| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 6, 2024 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247320F5555 | 237130 | REPAIR DAMAGED SOUTH GATE AND INSTALL NEW K-12 RATED GATE AT TRAV | $92K |
| Apr 5, 2024 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247323F5188 | 237130 | GROUND MOUNTED SOLAR PHOTOVOLTAIC SYSTEM | $370K |
| Sep 28, 2023 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247323F5188 | 237130 | GROUND MOUNTED SOLAR PHOTOVOLTAIC SYSTEM | $11M |
| Jun 13, 2023 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247320F5543 | 237130 | CONSTRUCT SECURITY LIGHTING AT B-BUNKER, TRAVIS AFB | $46K |
| Aug 15, 2022 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247320F4538 | 237130 | REPAIR TRANSFORMERS AT SOUTH CUMMINGS STATION, NBSD | $270K |
| Apr 21, 2022 | Department of DefenseW075 ENDIST SACRAMENTO | 0004 | 237130 | IGF::OT::IGF CAMP PARKS 2MW SOLAR ARRAY INTERCONNECT | $107K |
| Nov 9, 2021 | Department of DefenseW075 ENDIST SACRAMENTO | 0004 | 237130 | IGF::OT::IGF CAMP PARKS 2MW SOLAR ARRAY INTERCONNECT | $129 |
| Sep 27, 2021 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247320F5543 | 237130 | CONSTRUCT SECURITY LIGHTING AT B-BUNKER, TRAVIS AFB | $88K |
| Sep 17, 2021 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247320F5543 | 237130 | CONSTRUCT SECURITY LIGHTING AT B-BUNKER, TRAVIS AFB | $7K |
| Jun 3, 2021 | Department of DefenseW075 ENDIST SACRAMENTO | 0004 | 237130 | IGF::OT::IGF CAMP PARKS 2MW SOLAR ARRAY INTERCONNECT | $50K |
| May 5, 2021 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247321F4629 | 237130 | X047 D7J00650MR_ D7J00660MR UPGRADE & REPAIRS TO VARIOUS FACILITIES. | $897K |
| Jan 15, 2021 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247321F4266 | 237130 | SAN NICOLAS ISLAND BATTERY ENERGY STORAGE SYSTEM (BESS) | $5.1M |
| Oct 21, 2020 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247320F4538 | 237130 | REPAIR TRANSFORMERS AT SOUTH CUMMINGS STATION, NBSD | $18K |
| Sep 29, 2020 | Department of DefenseFA4686 9 CONS PK | FA468620F0092 | 237130 | EOC GENERATORS PROJECT TOWER | $411K |
| Sep 28, 2020 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247320F5555 | 237130 | REPAIR DAMAGED SOUTH GATE AND INSTALL NEW K-12 RATED GATE AT TRAV | $440K |
| Sep 28, 2020 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247320F5406 | 237130 | X003 PWCL0164B REPLACE NORTH SUBSTATION | $2.2M |
| Sep 24, 2020 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247320F5543 | 237130 | CONSTRUCT SECURITY LIGHTING AT B-BUNKER, TRAVIS AFB | $560K |
| Sep 23, 2020 | Department of DefenseFA4686 9 CONS PK | FA468620F0116 | 237130 | INSTALL ELECTRICAL VEHICLE CHARGING STATIONS ACROSS THE BASE AT 6 DIFFERENT LOCATIONS. | $430K |
| Sep 22, 2020 | Department of DefenseFA4686 9 CONS PK | FA468620F0092 | 237130 | EOC GENERATORS PROJECT TOWER | $129K |
| Sep 16, 2020 | Department of DefenseFA4686 9 CONS PK | FA468620F0092 | 237130 | EOC GENERATORS PROJECT TOWER | $612K |
| Mar 30, 2020 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247320F4538 | 237130 | REPAIR TRANSFORMERS AT SOUTH CUMMINGS STATION, NBSD | $820K |
| Feb 24, 2020 | Department of DefenseW075 ENDIST SACRAMENTO | 0004 | 237130 | IGF::OT::IGF CAMP PARKS 2MW SOLAR ARRAY INTERCONNECT | $5K |
| Dec 23, 2019 | Department of DefenseW075 ENDIST SACRAMENTO | 0004 | 237130 | IGF::OT::IGF CAMP PARKS 2MW SOLAR ARRAY INTERCONNECT | $2K |
| Mar 29, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC018F0038 | 236220 | IGF::OT::IGF MODULAR SUPERCOMPUTING FACILITY CONSTRUCTION PROJECT. THE PURPOSE OF THIS REQUIREMENT IS FOR THE CONSTRUCTION OF CIVIL SITE IMPROVEMENTS AND NEW PRIMARY INFRASTRUCTURE FOR POWER, WATER, AND DATA COMMUNICATIONS. | $16K |
| Mar 4, 2019 | Department of DefenseFA4686 9 CONS PK | FA468619FA016 | 237130 | IGF::OT::IGF MINIMUM REQUIREMENT TO | $2K |
| Feb 12, 2019 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC018F0038 | 236220 | IGF::OT::IGF MODULAR SUPERCOMPUTING FACILITY CONSTRUCTION PROJECT. THE PURPOSE OF THIS REQUIREMENT IS FOR THE CONSTRUCTION OF CIVIL SITE IMPROVEMENTS AND NEW PRIMARY INFRASTRUCTURE FOR POWER, WATER, AND DATA COMMUNICATIONS. | $11K |
| Jan 17, 2019 | Department of DefenseNAVFACSYSCOM SOUTHWEST | N6247319F4245 | 237130 | IGF::OT::IGF MINIMUM GUARANTEE FOR DRY UTILITIES IV MACC | $5K |
| Jan 8, 2019 | Department of DefenseW075 ENDIST SACRAMENTO | 0004 | 237130 | IGF::OT::IGF CAMP PARKS 2MW SOLAR ARRAY INTERCONNECT | $32K |
| Dec 3, 2018 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC018F0038 | 236220 | IGF::OT::IGF MODULAR SUPERCOMPUTING FACILITY CONSTRUCTION PROJECT. THE PURPOSE OF THIS REQUIREMENT IS FOR THE CONSTRUCTION OF CIVIL SITE IMPROVEMENTS AND NEW PRIMARY INFRASTRUCTURE FOR POWER, WATER, AND DATA COMMUNICATIONS. | $208K |
| Nov 20, 2018 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC018F0038 | 236220 | IGF::OT::IGF MODULAR SUPERCOMPUTING FACILITY CONSTRUCTION PROJECT. THE PURPOSE OF THIS REQUIREMENT IS FOR THE CONSTRUCTION OF CIVIL SITE IMPROVEMENTS AND NEW PRIMARY INFRASTRUCTURE FOR POWER, WATER, AND DATA COMMUNICATIONS. | $12K |
| Sep 10, 2018 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC018F0038 | 236220 | IGF::OT::IGF MODULAR SUPERCOMPUTING FACILITY CONSTRUCTION PROJECT. THE PURPOSE OF THIS REQUIREMENT IS FOR THE CONSTRUCTION OF CIVIL SITE IMPROVEMENTS AND NEW PRIMARY INFRASTRUCTURE FOR POWER, WATER, AND DATA COMMUNICATIONS. | $374K |
| Apr 6, 2018 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA17BF44T | 236220 | IGF::OT::IGF REPLACE ARC JET DIFFUSERS THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF WORK ON THE PANEL TEST FACILITY (PTF) AND THE INTERACTION HEATING FACILITY (IHF). | $22K |
| Dec 11, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | 80ARC018F0038 | 236220 | IGF::OT::IGF MODULAR SUPERCOMPUTING FACILITY CONSTRUCTION PROJECT. THE PURPOSE OF THIS REQUIREMENT IS FOR THE CONSTRUCTION OF CIVIL SITE IMPROVEMENTS AND NEW PRIMARY INFRASTRUCTURE FOR POWER, WATER, AND DATA COMMUNICATIONS. | $9.5M |
| Dec 8, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA17BF44T | 236220 | IGF::OT::IGF REPLACE ARC JET DIFFUSERS THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF WORK ON THE PANEL TEST FACILITY (PTF) AND THE INTERACTION HEATING FACILITY (IHF). | $100K |
| Dec 8, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA17BF44T | 236220 | IGF::OT::IGF REPLACE ARC JET DIFFUSERS THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF WORK ON THE PANEL TEST FACILITY (PTF) AND THE INTERACTION HEATING FACILITY (IHF). | $75K |
| Oct 3, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA17BF44T | 236220 | IGF::OT::IGF REPLACE ARC JET DIFFUSERS THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF WORK ON THE PANEL TEST FACILITY (PTF) AND THE INTERACTION HEATING FACILITY (IHF). | $1K |
| Jul 12, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA16BD68T | 236220 | IGF::OT::IGF PTO #20 REPLACE ARC JET AERODYNAMIC HEATING FACILITY HEAT EXCHANGER PROJECT THE SUPPORT CONTRACT SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED FOR A COMPLETE AND OPERATING INSTALLATION OF THE AHF HX SYSTEM. THE SCOPE OF WORK INCLUDES, BUT NOT LIMITED TO THE FOLLOWING: A. REMOVE AND DEMOLISH EXISTING HEAT EXCHANGER AND ASSOCIATED PIPING AND PIPING MANIFOLD. B. INSTALL NEW GFE PLATE COIL ASSEMBLY, ASSOCIATED WATER SUPPLY, RETURN PIPING AND MANIFOLDS. C. PROVIDE LABOR AND MATERIALS TO INSTALL COOLING WATER SUPPLY AND RETURN PIPING, VALVES AND INSTRUMENTATION. D. PERFORM NON-DESTRUCTIVE EXAMINATION, HYDROSTATIC TESTING, AND LEAK TEST ON ALL NEW AND MODIFIED PIPING, PLATE COIL ASSEMBLY, AND HEAT EXCHANGER. E. PROVIDE LABOR AND MATERIALS TO RELOCATE VALVE CV-24. F. CONTRACTOR TO SUBMIT DETAILED DESIGN SHOP DRAWINGS TO NASA FOR APPROVAL PRIOR TO FABRICATION/CONSTRUCTION. | $3K |
| Jun 13, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA16BD68T | 236220 | IGF::OT::IGF PTO #20 REPLACE ARC JET AERODYNAMIC HEATING FACILITY HEAT EXCHANGER PROJECT THE SUPPORT CONTRACT SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED FOR A COMPLETE AND OPERATING INSTALLATION OF THE AHF HX SYSTEM. THE SCOPE OF WORK INCLUDES, BUT NOT LIMITED TO THE FOLLOWING: A. REMOVE AND DEMOLISH EXISTING HEAT EXCHANGER AND ASSOCIATED PIPING AND PIPING MANIFOLD. B. INSTALL NEW GFE PLATE COIL ASSEMBLY, ASSOCIATED WATER SUPPLY, RETURN PIPING AND MANIFOLDS. C. PROVIDE LABOR AND MATERIALS TO INSTALL COOLING WATER SUPPLY AND RETURN PIPING, VALVES AND INSTRUMENTATION. D. PERFORM NON-DESTRUCTIVE EXAMINATION, HYDROSTATIC TESTING, AND LEAK TEST ON ALL NEW AND MODIFIED PIPING, PLATE COIL ASSEMBLY, AND HEAT EXCHANGER. E. PROVIDE LABOR AND MATERIALS TO RELOCATE VALVE CV-24. F. CONTRACTOR TO SUBMIT DETAILED DESIGN SHOP DRAWINGS TO NASA FOR APPROVAL PRIOR TO FABRICATION/CONSTRUCTION. | $21K |
| Mar 29, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA16BD68T | 236220 | IGF::OT::IGF PTO #20 REPLACE ARC JET AERODYNAMIC HEATING FACILITY HEAT EXCHANGER PROJECT THE SUPPORT CONTRACT SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED FOR A COMPLETE AND OPERATING INSTALLATION OF THE AHF HX SYSTEM. THE SCOPE OF WORK INCLUDES, BUT NOT LIMITED TO THE FOLLOWING: A. REMOVE AND DEMOLISH EXISTING HEAT EXCHANGER AND ASSOCIATED PIPING AND PIPING MANIFOLD. B. INSTALL NEW GFE PLATE COIL ASSEMBLY, ASSOCIATED WATER SUPPLY, RETURN PIPING AND MANIFOLDS. C. PROVIDE LABOR AND MATERIALS TO INSTALL COOLING WATER SUPPLY AND RETURN PIPING, VALVES AND INSTRUMENTATION. D. PERFORM NON-DESTRUCTIVE EXAMINATION, HYDROSTATIC TESTING, AND LEAK TEST ON ALL NEW AND MODIFIED PIPING, PLATE COIL ASSEMBLY, AND HEAT EXCHANGER. E. PROVIDE LABOR AND MATERIALS TO RELOCATE VALVE CV-24. F. CONTRACTOR TO SUBMIT DETAILED DESIGN SHOP DRAWINGS TO NASA FOR APPROVAL PRIOR TO FABRICATION/CONSTRUCTION. | $6K |
| Mar 17, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA15BB95T | 236220 | IGF::OT::IGF REPLACE UPWT 1000 KVA AUX. TRANSFORMERS THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF BUT NOT LIMITED TO THE FOLLOWING: 1) DISCONNECT&DEMOLISH EXISTING AUXZILLARY 1000 KVA 7200/480V TRANSFORMERS T1, T2, T3, T4, T5, T6&T159. (2) PROVIDE NEW OUTDOOR SIX (6) 1000 KVA AND ONE (1) 1500 KVA LIQUID-FILLED TRANSFORMERS WITHA LL ACCESSORIES PER DRAWINGS AND SPECIFICATION SECTION 26 12 00.00 40. | $27K |
| Mar 14, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA16BE12T | 236220 | IGF::OT::IGF RENOVATE LABORATORIES ROOM 217 AND HB 214, N262 THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF BUT LIMITED TO THE FOLLOWING: 1) REMOVAL OF SOME WALLS, FLOORING AND CEILING IN THE CURRENT LAB ARRANGEMENT; 2) MODIFICATION TO THE EXISTING RAISED FLOOR; 3) RELOCATION OF ONE ELECTRICAL PANEL; 4) RELOCATION OF LIGHT FIXTURES; 5) INSTALLATION OF NEW WALLS, FLOORING AND CEILING FOR A NEW LAB ARRANGEMENT; 6) INSTALLATION OF ADDITIONAL WALL MOUNTED RECEPTACLES; 7) REMOVAL AND REROUTING OF DUCTWORK; 8) REMOVAL OF OLD AND INSTALL OF NEW SUPPLY AIR GRILLES AND RETURN AIR GRILLES; AND 9) MODIFICATION OF THE SPRINKLER HEADS AND SMOKE DETECTORS. | $5K |
| Feb 28, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA16BE12T | 236220 | IGF::OT::IGF RENOVATE LABORATORIES ROOM 217 AND HB 214, N262 THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF BUT LIMITED TO THE FOLLOWING: 1) REMOVAL OF SOME WALLS, FLOORING AND CEILING IN THE CURRENT LAB ARRANGEMENT; 2) MODIFICATION TO THE EXISTING RAISED FLOOR; 3) RELOCATION OF ONE ELECTRICAL PANEL; 4) RELOCATION OF LIGHT FIXTURES; 5) INSTALLATION OF NEW WALLS, FLOORING AND CEILING FOR A NEW LAB ARRANGEMENT; 6) INSTALLATION OF ADDITIONAL WALL MOUNTED RECEPTACLES; 7) REMOVAL AND REROUTING OF DUCTWORK; 8) REMOVAL OF OLD AND INSTALL OF NEW SUPPLY AIR GRILLES AND RETURN AIR GRILLES; AND 9) MODIFICATION OF THE SPRINKLER HEADS AND SMOKE DETECTORS. | $17K |
| Feb 21, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA16BD68T | 236220 | IGF::OT::IGF PTO #20 REPLACE ARC JET AERODYNAMIC HEATING FACILITY HEAT EXCHANGER PROJECT THE SUPPORT CONTRACT SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED FOR A COMPLETE AND OPERATING INSTALLATION OF THE AHF HX SYSTEM. THE SCOPE OF WORK INCLUDES, BUT NOT LIMITED TO THE FOLLOWING: A. REMOVE AND DEMOLISH EXISTING HEAT EXCHANGER AND ASSOCIATED PIPING AND PIPING MANIFOLD. B. INSTALL NEW GFE PLATE COIL ASSEMBLY, ASSOCIATED WATER SUPPLY, RETURN PIPING AND MANIFOLDS. C. PROVIDE LABOR AND MATERIALS TO INSTALL COOLING WATER SUPPLY AND RETURN PIPING, VALVES AND INSTRUMENTATION. D. PERFORM NON-DESTRUCTIVE EXAMINATION, HYDROSTATIC TESTING, AND LEAK TEST ON ALL NEW AND MODIFIED PIPING, PLATE COIL ASSEMBLY, AND HEAT EXCHANGER. E. PROVIDE LABOR AND MATERIALS TO RELOCATE VALVE CV-24. F. CONTRACTOR TO SUBMIT DETAILED DESIGN SHOP DRAWINGS TO NASA FOR APPROVAL PRIOR TO FABRICATION/CONSTRUCTION. | $35K |
| Jan 19, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA16BE12T | 236220 | IGF::OT::IGF RENOVATE LABORATORIES ROOM 217 AND HB 214, N262 THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF BUT LIMITED TO THE FOLLOWING: 1) REMOVAL OF SOME WALLS, FLOORING AND CEILING IN THE CURRENT LAB ARRANGEMENT; 2) MODIFICATION TO THE EXISTING RAISED FLOOR; 3) RELOCATION OF ONE ELECTRICAL PANEL; 4) RELOCATION OF LIGHT FIXTURES; 5) INSTALLATION OF NEW WALLS, FLOORING AND CEILING FOR A NEW LAB ARRANGEMENT; 6) INSTALLATION OF ADDITIONAL WALL MOUNTED RECEPTACLES; 7) REMOVAL AND REROUTING OF DUCTWORK; 8) REMOVAL OF OLD AND INSTALL OF NEW SUPPLY AIR GRILLES AND RETURN AIR GRILLES; AND 9) MODIFICATION OF THE SPRINKLER HEADS AND SMOKE DETECTORS. | $52K |
| Jan 13, 2017 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA16BD68T | 236220 | IGF::OT::IGF PTO #20 REPLACE ARC JET AERODYNAMIC HEATING FACILITY HEAT EXCHANGER PROJECT THE SUPPORT CONTRACT SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED FOR A COMPLETE AND OPERATING INSTALLATION OF THE AHF HX SYSTEM. THE SCOPE OF WORK INCLUDES, BUT NOT LIMITED TO THE FOLLOWING: A. REMOVE AND DEMOLISH EXISTING HEAT EXCHANGER AND ASSOCIATED PIPING AND PIPING MANIFOLD. B. INSTALL NEW GFE PLATE COIL ASSEMBLY, ASSOCIATED WATER SUPPLY, RETURN PIPING AND MANIFOLDS. C. PROVIDE LABOR AND MATERIALS TO INSTALL COOLING WATER SUPPLY AND RETURN PIPING, VALVES AND INSTRUMENTATION. D. PERFORM NON-DESTRUCTIVE EXAMINATION, HYDROSTATIC TESTING, AND LEAK TEST ON ALL NEW AND MODIFIED PIPING, PLATE COIL ASSEMBLY, AND HEAT EXCHANGER. E. PROVIDE LABOR AND MATERIALS TO RELOCATE VALVE CV-24. F. CONTRACTOR TO SUBMIT DETAILED DESIGN SHOP DRAWINGS TO NASA FOR APPROVAL PRIOR TO FABRICATION/CONSTRUCTION. | $17K |
| Dec 8, 2016 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA17BF44T | 236220 | IGF::OT::IGF REPLACE ARC JET DIFFUSERS THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF WORK ON THE PANEL TEST FACILITY (PTF) AND THE INTERACTION HEATING FACILITY (IHF). | $3.2M |
| Nov 29, 2016 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA16BE12T | 236220 | IGF::OT::IGF RENOVATE LABORATORIES ROOM 217 AND HB 214, N262 THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF BUT LIMITED TO THE FOLLOWING: 1) REMOVAL OF SOME WALLS, FLOORING AND CEILING IN THE CURRENT LAB ARRANGEMENT; 2) MODIFICATION TO THE EXISTING RAISED FLOOR; 3) RELOCATION OF ONE ELECTRICAL PANEL; 4) RELOCATION OF LIGHT FIXTURES; 5) INSTALLATION OF NEW WALLS, FLOORING AND CEILING FOR A NEW LAB ARRANGEMENT; 6) INSTALLATION OF ADDITIONAL WALL MOUNTED RECEPTACLES; 7) REMOVAL AND REROUTING OF DUCTWORK; 8) REMOVAL OF OLD AND INSTALL OF NEW SUPPLY AIR GRILLES AND RETURN AIR GRILLES; AND 9) MODIFICATION OF THE SPRINKLER HEADS AND SMOKE DETECTORS. | $36K |
| Sep 30, 2016 | Department of DefenseW075 ENDIST SACRAMENTO | 0004 | 237130 | IGF::OT::IGF CAMP PARKS 2MW SOLAR ARRAY INTERCONNECT | $951K |
| Sep 28, 2016 | Department of DefenseW075 ENDIST SACRAMENTO | 0003 | 237130 | THIS DESIGN-BUILD REQUEST FOR PROPOSAL (RFP) PROVIDES FOR THE DESIGN AND CONSTRUCTION OF A GRID TIED SOLAR PHOTOVOLTAIC (PV) PROJECT | $9K |
| Sep 27, 2016 | National Aeronautics and Space AdministrationNASA AMES RESEARCH CENTER | NNA14AA09T | 236220 | IGF::OT::IGF RESTORE ELECTRICAL RELIABILITY FOR MULTIPLE FACILITIES-T125 THE WORK TO BE PERFORMED UNDER THIS PROJECT IS TO REPLACE EXISTING AGED 30 MVA, 110 KV POWER TRANSFORMER (T125), AIR SWITCHES, OIL CIRCUIT BREAKERS, STATION SERVICE TRANSFORMER, GROUNDING TRANSFORMER, CURRENT LIMITING REACTORS AND OTHER RELATED POWER EQUIPMENT SUPPORTING MISSION CRITICAL FACILITIES; N250 HIGH PRESSURE AIR COMPRESSOR USED BY UNITARY FACILITY, N260 COMPRESSOR USED BY FLUID MECHANIC LAB, N238 ARC JET DI-WATER PUMPS SUBSTATION AND N243A VMS DRIVE POWER FACILITY. SEE STATEMENT OF WORK, SPECIFICATIONS AND DRAWINGS FOR MORE INFORMATION. | $9K |
Get Alerted Before Tri-technic INC's Next Recompete