Federal Contractor Profile
Transportation Technology Center, INC.
$87M obligated·250 awards·5 agencies·15 NAICS
Federal Contracts
Showing award actions 51–100 of 290 funded award actions, most recent first.
- Contracts with positive obligations
- 250
- Funded award actions shown
- 290
- Obligations shown
- $87M
- Awarding agencies
- 5
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of September 28, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Nov 5, 2020 | Department of EnergyIDAHO OPERATIONS OFFICE | 89243218CNE000004 | 541715 | ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF | $182K |
| Sep 23, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ620F000078 | 541712 | THIS IS FOR PERSONNEL AND MATERIAL SUPPORT ACTIVITIES NECESSARY TO SUPPORT THE FRA TECHNICAL TRAINING STANDARDS DIVISION (TTSD) AT THE TRANSPORTATION TECHNOLOGY CENTER (TTC) IN PUEBLO, CO. UNDER THIS TASK ORDER (TO), THE CONTRACTOR WILL PROVIDE LABOR | $159K |
| Sep 22, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ620F000023 | 541712 | NEW TASK ORDER FOR PROCUREMENT AND TESTING OF PTL EOT SEGMENT | $881K |
| Sep 22, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ620F000049 | 541712 | QUANTIFICATION AND EVALUATION OF RAIL FLAW INSPECTION PRACTICES AND MODERN RAIL STEEL DEFECT GROWTH ANALYSIS THIS TASK ORDER SHALL BE PERFORMED ON A COST-PLUS-FIXED-FEE (CPFF) BASIS IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK, DATED 05/06/20 | $230K |
| Sep 21, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000067 | 541712 | TO EVALUATE RELIABILITY OF RAILROAD TANK CAR NONDESTRUCTIVE EVALUATION (NDE) METHODS USING THE PROBABILITY OF DETECTION (POD) APPROACH. | $240K |
| Sep 16, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000143 | 541712 | IGF::OT::IGF - TRACK GEOMETRY MEASUREMENT SYSTEM EVALUATION; DESIGN AND BUILD A TEST TRACK SECTION WITH PRECISELY ADJUSTABLE TRACK GEOMETRY VARIATIONS. | $1.5M |
| Sep 11, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ620F000046 | 541712 | ORGANIZE SEMINAR FOR INDUSTRY AND RESEARCH COMMITTEE TO MOVE THE SCIENCE FORWARD FOR CWR FORCE MANAGEMENT IN A COORDINATED FASHION | $280K |
| Sep 11, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ620F000082 | 541712 | THE CONTRACTOR WILL DOCUMENT FREIGHT CAR TRUCK WARP RESTRAINT PERFORMANCE REQUIREMENTS, LOAD ENVIRONMENT, FAILURE MODES, AND OTHER TRUCK OPERATIONAL DEFICIENCIES (THIS WOULD INCLUDE ISSUES SUCH AS EXCESSIVE WEIGHT, INTERFERENCE WITH OTHER COMPONENTS | $237K |
| Sep 9, 2020 | Department of EnergyIDAHO OPERATIONS OFFICE | 89243218CNE000004 | 541715 | ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF | $208K |
| Sep 2, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 0051 | 541712 | IGF::OT::IGF FRA TTC ON-SITE TESTING SUPPORT | $50K |
| Aug 27, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ620F000073 | 541712 | NEW TASK ORDER FOR CONCEPT OF OPERATIONS, REQUIREMENTS, AND HAZARD ANALYSIS DEVELOPMENT FOR A ROAD REMOTE CONTROL LOCOMOTIVE SYSTEM TO SUPPORT AUTOMATED TRAIN OPERATION. | $972K |
| Aug 26, 2020 | Department of Homeland SecurityMISSION ESSENTIALS | 70T05019C9NSTR005 | 561210 | TTCI TO PROVIDE FACILITY OPERATION SUPPORT SERVICES WHICH INCLUDES PROVIDING UTILITIES, JANITORIAL SERVICES, TRASH AND O&M SERVICES NECESSARY FOR THE SAFE AND EFFICIENT OPERATIONS OF THE SURFACE TRANSPORTATION SECURITY READINESS FACILITY (STSRF). | $116K |
| Aug 25, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000072 | 541712 | THE OBJECTIVE OF THIS EXISTING TASK IS TO CONTINUE THE REFURBISHMENT OF TRACK COMPONENTS AROUND TTC TO RESTORE THEM IN A GOOD OPERABLE CONDITION TO SUPPORT ON TRACK TESTING. THIS TASK IS UNDER TO: 18F000112 AS FUNDING BECOMES AVAILABLE. | $360K |
| Aug 23, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ620F000071 | 541712 | NEW TASK ORDER FOR DEVELOPMENT AND TESTING OF A SENSOR PLATFORM TO SUPPORT AUTOMATED TRAIN OPERATION. | $855K |
| Jul 28, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ620F000040 | 541712 | ACQUIRE TWO TANK CARS AND CONDUCT TWO FULL SCALE SIDE IMPACT TESTS. THE IMPACT TESTS WILL BE CONDUCTED IN ACCORDANCE WITH THE APPROPRIATE TEST PLAN AND ARE BASED UPON PREVIOUS FRA SIDE IMPACT TESTS | $2.5M |
| Jul 22, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ620F000017 | 541712 | EVALUATE NEW AND INNOVATIVE IDEAS AND TECHNOLOGIES AT TTC AND IN REVENUE SERVICE TO MITIGATE THE ADVERSE EFFECTS HAL OPERATING CONDITIONS. | $300K |
| Jul 21, 2020 | Department of Transportation693JK3 ACQUISITION SERVICES DIV. | 693JK320P000022 | 541715 | SUPPORT SERVICES FOR PHMSA'S RESEARCH, DEVELOPMENT,&TESTING FACILITY AT THE TRANSPORTATION TECHNOLOGY CENTER (TTC) | $326K |
| Jul 15, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | DTFR5317F00793 | 541712 | IGF::OT::IGF THE OBJECTIVE OF THIS CRASH ENERGY MANAGEMENT (CEM) RESEARCH EFFORT IS TO DETERMINE THE EFFECTIVENESS OF THE CEM COMPONENTS IN MITIGATING THE EFFECTS OF A COLLISION AND PREVENTING OVERRIDE. | $9K |
| Jul 8, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ620F000036 | 541712 | NEW TASK ORDER FOR DEVELOPMENT OF SYSTEMS ENGINEERING SPECIFICATION AND SAFETY ANALYSIS FOR A QUASI MOVING BLOCK SAFETY SERVER. | $575K |
| Jul 1, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ620F000030 | 541712 | INVESTIGATE HOW NEW AND EXISTING BALLAST AND TRACK DATA COLLECTION METHODS CAN BE OPTIMIZED, WITH REGARDS TO BOTH COLLECTION AND ANALYSIS, TO DEVELOP MODELS THAT FORECAST BALLAST AND TRACK PERFORMANCE. | $150K |
| May 29, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000075 | 541712 | TTC SITE IMPROVEMENTS R&D - TRANSPORTATION TECHNOLOGY CENTER R&D SITE IMPROVEMENTS RELATED ACTIVITIES - THE OBJECTIVE OF THIS NEW TASK IS TO REFURBISH THE WORK SPACE AREAS AND FIRE STATION BAY OF THE STORAGE MAINTENANCE BUILDING (SMB) TO ASSU | $300K |
| May 19, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000102 | 541712 | TRAIN-TO-TRAIN COLLISION TEST | $51K |
| May 14, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ620F000005 | 541712 | FINALIZATION OF PTC INTEROPERABLE LIFECYCLE MANAGEMENT SYSTEM TO INCLUDE MIGRATION OF INDUSTRY CHANGE AND CONFIGURATION MANAGEMENT PROCESSES TO PTC INTEROPERABLE LIFECYCLE MANAGEMENT (ILM) SYSTEM. | $721K |
| May 6, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ620F000022 | 541712 | DEVELOP FULL MOVING BLOCK REQUIREMENTS FOR RAILROAD OPERATIONS | $682K |
| Apr 28, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 0051 | 541712 | IGF::OT::IGF FRA TTC ON-SITE TESTING SUPPORT | $353K |
| Apr 27, 2020 | Department of EnergyIDAHO OPERATIONS OFFICE | 89243218CNE000004 | 541715 | ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF | $264K |
| Apr 22, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ620F000018 | 541712 | TO PROVIDE, OR SHARE WITH TTCI IN PROVIDING SELECTED SITE IMPROVEMENTS THAT HELP TTC REMAIN A STATE-OF-ART RESEARCH FACILITY. | $40K |
| Apr 2, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000004 | 541712 | THE OBJECTIVE OF THIS TASK IS TO PROVIDE FUNDING FOR TWO YEARS TO THE PROGRAM MANAGEMENT AND GENERAL SUPPORT TO THE FRA, AS PER SECTION H.14.C OF THE CCC CONTRACT AND AS PER SPECIAL REQUESTS BY FRA. | $161K |
| Apr 1, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ620F000008 | 541712 | DEVELOP AUTOMATED TRAIN OPERATION SEGMENT LEVEL REQUIREMENTS AND DOCUMENT TECHNOLOGY GAPS. | $597K |
| Mar 26, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000112 | 541712 | REFURBISHMENT OF SELECTED FACILITIES TO RESTORE THEM IN A GOOD OPERABLE CONDITION TO SUPPORT HIGH-SPEED TESTING AT TTC | $135K |
| Mar 25, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ620F000010 | 541712 | TTCI 2016 - 2018 OVER CONTRACT VALUE REBILL | $38K |
| Mar 12, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 0008 | 541712 | IGF::OT::IGF THE PURPOSE OF THE WORK DESCRIBED WITHIN THIS STATEMENT OF WORK IS TO SUPPORT THE FULL-SCALE TESTING PROGRAM. THIS RESEARCH PROJECT WILL INCLUDE THREE TO FOUR FULL-SCALE TANK CAR DYNAMIC TESTS. THE CRASH TESTS WILL BE PERFORMED WITH DOT 113 AND DOT 105 TANK CARS. | $1.1M |
| Mar 9, 2020 | Department of EnergyIDAHO OPERATIONS OFFICE | 89243218CNE000004 | 541715 | ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF | $193K |
| Feb 26, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | DTFR5317F00779 | 541712 | IGF::OT::IGF EFFECTS OF TEMPERATURE ON WHEEL SPALLING - PHASE III | $28K |
| Feb 12, 2020 | Department of Transportation6913G6 VOLPE NATL. TRANS. SYS CNTR | 6913G620P800059 | 519130 | AAR MANUAL OF STANDARDS AND RECOMMENDED PRACTICES | $16K |
| Feb 10, 2020 | Department of Transportation6913G6 VOLPE NATL. TRANS. SYS CNTR | 6913G620P800058 | 423430 | RENEWAL OF NUCARS SOFTWARE LICENSE | $25K |
| Feb 6, 2020 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000015 | 541712 | IGF::OT::IGF THE OBJECTIVE OF THIS TASK IS TO PROVIDE ADMINISTRATIVE SUPPORT TO THE FRA ON-SITE COTR FOR TWO CALENDAR YEARS, IN ACCORDANCE WITH SECTION G.4 (B) OF THE CCC CONTRACT, AND PER SPECIAL REQUESTS BY THE ON-SITE COTR. | $65K |
| Jan 27, 2020 | Department of EnergyIDAHO OPERATIONS OFFICE | 89243218CNE000004 | 541715 | ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF | $100K |
| Nov 21, 2019 | Department of EnergyIDAHO OPERATIONS OFFICE | 89243218CNE000004 | 541715 | ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF | $127K |
| Sep 27, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000024 | 541712 | PERFORM AUTOMATED TRAIN OPERATIONS SYSTEM SAFETY ANALYSIS - WORK WITH RAILROADS TO DEVELOP AAR STANDARD INTERFACE CONTROL DOCUMENTATION FOR THE AUTOMATED TRAIN OPERATION CONCEPT. PERFORM A RIGOROUS SAFETY CASE AND HAZARD ANALYSIS OF THE OPERATIONAL | $776K |
| Sep 27, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000034 | 541712 | COMPLETE FEASIBILITY ANALYSIS, LABORATORY TEST, AND EVALUATION OF UTILIZING LOCOMOTIVE-BASED NON-CONTACT TRANSDUCERS AND TUNED SHUNTS TO DETECT RAIL BREAKS. | $637K |
| Sep 27, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000109 | 541712 | CONDUCT A SECOND FULL SCALE SIDE IMPACT TEST ON A DOT 113 TANK CAR | $1.1M |
| Sep 26, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 0051 | 541712 | IGF::OT::IGF FRA TTC ON-SITE TESTING SUPPORT | $266K |
| Sep 26, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000048 | 541712 | ONBOARD BROKEN RAIL RESEARCH AND DEVELOPMENT PROJECT - PHASE-I | $1.4M |
| Sep 26, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000108 | 541712 | ROLLING LOAD TEST MACHINE - USING THE ROLLING CONTACT FATIGUE LOAD SIMULATOR AT THE TRANSPORTATION TECHNOLOGY CENTER TO STUDY THE ROOT CAUSE OF ROLLING CONTACT FATIGUE, AND STUDY WHEEL-RAIL MECHANICS. | $298K |
| Sep 26, 2019 | Department of EnergyIDAHO OPERATIONS OFFICE | 89243218CNE000004 | 541715 | ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF | $200K |
| Sep 25, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 349 | 541712 | IGF::OT::IGF COST-SHARING TASK ORDER PHASE I SYSTEM DESIGN: ROLLING LOAD TEST MACHINE | $298K |
| Sep 24, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 370 | 541712 | IGF::OT::IGF ACQUISITION, TRANSPORTATION AND STORAGE OF FAILED/DAMAGED RAIL TANK CARS AND/OR COMPONENTS | $151K |
| Sep 24, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000104 | 541712 | DEVELOP AND TEST AN ACCURATE, NON-DESTRUCTIVE, AND AUTOMATED METHOD TO DETECT BROKEN SPIKE FASTENERS IN WOOD-TIE TRACK. | $132K |
| Sep 24, 2019 | Department of Homeland SecurityMISSION ESSENTIALS | 70T05019C9NSTR005 | 561210 | TTCI TO PROVIDE FACILITY OPERATION SUPPORT SERVICES WHICH INCLUDES PROVIDING UTILITIES, JANITORIAL SERVICES, TRASH AND O&M SERVICES NECESSARY FOR THE SAFE AND EFFICIENT OPERATIONS OF THE SURFACE TRANSPORTATION SECURITY READINESS FACILITY (STSRF). | $110K |
Get Alerted Before Transportation Technology Center, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free