Home/Contractors/The Regents Of The University Of Colorado/contracts

Federal Contractor Profile

The Regents Of The University Of Colorado

$768.2M obligated·381 awards·16 agencies·46 NAICS

Federal Contracts

Showing contracts 101150 of 922 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Mar 13, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC23CA062517810PROVIDE CONTINUED MISSION OPERATIONS AND DATA PROCESSING SUPPORT SERVICES TO CONTINUE PERFORMING KEY CLIMATE MEASUREMENTS THROUGH TOTAL AND SPECTRAL SOLAR IRRADIANCE SENSOR SYSTEMS CURRENTLY IN OPERATION ON THE INTERNATIONAL SPACE STATION.$253K
Mar 12, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0061541720GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.$350K
Mar 12, 2025Department of DefenseFA2394 USAF AFMC AFRL PZL AFRL RXKMFA239425CB003541715IN-SITU NON-DESTRUCTIVE INSPECTION USING HETEROGENOUS COLLABORATIVE ROBOTS$150K
Mar 10, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0061541720GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.$750K
Mar 10, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG07HW00C541330TAS::80 0120::TAS THIS CONTRACT IS FOR THE TASKS NECESSARY TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, EVALUATE AND SUPPORT LAUNCH OF THE EUVS XRS IRRADIANCE SENSORS (EXIS), SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE EXIS IS CLASSIFIED AS A NON-PRIMARY INSTRUMENT SUITE ON THE GOES-R SATELLITE AND HAS A RISK CLASSIFICATION OF B. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR 4 FLIGHT MODELS B) ONE EXIS FLIGHT MODEL (FM) C) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) D) TWO EXIS EMULATORS (EXISES) E) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) F) ONE GROUND PROCESSING DEVELOPMENT SYSTEM (GPDS) G) SPARES FOR THE FOUR FMS H) ALL ADDITIONAL EXIS MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT I) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT: A) OPTION 1 FOR AN ADDITIONAL FLIGHT MODEL (FM-2) B) OPTION 2 FOR AN ADDITIONAL FLIGHT MODEL (FM-3) C) OPTION 3FOR AN ADDITIONAL FLIGHT MODEL (FM-3)$75K
Mar 6, 2025National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC25F7026541715PROVIDE AN INTERNAL ABSOLUTE TIME SEQUENCE (ATS) SEPARATE FROM THE JOINT POLAR SATELLITE SYSTEM (JPSS) SATELLITE OPERATION COMMAND TABLE AND DELIVER A BINARY FILE IN THE LIBERA ABSOLUTE TIME SEQUENCE (ATS) FORMAT.$250K
Mar 5, 2025National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC20D0006541715LIBERA, EARTH VENTURE CONTINUITY 1 MISSION. PROVIDE AN INSTRUMENT TO BE INTEGRATED ON THE UPCOMING JOINT POLAR SATELLITE SYSTEM-3 SATELLITE THAT WILL MEASURE SHORT WAVE LONG WAVE AND TOTAL RADIATION AT TOP OF THE ATMOSPHERE$6.8M
Mar 4, 2025National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC25F7015541715ADDITIONAL SUPPORT AT THE PAYLOAD SYSTEM LEVEL ASSEMBLY, INTEGRATION, ALIGNMENT, TEST, CHARACTERIZATION, CALIBRATION, VERIFICATION, AND ENVIRONMENTAL QUALIFICATION FOR DELIVERY OF THE FULLY QUALIFIED LIBERA FLIGHT INSTRUMENT.$1.0M
Mar 3, 2025Department of DefenseW4LD USA HECSAW912HQ22C0042541715SERDP PROJECT MR22-3257$50K
Feb 28, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC23CA035541715SUPPORT FOR THE SNOW AND ICE DISTRIBUTED ACTIVE ARCHIVE CENTER (DAAC) FOR THE EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM (EOSDIS)$4.5M
Feb 26, 2025National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC024F0073541990BIOSERVE SUPPORT FOR BIONUTRIENTS-3 (BN-3)$10K
Feb 25, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA012541715INTERDISCIPLINARY SCIENTIST SUPPORT FOR THE GEOSPACE DYNAMICS CONSTELLATION (GDC) PROGRAM. THIS ACTION IS A RESULT OF THE UNIVERSITY'S SELECTION UNDER A NASA RESEARCH ANNOUNCEMENT (NRA NNH21ZDA001N GDCIDS).$200K
Feb 25, 2025National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC023F0069541990C. ELEGANS BIOLOGICAL INVESTIGATION ON MICROBIOME EFFECT IN SPACE$50K
Feb 24, 2025National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC024F0006541990ISS: THE EFFECTS OF AGE ON THE MECHANOCHEMICAL FEEDBACK LOOP FOR EXTRACELLULAR MATRIX PRODUCTION BY FIBROBLASTS IN THE CONTEXT OF WOUND HEALING$125K
Feb 21, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC23CA062517810PROVIDE CONTINUED MISSION OPERATIONS AND DATA PROCESSING SUPPORT SERVICES TO CONTINUE PERFORMING KEY CLIMATE MEASUREMENTS THROUGH TOTAL AND SPECTRAL SOLAR IRRADIANCE SENSOR SYSTEMS CURRENTLY IN OPERATION ON THE INTERNATIONAL SPACE STATION.$600K
Feb 19, 2025National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC022F0232541990MICORGRAVITY ANALOGS AS PROXIES FOR SPACEFLIGHT MISSION INTEGRATION AND OPERATIONS$42K
Feb 19, 2025National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC18C0001541715CLIMATE ABSOLUTE RADIANCE AND REFRACTIVITY OBSERVATORY PATHFINDER INSTRUMENT, PAYLOAD, AND MISSION OPERATIONS$2.2M
Feb 19, 2025Department of CommerceDEPT OF COMMERCE NOAA1305M325F0017541380ISOTOPE ANALYSIS TASK ORDER.$723K
Feb 17, 2025National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC024F0071541990EFFECT OF METABOLIC SUPPLEMENTS ON MUSCLE REGENERATION UNDER MICROGRAVITY$55K
Feb 14, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNH10CC04C541712NASA HEADQUARTERS (HQ) MANAGES THE MARS EXPLORATION PROGRAM (MEP), WHICH SELECTED THE MARS ATMOSPHERE AND VOLATILE EVOLUTION (MAVEN) PROJECT AS A MARS SCOUT MISSION. THE MAVEN PRINCIPAL INVESTIGATOR (PI) IS DR. BRUCE JAKOSKY, OF THE UNIVERSITY OF COLORADO, LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP) IN BOULDER, CO. THE PI WILL HAVE OVERALL CONTROL OF THE MAVEN PROJECT. HE WILL PROVIDE SCIENCE LEADERSHIP FOR THE MAVEN MISSION AND MANAGE EDUCATION AND PUBLIC OUTREACH. THIS EFFORT APPLIES TO LASP AND COVERS PHASES A, B, C, D, AND E OF THE MAVEN MISSION. UNDER PHASE A OF THIS CONTRACT, THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULE MANAGEMENT, PROVIDING TECHNICAL PROGRESS REPORTS, AND MISSION REVIEWS. UNDER PHASE B, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING REQUIREMENTS ANALYSIS, PROJECT PLANS, PRELIMINARY DESIGN REVIEWS, MONTHLY STATUS REVIEWS, QUARTERLY TEAM MEETINGS, E/PO ACTIVITIES, AND THE PRELIMINARY SCIENCE DATA MANAGEMENT PLAN. UNDER PHASES C AND D, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING MONTHLY STATUS REVIEWS, QUARTERLY TEAM REVIEWS, RESPONDING TO ACTION ITEMS THAT RESULT FROM MEETINGS/REVIEWS, SUPPORTING FORMAL REVIEWS AND LAUNCH SITE ACTIVITIES, AND MANAGEMENT OF E/PO ACTIVITIES. UNDER PHASE E, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING OVERALL MANAGEMENT OF THE MAVEN SCIENCE PROGRAM AND DATA ANALYSIS ACTIVITIES, ENSURING DELIVERY OF MAVEN SCIENCE DATA PRODUCTS, MISSION DOCUMENTATION, AND ANALYTICAL SOFTWARE TOOLS INTO PDS, PARTICIPATING IN ANALYSIS AND RESOLUTION OF SPACECRAFT ANOMALIES, AS NECESSARY, PROVIDING OVERALL MANAGEMENT OF E/PO ACTIVITIES PER E/PO PLAN, PRESENTING SCIENTIFIC RESULTS AT NATIONAL CONFERENCES AND IN SCIENTIFIC LITERATURE, AND PROVIDING CONTRACT CLOSEOUT SUPPORT.$1.5M
Feb 12, 2025National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC024F0071541990EFFECT OF METABOLIC SUPPLEMENTS ON MUSCLE REGENERATION UNDER MICROGRAVITY$150K
Feb 6, 2025National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC023F0069541990C. ELEGANS BIOLOGICAL INVESTIGATION ON MICROBIOME EFFECT IN SPACE$50K
Feb 6, 2025National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC023F0062541990ISS: ENGINEERING SCAFFOLD-FREE, BIOMIMETIC NEOCARTILAGE IN MICROGRAVITY TO GUIDE TERRESTRIAL TISSUE ENGINEERING STRATEGIES$32K
Jan 29, 2025National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC025F7032541990HUMAN INDUCED PLURIPOTENT STEM CELL-DERIVED CARDIOMYOCYTES (HIPSC-CMS) TERRESTRIALLY FABRICATED INTO PHYSIOLOGICALLY RELEVANT 3D ENGINEERED HEART TISSUES (EHTS) WILL BE STUDIED ABOARD THE INTERNATIONAL SPACE STATION (ISS).$225K
Jan 29, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNH10CC04C541712NASA HEADQUARTERS (HQ) MANAGES THE MARS EXPLORATION PROGRAM (MEP), WHICH SELECTED THE MARS ATMOSPHERE AND VOLATILE EVOLUTION (MAVEN) PROJECT AS A MARS SCOUT MISSION. THE MAVEN PRINCIPAL INVESTIGATOR (PI) IS DR. BRUCE JAKOSKY, OF THE UNIVERSITY OF COLORADO, LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP) IN BOULDER, CO. THE PI WILL HAVE OVERALL CONTROL OF THE MAVEN PROJECT. HE WILL PROVIDE SCIENCE LEADERSHIP FOR THE MAVEN MISSION AND MANAGE EDUCATION AND PUBLIC OUTREACH. THIS EFFORT APPLIES TO LASP AND COVERS PHASES A, B, C, D, AND E OF THE MAVEN MISSION. UNDER PHASE A OF THIS CONTRACT, THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULE MANAGEMENT, PROVIDING TECHNICAL PROGRESS REPORTS, AND MISSION REVIEWS. UNDER PHASE B, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING REQUIREMENTS ANALYSIS, PROJECT PLANS, PRELIMINARY DESIGN REVIEWS, MONTHLY STATUS REVIEWS, QUARTERLY TEAM MEETINGS, E/PO ACTIVITIES, AND THE PRELIMINARY SCIENCE DATA MANAGEMENT PLAN. UNDER PHASES C AND D, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING MONTHLY STATUS REVIEWS, QUARTERLY TEAM REVIEWS, RESPONDING TO ACTION ITEMS THAT RESULT FROM MEETINGS/REVIEWS, SUPPORTING FORMAL REVIEWS AND LAUNCH SITE ACTIVITIES, AND MANAGEMENT OF E/PO ACTIVITIES. UNDER PHASE E, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING OVERALL MANAGEMENT OF THE MAVEN SCIENCE PROGRAM AND DATA ANALYSIS ACTIVITIES, ENSURING DELIVERY OF MAVEN SCIENCE DATA PRODUCTS, MISSION DOCUMENTATION, AND ANALYTICAL SOFTWARE TOOLS INTO PDS, PARTICIPATING IN ANALYSIS AND RESOLUTION OF SPACECRAFT ANOMALIES, AS NECESSARY, PROVIDING OVERALL MANAGEMENT OF E/PO ACTIVITIES PER E/PO PLAN, PRESENTING SCIENTIFIC RESULTS AT NATIONAL CONFERENCES AND IN SCIENTIFIC LITERATURE, AND PROVIDING CONTRACT CLOSEOUT SUPPORT.$1.3M
Jan 27, 2025National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0264541990TO #6 IMPLEMENTATION OF THE AEROSOL CHARACTERIZATION PAYLOAD MINI INSTRUMENT AND SAMPLERS$41K
Jan 24, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0069336419PROVIDE ENGINEERING ANALYSES, HARDWARE & SOFTWARE DEVELOPMENT, FABRICATION, INTEGRATION, TEST, EVALUATION, INTEGRATION WITH SPACECRAFT, LAUNCH, INSTRUMENT ACTIVATION, CALIBRATION, VALIDATION, & OPERATIONS THROUGH 60-DAY CHECKOUT FOR TSIS2 PAYLOAD.$2.4M
Jan 22, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0069336419PROVIDE ENGINEERING ANALYSES, HARDWARE & SOFTWARE DEVELOPMENT, FABRICATION, INTEGRATION, TEST, EVALUATION, INTEGRATION WITH SPACECRAFT, LAUNCH, INSTRUMENT ACTIVATION, CALIBRATION, VALIDATION, & OPERATIONS THROUGH 60-DAY CHECKOUT FOR TSIS2 PAYLOAD.$500K
Dec 19, 2024National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC25F7015541715ADDITIONAL SUPPORT AT THE PAYLOAD SYSTEM LEVEL ASSEMBLY, INTEGRATION, ALIGNMENT, TEST, CHARACTERIZATION, CALIBRATION, VERIFICATION, AND ENVIRONMENTAL QUALIFICATION FOR DELIVERY OF THE FULLY QUALIFIED LIBERA FLIGHT INSTRUMENT.$500K
Dec 19, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC23CA062517810PROVIDE CONTINUED MISSION OPERATIONS AND DATA PROCESSING SUPPORT SERVICES TO CONTINUE PERFORMING KEY CLIMATE MEASUREMENTS THROUGH TOTAL AND SPECTRAL SOLAR IRRADIANCE SENSOR SYSTEMS CURRENTLY IN OPERATION ON THE INTERNATIONAL SPACE STATION.$580K
Dec 19, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0200210DNAS502140541710EXTREME ULTRAVIOLET VARIABILITY EXPERIMENT (EVE) FOR THE SOLAR DYNAMICS OBSERVATORY(SDO)$270K
Dec 13, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC23CA004336419PHASE A-B BRIDGE AETHER INSTRUMENT FOR THE GDC SPACECRAFT$985K
Dec 11, 2024National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC20D0006541715LIBERA, EARTH VENTURE CONTINUITY 1 MISSION. PROVIDE AN INSTRUMENT TO BE INTEGRATED ON THE UPCOMING JOINT POLAR SATELLITE SYSTEM-3 SATELLITE THAT WILL MEASURE SHORT WAVE LONG WAVE AND TOTAL RADIATION AT TOP OF THE ATMOSPHERE$4.5M
Dec 10, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNH10CC04C541712NASA HEADQUARTERS (HQ) MANAGES THE MARS EXPLORATION PROGRAM (MEP), WHICH SELECTED THE MARS ATMOSPHERE AND VOLATILE EVOLUTION (MAVEN) PROJECT AS A MARS SCOUT MISSION. THE MAVEN PRINCIPAL INVESTIGATOR (PI) IS DR. BRUCE JAKOSKY, OF THE UNIVERSITY OF COLORADO, LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP) IN BOULDER, CO. THE PI WILL HAVE OVERALL CONTROL OF THE MAVEN PROJECT. HE WILL PROVIDE SCIENCE LEADERSHIP FOR THE MAVEN MISSION AND MANAGE EDUCATION AND PUBLIC OUTREACH. THIS EFFORT APPLIES TO LASP AND COVERS PHASES A, B, C, D, AND E OF THE MAVEN MISSION. UNDER PHASE A OF THIS CONTRACT, THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULE MANAGEMENT, PROVIDING TECHNICAL PROGRESS REPORTS, AND MISSION REVIEWS. UNDER PHASE B, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING REQUIREMENTS ANALYSIS, PROJECT PLANS, PRELIMINARY DESIGN REVIEWS, MONTHLY STATUS REVIEWS, QUARTERLY TEAM MEETINGS, E/PO ACTIVITIES, AND THE PRELIMINARY SCIENCE DATA MANAGEMENT PLAN. UNDER PHASES C AND D, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING MONTHLY STATUS REVIEWS, QUARTERLY TEAM REVIEWS, RESPONDING TO ACTION ITEMS THAT RESULT FROM MEETINGS/REVIEWS, SUPPORTING FORMAL REVIEWS AND LAUNCH SITE ACTIVITIES, AND MANAGEMENT OF E/PO ACTIVITIES. UNDER PHASE E, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING OVERALL MANAGEMENT OF THE MAVEN SCIENCE PROGRAM AND DATA ANALYSIS ACTIVITIES, ENSURING DELIVERY OF MAVEN SCIENCE DATA PRODUCTS, MISSION DOCUMENTATION, AND ANALYTICAL SOFTWARE TOOLS INTO PDS, PARTICIPATING IN ANALYSIS AND RESOLUTION OF SPACECRAFT ANOMALIES, AS NECESSARY, PROVIDING OVERALL MANAGEMENT OF E/PO ACTIVITIES PER E/PO PLAN, PRESENTING SCIENTIFIC RESULTS AT NATIONAL CONFERENCES AND IN SCIENTIFIC LITERATURE, AND PROVIDING CONTRACT CLOSEOUT SUPPORT.$1.8M
Dec 2, 2024National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC25F7012541715CONDUCT A PURGED BAKEOUT CONTAMINATION CONTROL STUDY THAT CONTRIBUTES SPECIFIC, DATA-BACKED CONCLUSIONS AND RECOMMENDATIONS TO THE SPACEFLIGHT CONTAMINATION CONTROL COMMUNITY REGARDING THE METHODS, EQUIPMENT, AND PROCESS FOR PURGED BAKEOUT.$504K
Nov 18, 2024Department of DefenseW4LD USA HECSAW912HQ22C0042541715SERDP PROJECT MR22-3257$48K
Nov 18, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC19C0069336419PROVIDE ENGINEERING ANALYSES, HARDWARE & SOFTWARE DEVELOPMENT, FABRICATION, INTEGRATION, TEST, EVALUATION, INTEGRATION WITH SPACECRAFT, LAUNCH, INSTRUMENT ACTIVATION, CALIBRATION, VALIDATION, & OPERATIONS THROUGH 60-DAY CHECKOUT FOR TSIS2 PAYLOAD.$673K
Nov 6, 2024National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC25F7010541715CONDUCT 3 TOTAL DRESS REHEARSALS TO MITIGATE RISK ASSOCIATED WITH EXTENDED STORAGE PERIOD.$264K
Oct 3, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA012541715INTERDISCIPLINARY SCIENTIST SUPPORT FOR THE GEOSPACE DYNAMICS CONSTELLATION (GDC) PROGRAM. THIS ACTION IS A RESULT OF THE UNIVERSITY'S SELECTION UNDER A NASA RESEARCH ANNOUNCEMENT (NRA NNH21ZDA001N GDCIDS).$51K
Sep 30, 2024National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC22CA001541715CALIBRATION OF THE LUNAR SPECTRAL REFLECTION FROM SPACE OF THE ARCTONE INSTRUMENT TO INCLUDE FUNCTIONS SUCH AS: CHARACTERIZATION OF THE ARCTONE INSTRUMENT DESIGN, FABRICATE AND TEST ITS FLIGHT CALIBRATION SYSTEM PARTICIPATE IN PAYLOAD ACTIVITIES$56K
Sep 29, 2024Department of EnergyFEDERAL ENERGY REGULATORY COMM89603022P0030511210RIVERWARE LICENSES$11K
Sep 27, 2024Department of DefenseW4LD USA HECSAW912HQ24P0066541620IWR - RISK COMMUNICATION PRACTITIONER TRAINING. ALIGN SOCIAL SCIENCE RESEARCH WITH PRACTICE OF MANAGING FLOOD AND OTHER NATURAL HAZARD RISKS. RESEARCH, COACHING AND TRAINING TO SUPPORT NATIONAL FLOOD RISK MANAGEMENT PROGRAM AND OTHER USACE PERSONNEL.$150K
Sep 26, 2024Department of JusticeFBI-JEH15F06724P0001335541715QIS WORKFORCE DEVELOPMENT DOUBLE-SLIT DEMONSTRATION DEVICE$200K
Sep 26, 2024Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH NICHD75N94023F0000154171475N94020D00019 - 75N94023F00001 - OVAPRENE PHASE I: PROTOCOL FINALIZATION, REGULATORY APPROVAL, START-UP, AND COMMENCEMENT OF RECRUITMENT, SCREENING AND ENROLLMENT FOR THE OVAPRENE VAGINAL DEVICE CLINICAL TRIAL.$117K
Sep 23, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0200210DNAS502140541710EXTREME ULTRAVIOLET VARIABILITY EXPERIMENT (EVE) FOR THE SOLAR DYNAMICS OBSERVATORY(SDO)$500K
Sep 19, 2024Department of the InteriorDENVER FED CENTER140R8124P0079541990TSC NAVAJO-GALLUP BLENDING STUDY$43K
Sep 17, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC23CA062517810PROVIDE CONTINUED MISSION OPERATIONS AND DATA PROCESSING SUPPORT SERVICES TO CONTINUE PERFORMING KEY CLIMATE MEASUREMENTS THROUGH TOTAL AND SPECTRAL SOLAR IRRADIANCE SENSOR SYSTEMS CURRENTLY IN OPERATION ON THE INTERNATIONAL SPACE STATION.$95K
Sep 16, 2024National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC22CA001541715CALIBRATION OF THE LUNAR SPECTRAL REFLECTION FROM SPACE OF THE ARCTONE INSTRUMENT TO INCLUDE FUNCTIONS SUCH AS: CHARACTERIZATION OF THE ARCTONE INSTRUMENT DESIGN, FABRICATE AND TEST ITS FLIGHT CALIBRATION SYSTEM PARTICIPATE IN PAYLOAD ACTIVITIES$68K
Sep 13, 2024National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC022F0146541990PRODUCTION OF LARGE POPULATIONS OF HEMATOPOIETIC STEM CELLS (HSCS) IN MICROGRAVITY TO TREAT SERIOUS MEDICAL CONDITIONS INCLUDING BLOOD CANCERS (LEUKEMIAS, LYMPHOMAS, MULTIPLE MYELOMA), FATAL BLOOD DISORDERS, AND SEVERE IMMUNE DISEASES.$285K
Sep 13, 2024National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC18C0001541715CLIMATE ABSOLUTE RADIANCE AND REFRACTIVITY OBSERVATORY PATHFINDER INSTRUMENT, PAYLOAD, AND MISSION OPERATIONS$2.4M

Get Alerted Before The Regents Of The University Of Colorado's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free