Federal Contractor Profile
The Regents Of The University Of Colorado
$768.2M obligated·381 awards·16 agencies·46 NAICS
Federal Contracts
Showing contracts 101–150 of 922 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Mar 13, 2025 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC23CA062 | 517810 | PROVIDE CONTINUED MISSION OPERATIONS AND DATA PROCESSING SUPPORT SERVICES TO CONTINUE PERFORMING KEY CLIMATE MEASUREMENTS THROUGH TOTAL AND SPECTRAL SOLAR IRRADIANCE SENSOR SYSTEMS CURRENTLY IN OPERATION ON THE INTERNATIONAL SPACE STATION. | $253K |
| Mar 12, 2025 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0061 | 541720 | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. | $350K |
| Mar 12, 2025 | Department of DefenseFA2394 USAF AFMC AFRL PZL AFRL RXKM | FA239425CB003 | 541715 | IN-SITU NON-DESTRUCTIVE INSPECTION USING HETEROGENOUS COLLABORATIVE ROBOTS | $150K |
| Mar 10, 2025 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0061 | 541720 | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. | $750K |
| Mar 10, 2025 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG07HW00C | 541330 | TAS::80 0120::TAS THIS CONTRACT IS FOR THE TASKS NECESSARY TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, EVALUATE AND SUPPORT LAUNCH OF THE EUVS XRS IRRADIANCE SENSORS (EXIS), SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE EXIS IS CLASSIFIED AS A NON-PRIMARY INSTRUMENT SUITE ON THE GOES-R SATELLITE AND HAS A RISK CLASSIFICATION OF B. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR 4 FLIGHT MODELS B) ONE EXIS FLIGHT MODEL (FM) C) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) D) TWO EXIS EMULATORS (EXISES) E) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) F) ONE GROUND PROCESSING DEVELOPMENT SYSTEM (GPDS) G) SPARES FOR THE FOUR FMS H) ALL ADDITIONAL EXIS MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT I) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT: A) OPTION 1 FOR AN ADDITIONAL FLIGHT MODEL (FM-2) B) OPTION 2 FOR AN ADDITIONAL FLIGHT MODEL (FM-3) C) OPTION 3FOR AN ADDITIONAL FLIGHT MODEL (FM-3) | $75K |
| Mar 6, 2025 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC25F7026 | 541715 | PROVIDE AN INTERNAL ABSOLUTE TIME SEQUENCE (ATS) SEPARATE FROM THE JOINT POLAR SATELLITE SYSTEM (JPSS) SATELLITE OPERATION COMMAND TABLE AND DELIVER A BINARY FILE IN THE LIBERA ABSOLUTE TIME SEQUENCE (ATS) FORMAT. | $250K |
| Mar 5, 2025 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC20D0006 | 541715 | LIBERA, EARTH VENTURE CONTINUITY 1 MISSION. PROVIDE AN INSTRUMENT TO BE INTEGRATED ON THE UPCOMING JOINT POLAR SATELLITE SYSTEM-3 SATELLITE THAT WILL MEASURE SHORT WAVE LONG WAVE AND TOTAL RADIATION AT TOP OF THE ATMOSPHERE | $6.8M |
| Mar 4, 2025 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC25F7015 | 541715 | ADDITIONAL SUPPORT AT THE PAYLOAD SYSTEM LEVEL ASSEMBLY, INTEGRATION, ALIGNMENT, TEST, CHARACTERIZATION, CALIBRATION, VERIFICATION, AND ENVIRONMENTAL QUALIFICATION FOR DELIVERY OF THE FULLY QUALIFIED LIBERA FLIGHT INSTRUMENT. | $1.0M |
| Mar 3, 2025 | Department of DefenseW4LD USA HECSA | W912HQ22C0042 | 541715 | SERDP PROJECT MR22-3257 | $50K |
| Feb 28, 2025 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC23CA035 | 541715 | SUPPORT FOR THE SNOW AND ICE DISTRIBUTED ACTIVE ARCHIVE CENTER (DAAC) FOR THE EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM (EOSDIS) | $4.5M |
| Feb 26, 2025 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC024F0073 | 541990 | BIOSERVE SUPPORT FOR BIONUTRIENTS-3 (BN-3) | $10K |
| Feb 25, 2025 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC22CA012 | 541715 | INTERDISCIPLINARY SCIENTIST SUPPORT FOR THE GEOSPACE DYNAMICS CONSTELLATION (GDC) PROGRAM. THIS ACTION IS A RESULT OF THE UNIVERSITY'S SELECTION UNDER A NASA RESEARCH ANNOUNCEMENT (NRA NNH21ZDA001N GDCIDS). | $200K |
| Feb 25, 2025 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC023F0069 | 541990 | C. ELEGANS BIOLOGICAL INVESTIGATION ON MICROBIOME EFFECT IN SPACE | $50K |
| Feb 24, 2025 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC024F0006 | 541990 | ISS: THE EFFECTS OF AGE ON THE MECHANOCHEMICAL FEEDBACK LOOP FOR EXTRACELLULAR MATRIX PRODUCTION BY FIBROBLASTS IN THE CONTEXT OF WOUND HEALING | $125K |
| Feb 21, 2025 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC23CA062 | 517810 | PROVIDE CONTINUED MISSION OPERATIONS AND DATA PROCESSING SUPPORT SERVICES TO CONTINUE PERFORMING KEY CLIMATE MEASUREMENTS THROUGH TOTAL AND SPECTRAL SOLAR IRRADIANCE SENSOR SYSTEMS CURRENTLY IN OPERATION ON THE INTERNATIONAL SPACE STATION. | $600K |
| Feb 19, 2025 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0232 | 541990 | MICORGRAVITY ANALOGS AS PROXIES FOR SPACEFLIGHT MISSION INTEGRATION AND OPERATIONS | $42K |
| Feb 19, 2025 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC18C0001 | 541715 | CLIMATE ABSOLUTE RADIANCE AND REFRACTIVITY OBSERVATORY PATHFINDER INSTRUMENT, PAYLOAD, AND MISSION OPERATIONS | $2.2M |
| Feb 19, 2025 | Department of CommerceDEPT OF COMMERCE NOAA | 1305M325F0017 | 541380 | ISOTOPE ANALYSIS TASK ORDER. | $723K |
| Feb 17, 2025 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC024F0071 | 541990 | EFFECT OF METABOLIC SUPPLEMENTS ON MUSCLE REGENERATION UNDER MICROGRAVITY | $55K |
| Feb 14, 2025 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNH10CC04C | 541712 | NASA HEADQUARTERS (HQ) MANAGES THE MARS EXPLORATION PROGRAM (MEP), WHICH SELECTED THE MARS ATMOSPHERE AND VOLATILE EVOLUTION (MAVEN) PROJECT AS A MARS SCOUT MISSION. THE MAVEN PRINCIPAL INVESTIGATOR (PI) IS DR. BRUCE JAKOSKY, OF THE UNIVERSITY OF COLORADO, LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP) IN BOULDER, CO. THE PI WILL HAVE OVERALL CONTROL OF THE MAVEN PROJECT. HE WILL PROVIDE SCIENCE LEADERSHIP FOR THE MAVEN MISSION AND MANAGE EDUCATION AND PUBLIC OUTREACH. THIS EFFORT APPLIES TO LASP AND COVERS PHASES A, B, C, D, AND E OF THE MAVEN MISSION. UNDER PHASE A OF THIS CONTRACT, THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULE MANAGEMENT, PROVIDING TECHNICAL PROGRESS REPORTS, AND MISSION REVIEWS. UNDER PHASE B, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING REQUIREMENTS ANALYSIS, PROJECT PLANS, PRELIMINARY DESIGN REVIEWS, MONTHLY STATUS REVIEWS, QUARTERLY TEAM MEETINGS, E/PO ACTIVITIES, AND THE PRELIMINARY SCIENCE DATA MANAGEMENT PLAN. UNDER PHASES C AND D, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING MONTHLY STATUS REVIEWS, QUARTERLY TEAM REVIEWS, RESPONDING TO ACTION ITEMS THAT RESULT FROM MEETINGS/REVIEWS, SUPPORTING FORMAL REVIEWS AND LAUNCH SITE ACTIVITIES, AND MANAGEMENT OF E/PO ACTIVITIES. UNDER PHASE E, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING OVERALL MANAGEMENT OF THE MAVEN SCIENCE PROGRAM AND DATA ANALYSIS ACTIVITIES, ENSURING DELIVERY OF MAVEN SCIENCE DATA PRODUCTS, MISSION DOCUMENTATION, AND ANALYTICAL SOFTWARE TOOLS INTO PDS, PARTICIPATING IN ANALYSIS AND RESOLUTION OF SPACECRAFT ANOMALIES, AS NECESSARY, PROVIDING OVERALL MANAGEMENT OF E/PO ACTIVITIES PER E/PO PLAN, PRESENTING SCIENTIFIC RESULTS AT NATIONAL CONFERENCES AND IN SCIENTIFIC LITERATURE, AND PROVIDING CONTRACT CLOSEOUT SUPPORT. | $1.5M |
| Feb 12, 2025 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC024F0071 | 541990 | EFFECT OF METABOLIC SUPPLEMENTS ON MUSCLE REGENERATION UNDER MICROGRAVITY | $150K |
| Feb 6, 2025 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC023F0069 | 541990 | C. ELEGANS BIOLOGICAL INVESTIGATION ON MICROBIOME EFFECT IN SPACE | $50K |
| Feb 6, 2025 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC023F0062 | 541990 | ISS: ENGINEERING SCAFFOLD-FREE, BIOMIMETIC NEOCARTILAGE IN MICROGRAVITY TO GUIDE TERRESTRIAL TISSUE ENGINEERING STRATEGIES | $32K |
| Jan 29, 2025 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC025F7032 | 541990 | HUMAN INDUCED PLURIPOTENT STEM CELL-DERIVED CARDIOMYOCYTES (HIPSC-CMS) TERRESTRIALLY FABRICATED INTO PHYSIOLOGICALLY RELEVANT 3D ENGINEERED HEART TISSUES (EHTS) WILL BE STUDIED ABOARD THE INTERNATIONAL SPACE STATION (ISS). | $225K |
| Jan 29, 2025 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNH10CC04C | 541712 | NASA HEADQUARTERS (HQ) MANAGES THE MARS EXPLORATION PROGRAM (MEP), WHICH SELECTED THE MARS ATMOSPHERE AND VOLATILE EVOLUTION (MAVEN) PROJECT AS A MARS SCOUT MISSION. THE MAVEN PRINCIPAL INVESTIGATOR (PI) IS DR. BRUCE JAKOSKY, OF THE UNIVERSITY OF COLORADO, LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP) IN BOULDER, CO. THE PI WILL HAVE OVERALL CONTROL OF THE MAVEN PROJECT. HE WILL PROVIDE SCIENCE LEADERSHIP FOR THE MAVEN MISSION AND MANAGE EDUCATION AND PUBLIC OUTREACH. THIS EFFORT APPLIES TO LASP AND COVERS PHASES A, B, C, D, AND E OF THE MAVEN MISSION. UNDER PHASE A OF THIS CONTRACT, THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULE MANAGEMENT, PROVIDING TECHNICAL PROGRESS REPORTS, AND MISSION REVIEWS. UNDER PHASE B, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING REQUIREMENTS ANALYSIS, PROJECT PLANS, PRELIMINARY DESIGN REVIEWS, MONTHLY STATUS REVIEWS, QUARTERLY TEAM MEETINGS, E/PO ACTIVITIES, AND THE PRELIMINARY SCIENCE DATA MANAGEMENT PLAN. UNDER PHASES C AND D, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING MONTHLY STATUS REVIEWS, QUARTERLY TEAM REVIEWS, RESPONDING TO ACTION ITEMS THAT RESULT FROM MEETINGS/REVIEWS, SUPPORTING FORMAL REVIEWS AND LAUNCH SITE ACTIVITIES, AND MANAGEMENT OF E/PO ACTIVITIES. UNDER PHASE E, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING OVERALL MANAGEMENT OF THE MAVEN SCIENCE PROGRAM AND DATA ANALYSIS ACTIVITIES, ENSURING DELIVERY OF MAVEN SCIENCE DATA PRODUCTS, MISSION DOCUMENTATION, AND ANALYTICAL SOFTWARE TOOLS INTO PDS, PARTICIPATING IN ANALYSIS AND RESOLUTION OF SPACECRAFT ANOMALIES, AS NECESSARY, PROVIDING OVERALL MANAGEMENT OF E/PO ACTIVITIES PER E/PO PLAN, PRESENTING SCIENTIFIC RESULTS AT NATIONAL CONFERENCES AND IN SCIENTIFIC LITERATURE, AND PROVIDING CONTRACT CLOSEOUT SUPPORT. | $1.3M |
| Jan 27, 2025 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC020F0264 | 541990 | TO #6 IMPLEMENTATION OF THE AEROSOL CHARACTERIZATION PAYLOAD MINI INSTRUMENT AND SAMPLERS | $41K |
| Jan 24, 2025 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC19C0069 | 336419 | PROVIDE ENGINEERING ANALYSES, HARDWARE & SOFTWARE DEVELOPMENT, FABRICATION, INTEGRATION, TEST, EVALUATION, INTEGRATION WITH SPACECRAFT, LAUNCH, INSTRUMENT ACTIVATION, CALIBRATION, VALIDATION, & OPERATIONS THROUGH 60-DAY CHECKOUT FOR TSIS2 PAYLOAD. | $2.4M |
| Jan 22, 2025 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC19C0069 | 336419 | PROVIDE ENGINEERING ANALYSES, HARDWARE & SOFTWARE DEVELOPMENT, FABRICATION, INTEGRATION, TEST, EVALUATION, INTEGRATION WITH SPACECRAFT, LAUNCH, INSTRUMENT ACTIVATION, CALIBRATION, VALIDATION, & OPERATIONS THROUGH 60-DAY CHECKOUT FOR TSIS2 PAYLOAD. | $500K |
| Dec 19, 2024 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC25F7015 | 541715 | ADDITIONAL SUPPORT AT THE PAYLOAD SYSTEM LEVEL ASSEMBLY, INTEGRATION, ALIGNMENT, TEST, CHARACTERIZATION, CALIBRATION, VERIFICATION, AND ENVIRONMENTAL QUALIFICATION FOR DELIVERY OF THE FULLY QUALIFIED LIBERA FLIGHT INSTRUMENT. | $500K |
| Dec 19, 2024 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC23CA062 | 517810 | PROVIDE CONTINUED MISSION OPERATIONS AND DATA PROCESSING SUPPORT SERVICES TO CONTINUE PERFORMING KEY CLIMATE MEASUREMENTS THROUGH TOTAL AND SPECTRAL SOLAR IRRADIANCE SENSOR SYSTEMS CURRENTLY IN OPERATION ON THE INTERNATIONAL SPACE STATION. | $580K |
| Dec 19, 2024 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | GSFC0200210DNAS502140 | 541710 | EXTREME ULTRAVIOLET VARIABILITY EXPERIMENT (EVE) FOR THE SOLAR DYNAMICS OBSERVATORY(SDO) | $270K |
| Dec 13, 2024 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC23CA004 | 336419 | PHASE A-B BRIDGE AETHER INSTRUMENT FOR THE GDC SPACECRAFT | $985K |
| Dec 11, 2024 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC20D0006 | 541715 | LIBERA, EARTH VENTURE CONTINUITY 1 MISSION. PROVIDE AN INSTRUMENT TO BE INTEGRATED ON THE UPCOMING JOINT POLAR SATELLITE SYSTEM-3 SATELLITE THAT WILL MEASURE SHORT WAVE LONG WAVE AND TOTAL RADIATION AT TOP OF THE ATMOSPHERE | $4.5M |
| Dec 10, 2024 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNH10CC04C | 541712 | NASA HEADQUARTERS (HQ) MANAGES THE MARS EXPLORATION PROGRAM (MEP), WHICH SELECTED THE MARS ATMOSPHERE AND VOLATILE EVOLUTION (MAVEN) PROJECT AS A MARS SCOUT MISSION. THE MAVEN PRINCIPAL INVESTIGATOR (PI) IS DR. BRUCE JAKOSKY, OF THE UNIVERSITY OF COLORADO, LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP) IN BOULDER, CO. THE PI WILL HAVE OVERALL CONTROL OF THE MAVEN PROJECT. HE WILL PROVIDE SCIENCE LEADERSHIP FOR THE MAVEN MISSION AND MANAGE EDUCATION AND PUBLIC OUTREACH. THIS EFFORT APPLIES TO LASP AND COVERS PHASES A, B, C, D, AND E OF THE MAVEN MISSION. UNDER PHASE A OF THIS CONTRACT, THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULE MANAGEMENT, PROVIDING TECHNICAL PROGRESS REPORTS, AND MISSION REVIEWS. UNDER PHASE B, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING REQUIREMENTS ANALYSIS, PROJECT PLANS, PRELIMINARY DESIGN REVIEWS, MONTHLY STATUS REVIEWS, QUARTERLY TEAM MEETINGS, E/PO ACTIVITIES, AND THE PRELIMINARY SCIENCE DATA MANAGEMENT PLAN. UNDER PHASES C AND D, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING MONTHLY STATUS REVIEWS, QUARTERLY TEAM REVIEWS, RESPONDING TO ACTION ITEMS THAT RESULT FROM MEETINGS/REVIEWS, SUPPORTING FORMAL REVIEWS AND LAUNCH SITE ACTIVITIES, AND MANAGEMENT OF E/PO ACTIVITIES. UNDER PHASE E, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING OVERALL MANAGEMENT OF THE MAVEN SCIENCE PROGRAM AND DATA ANALYSIS ACTIVITIES, ENSURING DELIVERY OF MAVEN SCIENCE DATA PRODUCTS, MISSION DOCUMENTATION, AND ANALYTICAL SOFTWARE TOOLS INTO PDS, PARTICIPATING IN ANALYSIS AND RESOLUTION OF SPACECRAFT ANOMALIES, AS NECESSARY, PROVIDING OVERALL MANAGEMENT OF E/PO ACTIVITIES PER E/PO PLAN, PRESENTING SCIENTIFIC RESULTS AT NATIONAL CONFERENCES AND IN SCIENTIFIC LITERATURE, AND PROVIDING CONTRACT CLOSEOUT SUPPORT. | $1.8M |
| Dec 2, 2024 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC25F7012 | 541715 | CONDUCT A PURGED BAKEOUT CONTAMINATION CONTROL STUDY THAT CONTRIBUTES SPECIFIC, DATA-BACKED CONCLUSIONS AND RECOMMENDATIONS TO THE SPACEFLIGHT CONTAMINATION CONTROL COMMUNITY REGARDING THE METHODS, EQUIPMENT, AND PROCESS FOR PURGED BAKEOUT. | $504K |
| Nov 18, 2024 | Department of DefenseW4LD USA HECSA | W912HQ22C0042 | 541715 | SERDP PROJECT MR22-3257 | $48K |
| Nov 18, 2024 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC19C0069 | 336419 | PROVIDE ENGINEERING ANALYSES, HARDWARE & SOFTWARE DEVELOPMENT, FABRICATION, INTEGRATION, TEST, EVALUATION, INTEGRATION WITH SPACECRAFT, LAUNCH, INSTRUMENT ACTIVATION, CALIBRATION, VALIDATION, & OPERATIONS THROUGH 60-DAY CHECKOUT FOR TSIS2 PAYLOAD. | $673K |
| Nov 6, 2024 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC25F7010 | 541715 | CONDUCT 3 TOTAL DRESS REHEARSALS TO MITIGATE RISK ASSOCIATED WITH EXTENDED STORAGE PERIOD. | $264K |
| Oct 3, 2024 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC22CA012 | 541715 | INTERDISCIPLINARY SCIENTIST SUPPORT FOR THE GEOSPACE DYNAMICS CONSTELLATION (GDC) PROGRAM. THIS ACTION IS A RESULT OF THE UNIVERSITY'S SELECTION UNDER A NASA RESEARCH ANNOUNCEMENT (NRA NNH21ZDA001N GDCIDS). | $51K |
| Sep 30, 2024 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC22CA001 | 541715 | CALIBRATION OF THE LUNAR SPECTRAL REFLECTION FROM SPACE OF THE ARCTONE INSTRUMENT TO INCLUDE FUNCTIONS SUCH AS: CHARACTERIZATION OF THE ARCTONE INSTRUMENT DESIGN, FABRICATE AND TEST ITS FLIGHT CALIBRATION SYSTEM PARTICIPATE IN PAYLOAD ACTIVITIES | $56K |
| Sep 29, 2024 | Department of EnergyFEDERAL ENERGY REGULATORY COMM | 89603022P0030 | 511210 | RIVERWARE LICENSES | $11K |
| Sep 27, 2024 | Department of DefenseW4LD USA HECSA | W912HQ24P0066 | 541620 | IWR - RISK COMMUNICATION PRACTITIONER TRAINING. ALIGN SOCIAL SCIENCE RESEARCH WITH PRACTICE OF MANAGING FLOOD AND OTHER NATURAL HAZARD RISKS. RESEARCH, COACHING AND TRAINING TO SUPPORT NATIONAL FLOOD RISK MANAGEMENT PROGRAM AND OTHER USACE PERSONNEL. | $150K |
| Sep 26, 2024 | Department of JusticeFBI-JEH | 15F06724P0001335 | 541715 | QIS WORKFORCE DEVELOPMENT DOUBLE-SLIT DEMONSTRATION DEVICE | $200K |
| Sep 26, 2024 | Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH NICHD | 75N94023F00001 | 541714 | 75N94020D00019 - 75N94023F00001 - OVAPRENE PHASE I: PROTOCOL FINALIZATION, REGULATORY APPROVAL, START-UP, AND COMMENCEMENT OF RECRUITMENT, SCREENING AND ENROLLMENT FOR THE OVAPRENE VAGINAL DEVICE CLINICAL TRIAL. | $117K |
| Sep 23, 2024 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | GSFC0200210DNAS502140 | 541710 | EXTREME ULTRAVIOLET VARIABILITY EXPERIMENT (EVE) FOR THE SOLAR DYNAMICS OBSERVATORY(SDO) | $500K |
| Sep 19, 2024 | Department of the InteriorDENVER FED CENTER | 140R8124P0079 | 541990 | TSC NAVAJO-GALLUP BLENDING STUDY | $43K |
| Sep 17, 2024 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC23CA062 | 517810 | PROVIDE CONTINUED MISSION OPERATIONS AND DATA PROCESSING SUPPORT SERVICES TO CONTINUE PERFORMING KEY CLIMATE MEASUREMENTS THROUGH TOTAL AND SPECTRAL SOLAR IRRADIANCE SENSOR SYSTEMS CURRENTLY IN OPERATION ON THE INTERNATIONAL SPACE STATION. | $95K |
| Sep 16, 2024 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC22CA001 | 541715 | CALIBRATION OF THE LUNAR SPECTRAL REFLECTION FROM SPACE OF THE ARCTONE INSTRUMENT TO INCLUDE FUNCTIONS SUCH AS: CHARACTERIZATION OF THE ARCTONE INSTRUMENT DESIGN, FABRICATE AND TEST ITS FLIGHT CALIBRATION SYSTEM PARTICIPATE IN PAYLOAD ACTIVITIES | $68K |
| Sep 13, 2024 | National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER | 80JSC022F0146 | 541990 | PRODUCTION OF LARGE POPULATIONS OF HEMATOPOIETIC STEM CELLS (HSCS) IN MICROGRAVITY TO TREAT SERIOUS MEDICAL CONDITIONS INCLUDING BLOOD CANCERS (LEUKEMIAS, LYMPHOMAS, MULTIPLE MYELOMA), FATAL BLOOD DISORDERS, AND SEVERE IMMUNE DISEASES. | $285K |
| Sep 13, 2024 | National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER | 80LARC18C0001 | 541715 | CLIMATE ABSOLUTE RADIANCE AND REFRACTIVITY OBSERVATORY PATHFINDER INSTRUMENT, PAYLOAD, AND MISSION OPERATIONS | $2.4M |
Get Alerted Before The Regents Of The University Of Colorado's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free