 2017Department of DefenseW07V ENDIST ST PAULW912ES15P0147237990IGF::OT::IGF WORK UNDER THIS CONTRACT INCLUDES THE PROVISION OF A DEWATERING PUMP, PUMP CONTROLS AND ASSOCIATED PIPING FOR DEWATERING THE HOMME DAM DISCHARGE SPILLWAY.$12K
Dec 22, 2016Department of DefenseW07V ENDIST ST PAULW912ES14C0011237990IGF::OT::IGF THE WORK INCLUDES BUT IS NOT LIMITED TO CONSTRUCTION SERVICES TO COMPLETE APPROXIMATELY 6,500 FEET OF THE ROSEAU DIVERSION CHANNEL, THE CHANNEL INLET STRUCTURE INTO THE DIVERSION CHANNEL FROM THE ROSEAU RIVER AND A CONCRETE RESTRICTION STRUCTURE SPANNING THE ROSEAU RIVER. THE DIVERSION CHANNEL IS APPROXIMATELY 16-18 FEET DEEP IN MOST OF THIS REACH. WORK INCLUDES APPROXIMATELY 700,000 CUBIC YARDS OF EXCAVATION OF POTENTIALLY SATURATED SOILS IN A RELATIVELY SHORT PERIOD OF 150 - 180 CALENDAR DAYS. WINTER EXCAVATION WILL BE REQUIRED. A PERMANENT SUBTERRANEAN DRAINAGE SYSTEM IS REQUIRED AND THE CONTRACTOR WILL NEED TO APPLY EXPERTISE IN MANAGING HIGH GROUND WATER LEVELS WITHIN THE EXCAVATION AREA.$122K
Sep 30, 2016Department of DefenseW07V ENDIST ST PAULW912ES14C0011237990IGF::OT::IGF THE WORK INCLUDES BUT IS NOT LIMITED TO CONSTRUCTION SERVICES TO COMPLETE APPROXIMATELY 6,500 FEET OF THE ROSEAU DIVERSION CHANNEL, THE CHANNEL INLET STRUCTURE INTO THE DIVERSION CHANNEL FROM THE ROSEAU RIVER AND A CONCRETE RESTRICTION STRUCTURE SPANNING THE ROSEAU RIVER. THE DIVERSION CHANNEL IS APPROXIMATELY 16-18 FEET DEEP IN MOST OF THIS REACH. WORK INCLUDES APPROXIMATELY 700,000 CUBIC YARDS OF EXCAVATION OF POTENTIALLY SATURATED SOILS IN A RELATIVELY SHORT PERIOD OF 150 - 180 CALENDAR DAYS. WINTER EXCAVATION WILL BE REQUIRED. A PERMANENT SUBTERRANEAN DRAINAGE SYSTEM IS REQUIRED AND THE CONTRACTOR WILL NEED TO APPLY EXPERTISE IN MANAGING HIGH GROUND WATER LEVELS WITHIN THE EXCAVATION AREA.$88K
Apr 4, 2016Department of DefenseW07V ENDIST ST PAULW912ES15P0147237990IGF::OT::IGF WORK UNDER THIS CONTRACT INCLUDES THE PROVISION OF A DEWATERING PUMP, PUMP CONTROLS AND ASSOCIATED PIPING FOR DEWATERING THE HOMME DAM DISCHARGE SPILLWAY.$4K

Get Alerted Before R. J. Zavoral & Sons, INC.'s Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start for free