Federal Contractor Profile
The Regents Of The University Of Colorado
$886M obligated·737 awards·19 agencies·66 NAICS
Federal Contracts
Showing award actions 1–50 of 953 funded award actions, most recent first.
- Contracts with positive obligations
- 737
- Funded award actions shown
- 953
- Obligations shown
- $886M
- Awarding agencies
- 19
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of August 28, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 28, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC23CA035 | 541715 | SUPPORT FOR THE SNOW AND ICE DISTRIBUTED ACTIVE ARCHIVE CENTER (DAAC) FOR THE EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM (EOSDIS) | $4.9M |
| Aug 28, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC24CA050 | 541715 | DYNAMICAL NEUTRAL ATMOSPHERE-IONOSPHERE COUPLING-X (DAPHNE) PHASE A | $4.0M |
| Aug 28, 2026 | Department of EnergyFEDERAL ENERGY REGULATORY COMM | 89603022P0030 | 511210 | RIVERWARE LICENSES | $12K |
| Aug 26, 2026 | Department of CommerceDEPT OF COMMERCE NOAA | 1305M326P0184 | 541990 | SERVICES, NON-PERSONAL, TO PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS (UNLESS OTHERWISE PROVIDED HEREIN) NECESSARY FOR IMPROVING THE IDENTIFICATION OF DROUGHT INDICATOR THRESHOLDS AND RESPONSE ACTION TRIGGERS IN THE DROUGHT PLANNING PLATFORM. | $300K |
| Aug 24, 2026 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC026FA129 | 541715 | ELUCIDATING THE ROLE OF INTEGRIN MECHANOTRANSDUCTION IN RESPONSE TO MICROGRAVITY | $150K |
| Aug 17, 2026 | Department of CommerceDEPT OF COMMERCE NOAA | 1305M326F0180 | 541380 | ISOTOPE ANALYSIS OF ATMOSPHERIC TRACE GASES IDIQ - TASK ORDER 01 | $533K |
| Aug 13, 2026 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC26F7016 | 541715 | LIBERA SPACECRAFT INTEGRATION AND TEST (I&T) SUPPORT DURING INTEGRATION OF LIBERA TO THE HOST JOINT POLAR SATELLITE SYSTEM-4 (JPSS-4) SPACECRAFT. EXTENSION OF LAUNCH READINESS DATE FROM JANUARY 2027 TO SEPTEMBER 2027 | $2.5M |
| Aug 11, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC26C0014 | 541715 | DUSTER WILL MEASURE DUST, PLASMA, MICROMETEOROID IMPACTS, AND LANDER EJECTA AT THE LUNAR SOUTH POLE TO ASSESS HAZARDS FOR ARTEMIS MISSIONS. | $4.0M |
| Aug 1, 2026 | Department of the InteriorLOWER COLORADO REGIONAL OFFICE | 140R3026F0063 | 541511 | RIVERWARE SOFTWARE SUPPORT SERVICES FOR LCB | $229K |
| Jul 31, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | GSFC0200210DNAS502140 | 541710 | EXTREME ULTRAVIOLET VARIABILITY EXPERIMENT (EVE) FOR THE SOLAR DYNAMICS OBSERVATORY(SDO) | $560K |
| Jul 27, 2026 | Department of CommerceDEPT OF COMMERCE NOAA | 1333MJ26P0022 | 541360 | SAMPLING SERVICES NIWOT RIDGE | $61K |
| Jul 23, 2026 | Department of the InteriorIBC ACQ SVCS DIRECTORATE (00004) | 140D0421P0129 | 611310 | RECRUITING SERVICES - COLORADO UNIVERSITY BOULDER | $20K |
| Jul 22, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG07HW00C | 541330 | TAS::80 0120::TAS THIS CONTRACT IS FOR THE TASKS NECESSARY TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, EVALUATE AND SUPPORT LAUNCH OF THE EUVS XRS IRRADIANCE SENSORS (EXIS), SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE EXIS IS CLASSIFIED AS A NON-PRIMARY INSTRUMENT SUITE ON THE GOES-R SATELLITE AND HAS A RISK CLASSIFICATION OF B. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR 4 FLIGHT MODELS B) ONE EXIS FLIGHT MODEL (FM) C) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) D) TWO EXIS EMULATORS (EXISES) E) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) F) ONE GROUND PROCESSING DEVELOPMENT SYSTEM (GPDS) G) SPARES FOR THE FOUR FMS H) ALL ADDITIONAL EXIS MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT I) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT: A) OPTION 1 FOR AN ADDITIONAL FLIGHT MODEL (FM-2) B) OPTION 2 FOR AN ADDITIONAL FLIGHT MODEL (FM-3) C) OPTION 3FOR AN ADDITIONAL FLIGHT MODEL (FM-3) | $30K |
| Jul 20, 2026 | Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH NICHD | 75N94020F00001 | 541714 | TO ASSIST IN THE DEVELOPMENT OF NEW CONTRACEPTIVE PRODUCTS BY PROVIDING SERVICES RELATED TO PROTOCOL REVIEW, PROTOCOL DEVELOPMENT AND ACTIVITIES ASSOCIATED WITH PAST, PRESENT AND FUTURE CCTN ACTIVITIES. UNIVERSITY OF COLORADO-75N94020D00019/75N940 | $17K |
| Jul 16, 2026 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC18C0001 | 541715 | CLIMATE ABSOLUTE RADIANCE AND REFRACTIVITY OBSERVATORY PATHFINDER INSTRUMENT, PAYLOAD, AND MISSION OPERATIONS | $2.0M |
| Jul 13, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC20C0016 | 541715 | LUNAR COMPACT INFRARED SYSTEM (L-CIRIS) | $196K |
| Jun 30, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC26C0014 | 541715 | DUSTER WILL MEASURE DUST, PLASMA, MICROMETEOROID IMPACTS, AND LANDER EJECTA AT THE LUNAR SOUTH POLE TO ASSESS HAZARDS FOR ARTEMIS MISSIONS. | $7.2M |
| Jun 30, 2026 | Department of the InteriorUPPER COLORADO REGIONAL OFFICE | 140R4026F0057 | 541511 | MRG RIVERWARE SUPPORT AND DEVELOPMENT | $175K |
| Jun 29, 2026 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC026FA062 | 541715 | IN SPACE EXPANSION OF HEMATOPOIETIC STEM CELLS FOR CLINICAL APPLICATION, PHASE 1B | $268K |
| Jun 25, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNH10CC04C | 541712 | NASA HEADQUARTERS (HQ) MANAGES THE MARS EXPLORATION PROGRAM (MEP), WHICH SELECTED THE MARS ATMOSPHERE AND VOLATILE EVOLUTION (MAVEN) PROJECT AS A MARS SCOUT MISSION. THE MAVEN PRINCIPAL INVESTIGATOR (PI) IS DR. BRUCE JAKOSKY, OF THE UNIVERSITY OF COLORADO, LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP) IN BOULDER, CO. THE PI WILL HAVE OVERALL CONTROL OF THE MAVEN PROJECT. HE WILL PROVIDE SCIENCE LEADERSHIP FOR THE MAVEN MISSION AND MANAGE EDUCATION AND PUBLIC OUTREACH. THIS EFFORT APPLIES TO LASP AND COVERS PHASES A, B, C, D, AND E OF THE MAVEN MISSION. UNDER PHASE A OF THIS CONTRACT, THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULE MANAGEMENT, PROVIDING TECHNICAL PROGRESS REPORTS, AND MISSION REVIEWS. UNDER PHASE B, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING REQUIREMENTS ANALYSIS, PROJECT PLANS, PRELIMINARY DESIGN REVIEWS, MONTHLY STATUS REVIEWS, QUARTERLY TEAM MEETINGS, E/PO ACTIVITIES, AND THE PRELIMINARY SCIENCE DATA MANAGEMENT PLAN. UNDER PHASES C AND D, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING MONTHLY STATUS REVIEWS, QUARTERLY TEAM REVIEWS, RESPONDING TO ACTION ITEMS THAT RESULT FROM MEETINGS/REVIEWS, SUPPORTING FORMAL REVIEWS AND LAUNCH SITE ACTIVITIES, AND MANAGEMENT OF E/PO ACTIVITIES. UNDER PHASE E, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING OVERALL MANAGEMENT OF THE MAVEN SCIENCE PROGRAM AND DATA ANALYSIS ACTIVITIES, ENSURING DELIVERY OF MAVEN SCIENCE DATA PRODUCTS, MISSION DOCUMENTATION, AND ANALYTICAL SOFTWARE TOOLS INTO PDS, PARTICIPATING IN ANALYSIS AND RESOLUTION OF SPACECRAFT ANOMALIES, AS NECESSARY, PROVIDING OVERALL MANAGEMENT OF E/PO ACTIVITIES PER E/PO PLAN, PRESENTING SCIENTIFIC RESULTS AT NATIONAL CONFERENCES AND IN SCIENTIFIC LITERATURE, AND PROVIDING CONTRACT CLOSEOUT SUPPORT. | $12K |
| Jun 17, 2026 | Department of the InteriorGREAT PLAINS REGIONAL OFFICE | 140R6026F0047 | 541511 | NORTH PLATTE RIVERWARE MODEL PHASE II | $48K |
| Jun 9, 2026 | Department of the InteriorUPPER COLORADO REGIONAL OFFICE | 140R4022P0068 | 532420 | CADSWES EQUIPMENT, SPACE, AND ADMINISTRATIVE AND TECHNICAL SUPPORT | $90K |
| Jun 9, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC23CA062 | 517810 | PROVIDE CONTINUED MISSION OPERATIONS AND DATA PROCESSING SUPPORT SERVICES TO CONTINUE PERFORMING KEY CLIMATE MEASUREMENTS THROUGH TOTAL AND SPECTRAL SOLAR IRRADIANCE SENSOR SYSTEMS CURRENTLY IN OPERATION ON THE INTERNATIONAL SPACE STATION. | $1.7M |
| Jun 2, 2026 | Department of the InteriorGREAT PLAINS REGIONAL OFFICE | 140R6026F0033 | 541511 | CADSWES RIVERWARE 2026 | $93K |
| May 28, 2026 | Department of DefenseFA2394 USAF AFMC AFRL PZL AFRL RXKM | FA239425CB003 | 541715 | IN-SITU NON-DESTRUCTIVE INSPECTION USING HETEROGENOUS COLLABORATIVE ROBOTS | $200K |
| May 19, 2026 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC20D0006 | 541715 | LIBERA, EARTH VENTURE CONTINUITY 1 MISSION. PROVIDE AN INSTRUMENT TO BE INTEGRATED ON THE UPCOMING JOINT POLAR SATELLITE SYSTEM-3 SATELLITE THAT WILL MEASURE SHORT WAVE LONG WAVE AND TOTAL RADIATION AT TOP OF THE ATMOSPHERE | $2.0M |
| May 13, 2026 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC18C0001 | 541715 | CLIMATE ABSOLUTE RADIANCE AND REFRACTIVITY OBSERVATORY PATHFINDER INSTRUMENT, PAYLOAD, AND MISSION OPERATIONS | $1.5M |
| May 6, 2026 | Department of CommerceDEPT OF COMMERCE NOAA | 1333MJ25P0050 | 561990 | ISOTOPE INTERPRETATION SERVICES | $47K |
| Apr 30, 2026 | Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH NICHD | 75N94025F00001 | 541714 | NICHD: SERVICE: CCTN LB PHASE 2B CLINICAL TRIAL: NON-SEVERABLE | $499K |
| Apr 30, 2026 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC26F7016 | 541715 | LIBERA SPACECRAFT INTEGRATION AND TEST (I&T) SUPPORT DURING INTEGRATION OF LIBERA TO THE HOST JOINT POLAR SATELLITE SYSTEM-4 (JPSS-4) SPACECRAFT. EXTENSION OF LAUNCH READINESS DATE FROM JANUARY 2027 TO SEPTEMBER 2027 | $2.0M |
| Apr 29, 2026 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC026FA096 | 541715 | CONTINUED TESTING IN THE ISS CABIN ENVIRONMENT IN SUPPORT OF THE PARTICULATE MONITORING PROJECT WITH THE EXPLORATION AEROSOL MONITORS (EXAM) PAYLOAD, ALSO KNOWN MORE SIMPLY AS THE AEROSOL MONITORS PAYLOAD. | $94K |
| Apr 7, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0061 | 541720 | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. | $490K |
| Apr 7, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC19C0069 | 336419 | PROVIDE ENGINEERING ANALYSES, HARDWARE & SOFTWARE DEVELOPMENT, FABRICATION, INTEGRATION, TEST, EVALUATION, INTEGRATION WITH SPACECRAFT, LAUNCH, INSTRUMENT ACTIVATION, CALIBRATION, VALIDATION, & OPERATIONS THROUGH 60-DAY CHECKOUT FOR TSIS2 PAYLOAD. | $267K |
| Apr 7, 2026 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC026FA011 | 541715 | THIS TASK ORDER COVERS THE WORK REQUIRED TO SUPPORT THE SCIENTIFIC RESEARCH OUTLINED BELOW AND COVERS THE GOVERNMENT REQUIREMENTS FOR MISSION INTEGRATION & OPERATIONS FOR THE INVESTIGATION TITLED MEGAKARYOCYTES FLYING TWO PAYLOAD NAME: MEF2 | $120K |
| Apr 6, 2026 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC26C0004 | 541715 | DUSTER WILL MEASURE DUST, PLASMA, MICROMETEOROID IMPACTS, AND LANDER EJECTA AT THE LUNAR SOUTH POLE TO ASSESS HAZARDS FOR ARTEMIS MISSIONS. | $7.2M |
| Apr 1, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | GSFC0200210DNAS502140 | 541710 | EXTREME ULTRAVIOLET VARIABILITY EXPERIMENT (EVE) FOR THE SOLAR DYNAMICS OBSERVATORY(SDO) | $500K |
| Mar 30, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC23CA035 | 541715 | SUPPORT FOR THE SNOW AND ICE DISTRIBUTED ACTIVE ARCHIVE CENTER (DAAC) FOR THE EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM (EOSDIS) | $5.9M |
| Mar 26, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0061 | 541720 | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. | $2.4M |
| Mar 19, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC23CA035 | 541715 | SUPPORT FOR THE SNOW AND ICE DISTRIBUTED ACTIVE ARCHIVE CENTER (DAAC) FOR THE EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM (EOSDIS) | $130K |
| Mar 17, 2026 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0232 | 541990 | MICORGRAVITY ANALOGS AS PROXIES FOR SPACEFLIGHT MISSION INTEGRATION AND OPERATIONS | $19K |
| Mar 12, 2026 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC026FA069 | 541715 | THIS TO PROVIDES REQUIREMENTS FOR BIOSERVE SPACE TECHNOLOGIES (BIOSERVE) TO PROVIDE SUSTAINING ENGINEERING SERVICES FOR THE GALLEY REFRIGERATOR. | $13K |
| Mar 3, 2026 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC22CA001 | 541715 | CALIBRATION OF THE LUNAR SPECTRAL REFLECTION FROM SPACE OF THE ARCTONE INSTRUMENT TO INCLUDE FUNCTIONS SUCH AS: CHARACTERIZATION OF THE ARCTONE INSTRUMENT DESIGN, FABRICATE AND TEST ITS FLIGHT CALIBRATION SYSTEM PARTICIPATE IN PAYLOAD ACTIVITIES | $93K |
| Mar 2, 2026 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC023F0069 | 541990 | C. ELEGANS BIOLOGICAL INVESTIGATION ON MICROBIOME EFFECT IN SPACE | $22K |
| Feb 27, 2026 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC26F7016 | 541715 | LIBERA SPACECRAFT INTEGRATION AND TEST (I&T) SUPPORT DURING INTEGRATION OF LIBERA TO THE HOST JOINT POLAR SATELLITE SYSTEM-4 (JPSS-4) SPACECRAFT. EXTENSION OF LAUNCH READINESS DATE FROM JANUARY 2027 TO SEPTEMBER 2027 | $2.0M |
| Feb 24, 2026 | Department of CommerceDEPT OF COMMERCE NOAA | 1305M226C0012 | 541715 | RADAR NEXT-BAA FOR UNIVERSITY OF COLORADO "THE IMPACTS OF ASSIMILATING OBSERVATIONS FROM VARIOUS WEATHER RADAR NETWORK CONFIGURATIONS ON A REGIONAL FORECAST SYSTEM" | $599K |
| Feb 24, 2026 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC20D0006 | 541715 | LIBERA, EARTH VENTURE CONTINUITY 1 MISSION. PROVIDE AN INSTRUMENT TO BE INTEGRATED ON THE UPCOMING JOINT POLAR SATELLITE SYSTEM-3 SATELLITE THAT WILL MEASURE SHORT WAVE LONG WAVE AND TOTAL RADIATION AT TOP OF THE ATMOSPHERE | $2.8M |
| Feb 23, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNH10CC04C | 541712 | NASA HEADQUARTERS (HQ) MANAGES THE MARS EXPLORATION PROGRAM (MEP), WHICH SELECTED THE MARS ATMOSPHERE AND VOLATILE EVOLUTION (MAVEN) PROJECT AS A MARS SCOUT MISSION. THE MAVEN PRINCIPAL INVESTIGATOR (PI) IS DR. BRUCE JAKOSKY, OF THE UNIVERSITY OF COLORADO, LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP) IN BOULDER, CO. THE PI WILL HAVE OVERALL CONTROL OF THE MAVEN PROJECT. HE WILL PROVIDE SCIENCE LEADERSHIP FOR THE MAVEN MISSION AND MANAGE EDUCATION AND PUBLIC OUTREACH. THIS EFFORT APPLIES TO LASP AND COVERS PHASES A, B, C, D, AND E OF THE MAVEN MISSION. UNDER PHASE A OF THIS CONTRACT, THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULE MANAGEMENT, PROVIDING TECHNICAL PROGRESS REPORTS, AND MISSION REVIEWS. UNDER PHASE B, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING REQUIREMENTS ANALYSIS, PROJECT PLANS, PRELIMINARY DESIGN REVIEWS, MONTHLY STATUS REVIEWS, QUARTERLY TEAM MEETINGS, E/PO ACTIVITIES, AND THE PRELIMINARY SCIENCE DATA MANAGEMENT PLAN. UNDER PHASES C AND D, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING MONTHLY STATUS REVIEWS, QUARTERLY TEAM REVIEWS, RESPONDING TO ACTION ITEMS THAT RESULT FROM MEETINGS/REVIEWS, SUPPORTING FORMAL REVIEWS AND LAUNCH SITE ACTIVITIES, AND MANAGEMENT OF E/PO ACTIVITIES. UNDER PHASE E, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING OVERALL MANAGEMENT OF THE MAVEN SCIENCE PROGRAM AND DATA ANALYSIS ACTIVITIES, ENSURING DELIVERY OF MAVEN SCIENCE DATA PRODUCTS, MISSION DOCUMENTATION, AND ANALYTICAL SOFTWARE TOOLS INTO PDS, PARTICIPATING IN ANALYSIS AND RESOLUTION OF SPACECRAFT ANOMALIES, AS NECESSARY, PROVIDING OVERALL MANAGEMENT OF E/PO ACTIVITIES PER E/PO PLAN, PRESENTING SCIENTIFIC RESULTS AT NATIONAL CONFERENCES AND IN SCIENTIFIC LITERATURE, AND PROVIDING CONTRACT CLOSEOUT SUPPORT. | $2.3M |
| Feb 19, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC23CA035 | 541715 | SUPPORT FOR THE SNOW AND ICE DISTRIBUTED ACTIVE ARCHIVE CENTER (DAAC) FOR THE EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM (EOSDIS) | $44K |
| Feb 12, 2026 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC026FA062 | 541715 | IN SPACE EXPANSION OF HEMATOPOIETIC STEM CELLS FOR CLINICAL APPLICATION, PHASE 1B | $750K |
| Feb 5, 2026 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC024F0071 | 541990 | EFFECT OF METABOLIC SUPPLEMENTS ON MUSCLE REGENERATION UNDER MICROGRAVITY | $20K |
Get Alerted Before The Regents Of The University Of Colorado's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free