Skip to content

Federal Contractor Profile

Transportation Technology Center, INC.

$87M obligated·250 awards·5 agencies·15 NAICS

Federal Contracts

Showing award actions 51–100 of 290 funded award actions, most recent first.

Contracts with positive obligations
250
Funded award actions shown
290
Obligations shown
$87M
Awarding agencies
5

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of September 28, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Nov 5, 2020Department of EnergyIDAHO OPERATIONS OFFICE89243218CNE000004541715ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF$182K
Sep 23, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000078541712THIS IS FOR PERSONNEL AND MATERIAL SUPPORT ACTIVITIES NECESSARY TO SUPPORT THE FRA TECHNICAL TRAINING STANDARDS DIVISION (TTSD) AT THE TRANSPORTATION TECHNOLOGY CENTER (TTC) IN PUEBLO, CO. UNDER THIS TASK ORDER (TO), THE CONTRACTOR WILL PROVIDE LABOR$159K
Sep 22, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000023541712NEW TASK ORDER FOR PROCUREMENT AND TESTING OF PTL EOT SEGMENT$881K
Sep 22, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000049541712QUANTIFICATION AND EVALUATION OF RAIL FLAW INSPECTION PRACTICES AND MODERN RAIL STEEL DEFECT GROWTH ANALYSIS THIS TASK ORDER SHALL BE PERFORMED ON A COST-PLUS-FIXED-FEE (CPFF) BASIS IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK, DATED 05/06/20$230K
Sep 21, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ618F000067541712TO EVALUATE RELIABILITY OF RAILROAD TANK CAR NONDESTRUCTIVE EVALUATION (NDE) METHODS USING THE PROBABILITY OF DETECTION (POD) APPROACH.$240K
Sep 16, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ618F000143541712IGF::OT::IGF - TRACK GEOMETRY MEASUREMENT SYSTEM EVALUATION; DESIGN AND BUILD A TEST TRACK SECTION WITH PRECISELY ADJUSTABLE TRACK GEOMETRY VARIATIONS.$1.5M
Sep 11, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000046541712ORGANIZE SEMINAR FOR INDUSTRY AND RESEARCH COMMITTEE TO MOVE THE SCIENCE FORWARD FOR CWR FORCE MANAGEMENT IN A COORDINATED FASHION$280K
Sep 11, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000082541712THE CONTRACTOR WILL DOCUMENT FREIGHT CAR TRUCK WARP RESTRAINT PERFORMANCE REQUIREMENTS, LOAD ENVIRONMENT, FAILURE MODES, AND OTHER TRUCK OPERATIONAL DEFICIENCIES (THIS WOULD INCLUDE ISSUES SUCH AS EXCESSIVE WEIGHT, INTERFERENCE WITH OTHER COMPONENTS$237K
Sep 9, 2020Department of EnergyIDAHO OPERATIONS OFFICE89243218CNE000004541715ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF$208K
Sep 2, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN0051541712IGF::OT::IGF FRA TTC ON-SITE TESTING SUPPORT$50K
Aug 27, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000073541712NEW TASK ORDER FOR CONCEPT OF OPERATIONS, REQUIREMENTS, AND HAZARD ANALYSIS DEVELOPMENT FOR A ROAD REMOTE CONTROL LOCOMOTIVE SYSTEM TO SUPPORT AUTOMATED TRAIN OPERATION.$972K
Aug 26, 2020Department of Homeland SecurityMISSION ESSENTIALS70T05019C9NSTR005561210TTCI TO PROVIDE FACILITY OPERATION SUPPORT SERVICES WHICH INCLUDES PROVIDING UTILITIES, JANITORIAL SERVICES, TRASH AND O&M SERVICES NECESSARY FOR THE SAFE AND EFFICIENT OPERATIONS OF THE SURFACE TRANSPORTATION SECURITY READINESS FACILITY (STSRF).$116K
Aug 25, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000072541712THE OBJECTIVE OF THIS EXISTING TASK IS TO CONTINUE THE REFURBISHMENT OF TRACK COMPONENTS AROUND TTC TO RESTORE THEM IN A GOOD OPERABLE CONDITION TO SUPPORT ON TRACK TESTING. THIS TASK IS UNDER TO: 18F000112 AS FUNDING BECOMES AVAILABLE.$360K
Aug 23, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000071541712NEW TASK ORDER FOR DEVELOPMENT AND TESTING OF A SENSOR PLATFORM TO SUPPORT AUTOMATED TRAIN OPERATION.$855K
Jul 28, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000040541712ACQUIRE TWO TANK CARS AND CONDUCT TWO FULL SCALE SIDE IMPACT TESTS. THE IMPACT TESTS WILL BE CONDUCTED IN ACCORDANCE WITH THE APPROPRIATE TEST PLAN AND ARE BASED UPON PREVIOUS FRA SIDE IMPACT TESTS$2.5M
Jul 22, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000017541712EVALUATE NEW AND INNOVATIVE IDEAS AND TECHNOLOGIES AT TTC AND IN REVENUE SERVICE TO MITIGATE THE ADVERSE EFFECTS HAL OPERATING CONDITIONS.$300K
Jul 21, 2020Department of Transportation693JK3 ACQUISITION SERVICES DIV.693JK320P000022541715SUPPORT SERVICES FOR PHMSA'S RESEARCH, DEVELOPMENT,&TESTING FACILITY AT THE TRANSPORTATION TECHNOLOGY CENTER (TTC)$326K
Jul 15, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMINDTFR5317F00793541712IGF::OT::IGF THE OBJECTIVE OF THIS CRASH ENERGY MANAGEMENT (CEM) RESEARCH EFFORT IS TO DETERMINE THE EFFECTIVENESS OF THE CEM COMPONENTS IN MITIGATING THE EFFECTS OF A COLLISION AND PREVENTING OVERRIDE.$9K
Jul 8, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000036541712NEW TASK ORDER FOR DEVELOPMENT OF SYSTEMS ENGINEERING SPECIFICATION AND SAFETY ANALYSIS FOR A QUASI MOVING BLOCK SAFETY SERVER.$575K
Jul 1, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000030541712INVESTIGATE HOW NEW AND EXISTING BALLAST AND TRACK DATA COLLECTION METHODS CAN BE OPTIMIZED, WITH REGARDS TO BOTH COLLECTION AND ANALYSIS, TO DEVELOP MODELS THAT FORECAST BALLAST AND TRACK PERFORMANCE.$150K
May 29, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000075541712TTC SITE IMPROVEMENTS R&D - TRANSPORTATION TECHNOLOGY CENTER R&D SITE IMPROVEMENTS RELATED ACTIVITIES - THE OBJECTIVE OF THIS NEW TASK IS TO REFURBISH THE WORK SPACE AREAS AND FIRE STATION BAY OF THE STORAGE MAINTENANCE BUILDING (SMB) TO ASSU$300K
May 19, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000102541712TRAIN-TO-TRAIN COLLISION TEST$51K
May 14, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000005541712FINALIZATION OF PTC INTEROPERABLE LIFECYCLE MANAGEMENT SYSTEM TO INCLUDE MIGRATION OF INDUSTRY CHANGE AND CONFIGURATION MANAGEMENT PROCESSES TO PTC INTEROPERABLE LIFECYCLE MANAGEMENT (ILM) SYSTEM.$721K
May 6, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000022541712DEVELOP FULL MOVING BLOCK REQUIREMENTS FOR RAILROAD OPERATIONS$682K
Apr 28, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN0051541712IGF::OT::IGF FRA TTC ON-SITE TESTING SUPPORT$353K
Apr 27, 2020Department of EnergyIDAHO OPERATIONS OFFICE89243218CNE000004541715ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF$264K
Apr 22, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000018541712TO PROVIDE, OR SHARE WITH TTCI IN PROVIDING SELECTED SITE IMPROVEMENTS THAT HELP TTC REMAIN A STATE-OF-ART RESEARCH FACILITY.$40K
Apr 2, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000004541712THE OBJECTIVE OF THIS TASK IS TO PROVIDE FUNDING FOR TWO YEARS TO THE PROGRAM MANAGEMENT AND GENERAL SUPPORT TO THE FRA, AS PER SECTION H.14.C OF THE CCC CONTRACT AND AS PER SPECIAL REQUESTS BY FRA.$161K
Apr 1, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000008541712DEVELOP AUTOMATED TRAIN OPERATION SEGMENT LEVEL REQUIREMENTS AND DOCUMENT TECHNOLOGY GAPS.$597K
Mar 26, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ618F000112541712REFURBISHMENT OF SELECTED FACILITIES TO RESTORE THEM IN A GOOD OPERABLE CONDITION TO SUPPORT HIGH-SPEED TESTING AT TTC$135K
Mar 25, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ620F000010541712TTCI 2016 - 2018 OVER CONTRACT VALUE REBILL$38K
Mar 12, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN0008541712IGF::OT::IGF THE PURPOSE OF THE WORK DESCRIBED WITHIN THIS STATEMENT OF WORK IS TO SUPPORT THE FULL-SCALE TESTING PROGRAM. THIS RESEARCH PROJECT WILL INCLUDE THREE TO FOUR FULL-SCALE TANK CAR DYNAMIC TESTS. THE CRASH TESTS WILL BE PERFORMED WITH DOT 113 AND DOT 105 TANK CARS.$1.1M
Mar 9, 2020Department of EnergyIDAHO OPERATIONS OFFICE89243218CNE000004541715ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF$193K
Feb 26, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMINDTFR5317F00779541712IGF::OT::IGF EFFECTS OF TEMPERATURE ON WHEEL SPALLING - PHASE III$28K
Feb 12, 2020Department of Transportation6913G6 VOLPE NATL. TRANS. SYS CNTR6913G620P800059519130AAR MANUAL OF STANDARDS AND RECOMMENDED PRACTICES$16K
Feb 10, 2020Department of Transportation6913G6 VOLPE NATL. TRANS. SYS CNTR6913G620P800058423430RENEWAL OF NUCARS SOFTWARE LICENSE$25K
Feb 6, 2020Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000015541712IGF::OT::IGF THE OBJECTIVE OF THIS TASK IS TO PROVIDE ADMINISTRATIVE SUPPORT TO THE FRA ON-SITE COTR FOR TWO CALENDAR YEARS, IN ACCORDANCE WITH SECTION G.4 (B) OF THE CCC CONTRACT, AND PER SPECIAL REQUESTS BY THE ON-SITE COTR.$65K
Jan 27, 2020Department of EnergyIDAHO OPERATIONS OFFICE89243218CNE000004541715ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF$100K
Nov 21, 2019Department of EnergyIDAHO OPERATIONS OFFICE89243218CNE000004541715ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF$127K
Sep 27, 2019Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000024541712PERFORM AUTOMATED TRAIN OPERATIONS SYSTEM SAFETY ANALYSIS - WORK WITH RAILROADS TO DEVELOP AAR STANDARD INTERFACE CONTROL DOCUMENTATION FOR THE AUTOMATED TRAIN OPERATION CONCEPT. PERFORM A RIGOROUS SAFETY CASE AND HAZARD ANALYSIS OF THE OPERATIONAL$776K
Sep 27, 2019Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000034541712COMPLETE FEASIBILITY ANALYSIS, LABORATORY TEST, AND EVALUATION OF UTILIZING LOCOMOTIVE-BASED NON-CONTACT TRANSDUCERS AND TUNED SHUNTS TO DETECT RAIL BREAKS.$637K
Sep 27, 2019Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000109541712CONDUCT A SECOND FULL SCALE SIDE IMPACT TEST ON A DOT 113 TANK CAR$1.1M
Sep 26, 2019Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN0051541712IGF::OT::IGF FRA TTC ON-SITE TESTING SUPPORT$266K
Sep 26, 2019Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000048541712ONBOARD BROKEN RAIL RESEARCH AND DEVELOPMENT PROJECT - PHASE-I$1.4M
Sep 26, 2019Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000108541712ROLLING LOAD TEST MACHINE - USING THE ROLLING CONTACT FATIGUE LOAD SIMULATOR AT THE TRANSPORTATION TECHNOLOGY CENTER TO STUDY THE ROOT CAUSE OF ROLLING CONTACT FATIGUE, AND STUDY WHEEL-RAIL MECHANICS.$298K
Sep 26, 2019Department of EnergyIDAHO OPERATIONS OFFICE89243218CNE000004541715ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF$200K
Sep 25, 2019Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN349541712IGF::OT::IGF COST-SHARING TASK ORDER PHASE I SYSTEM DESIGN: ROLLING LOAD TEST MACHINE$298K
Sep 24, 2019Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN370541712IGF::OT::IGF ACQUISITION, TRANSPORTATION AND STORAGE OF FAILED/DAMAGED RAIL TANK CARS AND/OR COMPONENTS$151K
Sep 24, 2019Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN693JJ619F000104541712DEVELOP AND TEST AN ACCURATE, NON-DESTRUCTIVE, AND AUTOMATED METHOD TO DETECT BROKEN SPIKE FASTENERS IN WOOD-TIE TRACK.$132K
Sep 24, 2019Department of Homeland SecurityMISSION ESSENTIALS70T05019C9NSTR005561210TTCI TO PROVIDE FACILITY OPERATION SUPPORT SERVICES WHICH INCLUDES PROVIDING UTILITIES, JANITORIAL SERVICES, TRASH AND O&M SERVICES NECESSARY FOR THE SAFE AND EFFICIENT OPERATIONS OF THE SURFACE TRANSPORTATION SECURITY READINESS FACILITY (STSRF).$110K

Get Alerted Before Transportation Technology Center, INC.'s Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start for free