Federal Contractor Profile
Transportation Technology Center, INC.
$87M obligated·250 awards·5 agencies·15 NAICS
Federal Contracts
Showing award actions 101–150 of 290 funded award actions, most recent first.
- Contracts with positive obligations
- 250
- Funded award actions shown
- 290
- Obligations shown
- $87M
- Awarding agencies
- 5
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of September 28, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 23, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000087 | 541712 | TECHNOLOGIES AND TESTING TO PREVENT WATER INGRESS TO RAILROAD BEARINGS | $150K |
| Sep 23, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000112 | 541712 | REFURBISHMENT OF SELECTED FACILITIES TO RESTORE THEM IN A GOOD OPERABLE CONDITION TO SUPPORT HIGH-SPEED TESTING AT TTC | $450K |
| Sep 23, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000102 | 541712 | TRAIN-TO-TRAIN COLLISION TEST | $1.1M |
| Sep 19, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000100 | 541712 | THE OBJECTIVE OF THIS PROJECT IS TO COMPLETE A BROAD ANALYSIS OF THE IMPACTS OF PTC ON TRACK MAINTENANCE ACTIVITIES, HUMAN FACTORS, AND FEDERAL REGULATION COMPLIANCE TO DETERMINE IF THERE ARE GAPS THAT NEED TO BE FILLED TO EFFECTIVELY INTEGRATE TRACK | $103K |
| Sep 18, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 0049 | 541712 | IGF::OT::IGF CONTINUE ANALYSIS AND PERHAPS PERFORM TESTING AT TTC OR OVER THE ROAD TO MEASURE VEHICLE PERFORMANCE TO COMBINED GEOMETRY DEVIATIONS. | $347K |
| Sep 17, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000086 | 541712 | THE OBJECTIVES OF THIS RESEARCH PROJECT WOULD BE TO UPDATE THE PREVIOUS RESEARCH: * CHARACTERIZE THE AMPLITUDE AND WAVELENGTH CONTENT OF THE CURRENT TRACK GEOMETRY ENVIRONMENT OF THE US RAILROAD SYSTEM, INCLUDING PASSENGER AND FREIGHT ROUTES * EXAMINE THE COMBINATION OF GEOMETRY PARAMETERS FOR DIFFERENT OPERATIONS FURTHERMORE, THE RESULT OF THIS RESEARCH CAN BE USED TO DEVELOP NEW ANALYTICAL TRACK GEOMETRY INPUT BASED ON THE NEW AVAILABLE DATA THAT FRA AND AAR AND OTHERS CAN USE FOR SIMULATION AND TESTING. | $90K |
| Sep 16, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000070 | 541712 | DIAGNOSIS AND DETECTION OF BEARING GREASE DEGRADATION AND DEFECTS - PHASE II THIS TASK ORDER SHALL BE PERFORMED ON A COST-PLUS-FIXED-FEE (CPFF) BASIS IN ACCORDANCE WITH THE ATTACHED FEDERAL RAILROAD ADMINISTRATION (FRA) STATEMENT OF WORK, DATED JANUARY 2018, AND THE CONTRACTOR'S TECHNICAL PROPOSAL DATED 6/19/2018, WHICH IS INCORPORATED HEREIN BY REFERENCE. TOTAL ESTIMATED COST:$331,440.00 FIXED FEE:$26,515.00 TOTAL CPFF: $357,955.00 | $100K |
| Sep 13, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000075 | 541712 | TTC SITE IMPROVEMENTS R&D - TRANSPORTATION TECHNOLOGY CENTER R&D SITE IMPROVEMENTS RELATED ACTIVITIES - THE OBJECTIVE OF THIS NEW TASK IS TO REFURBISH THE WORK SPACE AREAS AND FIRE STATION BAY OF THE STORAGE MAINTENANCE BUILDING (SMB) TO ASSU | $490K |
| Sep 12, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000092 | 541712 | DEVELOPMENT OF SYSTEM CONCEPTS AND REQUIREMENTS FOR A TRAIN ENERGY MANAGEMENT PERFORMANCE (TEMP) MONITORING SYSTEM. TEMP MONITORING IS EXPECTED TO ENHANCE THE PERFORMANCE OF AUTOMATED TRAIN OPERATIONS AS WELL AS PROVIDE IMPROVEMENTS TO CONVENTIONAL M | $547K |
| Sep 9, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000085 | 541712 | DEVELOP AND CONCEPT OF OPERATIONS AND REQUIREMENTS AND EVALUATE FEASIBILITY | $586K |
| Sep 6, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000079 | 541712 | RESEARCH AND IDENTIFY SYSTEM REQUIREMENTS FOR QUASI-MOVING BLOCK RAIL OPERATION. UPDATE EXISTING QUASI-MOVING BLOCK SAFETY ANALYSIS. | $856K |
| Sep 4, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 0038 | 541712 | IGF::OT::IGF THE FIRST OBJECTIVE OF THIS PROJECT IS TO DETERMINE WHICH FACTORS AFFECT RAIL NEUTRAL TEMPERATURE DAILY OSCILLATIONS AS WELL AS DECAY OVER TIME, AND TO APPROXIMATELY QUANTIFY THE RNT DECAY UNDER VARIOUS CONDITIONS. THIS ALSO COVERS THE INVESTIGATION OF HOW RAIL NEUTRAL TEMPERATURE/LONGITUDINAL RAIL FORCE IS RELATED TO RAIL/WELD BREAKS THAT OCCURS IN THE HIGH TONAGE LOOP (HTL), THE FACILITY FOR ACCELERATED SERVICE TESTING (FAST), LOCATED AT THE TRANSPORTATION TECHNOLOGY CENTER. THE OUTCOME OF THIS RESEARCH MAY ALSO PROVIDE DATA FOR FURTHER MODEL DEVELOPMENT TO PREDICT RNT AND TRACK BUCKLES. THE SECOND OBJECTIVE OF THIS PROJECT IS TO DETERMINE WHETHER THE MAGNITUDE OF THE DAILY RNT FLUCTUATIONS CAN BE CORRELATED WITH QUALITY OF TRACK. ONE CONSIDERATION IS TO MONITOR CURVE MOVEMENT FOR DETERMINING THE QUALITY OF TRACK. | $107K |
| Sep 3, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000064 | 541712 | DEVELOP DESIGN AND ENGINEERING REQUIREMENTS FOR A NEXT GENERATION HEAD-OF-TRAIN AND END-OF-TRAIN SYSTEM TO SUPPORT EMERGING TRAIN AUTOMATION AND TRAIN CONTROL TECHNOLOGIES. | $997K |
| Sep 3, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000069 | 541712 | A FOLLOW-ON PHASE TO THE TRACK DATA AUDITING SYSTEM (TDAS) PROJECT, FOCUSING ON THE TESTING AND VALIDATION OF THE PROTOTYPE DATA COLLECTION SEGMENT OF THE TDAS. THIS PHASE WILL ALSO ESTABLISH REQUIREMENTS FOR THE AUTOMATED DATA COMPARISON SEGMENT OF | $657K |
| Sep 3, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000071 | 541712 | DEVELOP CONCEPTS AND METHODOLOGIES NECESSARY FOR A TEST BED CAPABLE OF VERIFYING ATO EXTERNAL SAFETY SCANNING SENSORS SUFFICIENTLY MEET FUNCTIONAL AND PERFORMANCE REQUIREMENTS. | $479K |
| Sep 3, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000072 | 541712 | THE OBJECTIVE OF THIS EXISTING TASK IS TO CONTINUE THE REFURBISHMENT OF TRACK COMPONENTS AROUND TTC TO RESTORE THEM IN A GOOD OPERABLE CONDITION TO SUPPORT ON TRACK TESTING. THIS TASK IS UNDER TO: 18F000112 AS FUNDING BECOMES AVAILABLE. | $500K |
| Sep 3, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000080 | 541712 | THE CONTRACTOR SHALL UPDATE AND EXPAND THE RAILROAD WIRELESS COMMUNICATIONS ROADMAP TO STUDY, AND PROPOSE WAYS TO ADDRESS, THE RAILROADS' WIRELESS COMMUNICATION NEEDS FOR THE NEXT 20 YEARS. | $599K |
| Sep 3, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000081 | 541712 | DEVELOP DRAFT ICDS THAT INCLUDE MESSAGE BEHAVIOR FOR CRITICAL INTERFACES OUTLINED IN THE ATO CONOPS. | $492K |
| Aug 26, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000053 | 541712 | THIS IS A COST-PLUS-FIXED-FEE ORDER FOR 2019-2020 TTSD-TTCI SUPPORT. UNDER THIS TASK ORDER (TO), THE CONTRACTOR WILL PROVIDE LABOR, EQUIPMENT, AND ASSOCIATED MATERIALS TO SUPPORT THE TECHNICAL TRAINING STANDARDS DIVISION (TTSD) AT THE TRANSPORTATION | $437K |
| Aug 16, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000004 | 541712 | THE OBJECTIVE OF THIS TASK IS TO PROVIDE FUNDING FOR TWO YEARS TO THE PROGRAM MANAGEMENT AND GENERAL SUPPORT TO THE FRA, AS PER SECTION H.14.C OF THE CCC CONTRACT AND AS PER SPECIAL REQUESTS BY FRA. | $100K |
| Jul 29, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | DTFR5317F00767 | 541712 | IGF::OT::IGF FRA WILL ACQUIRE A CRYOGENIC TENDER WITH THE CORRESPONDING VALVES AND PROTECTIVE HOUSING AS REQUIRED. THE TENDER WILL BE TRANSPORTED TO THE TRANSPORTATION TECHNOLOGY CENTER (TTC) IN PUEBLO, CO. FRA AND PHMSA ARE INTERESTED IN TESTING THE TENDER TO DETERMINE THE SURVIVABILITY OF THE TENDER UNDER VARIOUS ACCIDENT SCENARIOS. IN THIS EFFORT, FRA WILL PERFORM ONE DYNAMIC IMPACT TEST AT TTC. | $222K |
| Jul 24, 2019 | Department of EnergyIDAHO OPERATIONS OFFICE | 89243218CNE000004 | 541715 | ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF | $627K |
| Jul 16, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000143 | 541712 | IGF::OT::IGF - TRACK GEOMETRY MEASUREMENT SYSTEM EVALUATION; DESIGN AND BUILD A TEST TRACK SECTION WITH PRECISELY ADJUSTABLE TRACK GEOMETRY VARIATIONS. | $441K |
| Jul 16, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | DTFR5317F00793 | 541712 | IGF::OT::IGF THE OBJECTIVE OF THIS CRASH ENERGY MANAGEMENT (CEM) RESEARCH EFFORT IS TO DETERMINE THE EFFECTIVENESS OF THE CEM COMPONENTS IN MITIGATING THE EFFECTS OF A COLLISION AND PREVENTING OVERRIDE. | $378K |
| Jun 26, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000086 | 541712 | THE OBJECTIVES OF THIS RESEARCH PROJECT WOULD BE TO UPDATE THE PREVIOUS RESEARCH: * CHARACTERIZE THE AMPLITUDE AND WAVELENGTH CONTENT OF THE CURRENT TRACK GEOMETRY ENVIRONMENT OF THE US RAILROAD SYSTEM, INCLUDING PASSENGER AND FREIGHT ROUTES * EXAMINE THE COMBINATION OF GEOMETRY PARAMETERS FOR DIFFERENT OPERATIONS FURTHERMORE, THE RESULT OF THIS RESEARCH CAN BE USED TO DEVELOP NEW ANALYTICAL TRACK GEOMETRY INPUT BASED ON THE NEW AVAILABLE DATA THAT FRA AND AAR AND OTHERS CAN USE FOR SIMULATION AND TESTING. | $17K |
| Jun 20, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000038 | 541712 | IGF::OT::IGF FACILITATION OF TECHNICAL EXCHANGES BETWEEN THE U.S. AND CHINA IN SUPPORT OF THE TRANSPORTATION FORUM. | $30K |
| May 28, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 0039 | 541712 | IGF::OT::IGF FRA AND AAR RAIL INTEGRITY RESEARCH EFFORTS ARE DIRECTED TOWARDS (1) INCREASING INTEGRITY, SAFETY, AND RELIABILITY OF RAILWAY TRANSPORTATION; AND (2) ACHIEVING HIGHER RELIABILITY OF NDE INSPECTION FOR RAIL FLAW DETECTION AND CHARACTERIZATION. FOR FY 2016 THIS WILL BE ADDRESSED BY (1) COMPLETION OF THE RF-LOAD WITH MATRIX OF MASTER GAUGES; AND (2) UNDERSTANDING THE FUNDAMENTAL LIMITATIONS OF EXISTING ULTRASONIC SYSTEMS FOR VARIED SIZES/ORIENTATION OF REALISTIC INTERNAL DEFECTS IN RAILS THAT ARE COMMONLY MISSED IN THE REVENUE SERVICE. THE OUTCOME OF THIS RESEARCH EFFORT WILL SUPPORT FUTURE RESEARCH DIRECTED TOWARDS EVALUATING AND IMPROVING THE PERFORMANCE OF CURRENT AND FUTURE RAIL INSPECTION TECHNOLOGIES FOR USE IN DETECTING RAIL FLAWS AS WELL AS THE METHODS FOR QUANTIFYING THEM. | $100K |
| May 23, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000089 | 541712 | THE CONTRACTOR WILL PROVIDE RAILROAD EXPERTISE, MANPOWER, EQUIPMENT AND TRAINING AIDS TO THE FRA TRAINING DIVISION TTSD AT TTC PUEBLO, CO. | $24K |
| May 23, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000026 | 541712 | TTC BARCODING | $68K |
| May 21, 2019 | Department of EnergyIDAHO OPERATIONS OFFICE | 89243218CNE000004 | 541715 | ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF | $3.2M |
| May 1, 2019 | Department of Homeland SecurityNATIONAL STRIKE FORCE COMMAND CTR(0 | 70Z02619PXE105700 | 541620 | TANK CAR SPECIALIST TRAINING FOR STRIKE TEAMS. 5 DAYS COURSE. | $14K |
| Apr 22, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 0031 | 541712 | IGF::OT::IGF HEAVY AXLE LOAD (HAL) COOPERATIVE RESEARCH | $227K |
| Apr 22, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000086 | 541712 | THE OBJECTIVES OF THIS RESEARCH PROJECT WOULD BE TO UPDATE THE PREVIOUS RESEARCH: * CHARACTERIZE THE AMPLITUDE AND WAVELENGTH CONTENT OF THE CURRENT TRACK GEOMETRY ENVIRONMENT OF THE US RAILROAD SYSTEM, INCLUDING PASSENGER AND FREIGHT ROUTES * EXAMINE THE COMBINATION OF GEOMETRY PARAMETERS FOR DIFFERENT OPERATIONS FURTHERMORE, THE RESULT OF THIS RESEARCH CAN BE USED TO DEVELOP NEW ANALYTICAL TRACK GEOMETRY INPUT BASED ON THE NEW AVAILABLE DATA THAT FRA AND AAR AND OTHERS CAN USE FOR SIMULATION AND TESTING. | $12K |
| Mar 29, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000015 | 541712 | IGF::OT::IGF THE OBJECTIVE OF THIS TASK IS TO PROVIDE ADMINISTRATIVE SUPPORT TO THE FRA ON-SITE COTR FOR TWO CALENDAR YEARS, IN ACCORDANCE WITH SECTION G.4 (B) OF THE CCC CONTRACT, AND PER SPECIAL REQUESTS BY THE ON-SITE COTR. | $65K |
| Mar 21, 2019 | Department of Homeland SecuritySECURITY TECHNOLOGY | HSTS0417CCT5001 | 541712 | "IGF::CT::IGF" THE GOVERNMENT HEREBY ISSUES CONTRACT HSTS04-17-C-CT5001 TO TTCI TO OBTAIN TESTING AND ASSESSMENT OF RAILCAR VULNERABILITY SERVICES. THE CONTRACTOR SHALL DELIVER THE SERVICES ASSOCIATED WITH THE CLINS HEREIN IN ACCORDANCE WITH THE ATTACHED SOW. THE PERIOD OF PERFORMANCE (POP) SHALL BE FROM 03/22/17 TO 03/21/18, AND ALSO INCLUDE 4 OPTION PERIODS. THE TOTAL VALUE OF THIS CONTRACT AT THE CONCLUSION OF THE POP IS ANTICIPATED TO BE $4,998,626.12 | $999K |
| Mar 4, 2019 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ619F000004 | 541712 | THE OBJECTIVE OF THIS TASK IS TO PROVIDE FUNDING FOR TWO YEARS TO THE PROGRAM MANAGEMENT AND GENERAL SUPPORT TO THE FRA, AS PER SECTION H.14.C OF THE CCC CONTRACT AND AS PER SPECIAL REQUESTS BY FRA. | $109K |
| Jan 28, 2019 | Department of Transportation6913G6 VOLPE NATL. TRANS. SYS CNTR | 6913G619P800046 | 423430 | RENEWAL OF NUCARS SOFTWARE LICENSES | $24K |
| Nov 1, 2018 | Department of CommerceDEPT OF COMMERCE NOAA | 1305M319PNRMJ0008 | 115310 | CONDUCT AND SUPERVISE A PRESCRIBED BURN IN ORDER TO TEST ESRL UAV TECHNOLOGY. | $12K |
| Sep 28, 2018 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000067 | 541712 | TO EVALUATE RELIABILITY OF RAILROAD TANK CAR NONDESTRUCTIVE EVALUATION (NDE) METHODS USING THE PROBABILITY OF DETECTION (POD) APPROACH. | $300K |
| Sep 26, 2018 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000086 | 541712 | THE OBJECTIVES OF THIS RESEARCH PROJECT WOULD BE TO UPDATE THE PREVIOUS RESEARCH: * CHARACTERIZE THE AMPLITUDE AND WAVELENGTH CONTENT OF THE CURRENT TRACK GEOMETRY ENVIRONMENT OF THE US RAILROAD SYSTEM, INCLUDING PASSENGER AND FREIGHT ROUTES * EXAMINE THE COMBINATION OF GEOMETRY PARAMETERS FOR DIFFERENT OPERATIONS FURTHERMORE, THE RESULT OF THIS RESEARCH CAN BE USED TO DEVELOP NEW ANALYTICAL TRACK GEOMETRY INPUT BASED ON THE NEW AVAILABLE DATA THAT FRA AND AAR AND OTHERS CAN USE FOR SIMULATION AND TESTING. | $196K |
| Sep 26, 2018 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 0038 | 541712 | IGF::OT::IGF THE FIRST OBJECTIVE OF THIS PROJECT IS TO DETERMINE WHICH FACTORS AFFECT RAIL NEUTRAL TEMPERATURE DAILY OSCILLATIONS AS WELL AS DECAY OVER TIME, AND TO APPROXIMATELY QUANTIFY THE RNT DECAY UNDER VARIOUS CONDITIONS. THIS ALSO COVERS THE INVESTIGATION OF HOW RAIL NEUTRAL TEMPERATURE/LONGITUDINAL RAIL FORCE IS RELATED TO RAIL/WELD BREAKS THAT OCCURS IN THE HIGH TONAGE LOOP (HTL), THE FACILITY FOR ACCELERATED SERVICE TESTING (FAST), LOCATED AT THE TRANSPORTATION TECHNOLOGY CENTER. THE OUTCOME OF THIS RESEARCH MAY ALSO PROVIDE DATA FOR FURTHER MODEL DEVELOPMENT TO PREDICT RNT AND TRACK BUCKLES. THE SECOND OBJECTIVE OF THIS PROJECT IS TO DETERMINE WHETHER THE MAGNITUDE OF THE DAILY RNT FLUCTUATIONS CAN BE CORRELATED WITH QUALITY OF TRACK. ONE CONSIDERATION IS TO MONITOR CURVE MOVEMENT FOR DETERMINING THE QUALITY OF TRACK. | $159K |
| Sep 26, 2018 | Department of EnergyIDAHO OPERATIONS OFFICE | 89243218CNE000004 | 541715 | ATLAS RAILCAR DESIGN PROJECT PHASES 4 AND 5 IGF::OT::IGF | $650K |
| Sep 24, 2018 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000143 | 541712 | IGF::OT::IGF - TRACK GEOMETRY MEASUREMENT SYSTEM EVALUATION; DESIGN AND BUILD A TEST TRACK SECTION WITH PRECISELY ADJUSTABLE TRACK GEOMETRY VARIATIONS. | $900K |
| Sep 21, 2018 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000136 | 541712 | IGF::OT::IGF RESEARCH AND DEVELOPMENT OF A MULTI-BAND, DIRECTIONAL ANTENNA TO SUPPORT A UNIFIED RAIL SOFTWARE DEFINED RADIO (SDR) AND MORE EFFICIENT SPECTRUM UTILIZATION. | $451K |
| Sep 18, 2018 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000124 | 541712 | IGF::OT::IGF - SYSTEM SAFETY ANALYSIS, SENSOR REQUIREMENTS DEVELOPMENT, AND INTERFACE CONTROL DOCUMENTATION FOR AUTOMATED TRAIN OPERATION | $896K |
| Sep 17, 2018 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000088 | 541712 | DEVELOPMENT OF RAWCAD PROTOTYPE&TESTING | $344K |
| Sep 17, 2018 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000122 | 541712 | IGF::OT::IGF POSITIVE TRAIN LOCATION END-OF-TRAIN RESEARCH | $307K |
| Sep 17, 2018 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 370 | 541712 | IGF::OT::IGF ACQUISITION, TRANSPORTATION AND STORAGE OF FAILED/DAMAGED RAIL TANK CARS AND/OR COMPONENTS | $149K |
| Sep 14, 2018 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000115 | 541712 | IGF::OT::IGF - EXPANSION OF AAR RAM STUDY TO INCLUDE SMALL RAILROADS, SHORT LINES, AND COMMUTERS. | $1.7M |
| Sep 14, 2018 | Department of Transportation693JJ6 FEDERAL RAILROAD ADMIN | 693JJ618F000112 | 541712 | REFURBISHMENT OF SELECTED FACILITIES TO RESTORE THEM IN A GOOD OPERABLE CONDITION TO SUPPORT HIGH-SPEED TESTING AT TTC | $597K |
Get Alerted Before Transportation Technology Center, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free