Skip to content
Home/Contractors/Vantage Systems, INC.

Federal Contractor Profile

Vantage Systems, INC.

Federal contracting record: $163M obligated across 50 awards from 2 agencies, FY 2016–2026.

$163M
Total Obligated
50
Award Records
2
Agencies Served
6
NAICS Codes

Company Profile

Parent UEI (Unique Entity Identifier)

HJ1HKNWSY3R7

CAGE Code

3EL99

Registered Entities (UEIs)

2 under this organization

Address

4600 FORBES BLVD STE 250, LANHAM, MD, 207064358

First Federal Award

Oct 19, 2015

Most Recent Award

Jul 27, 2026

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

Top NAICS Activity

  • 541712

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)

    41 awards

    $163M
  • 541330

    ENGINEERING SERVICES

    5 awards

    $572K
  • 541511

    CUSTOM COMPUTER PROGRAMMING SERVICES

    1 awards

    $36K
  • 334511

    SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING

    1 awards

    $35K
  • 541715

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)

    1 awards

    $3K
  • 541350

    BUILDING INSPECTION SERVICES

    1 awards

    $3K

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Jul 27, 2026National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER334511FLIGHT MLI BLANKETS FOR THE PILS COMPONENT$35K
Jun 18, 2026Department of DefenseNAVAL RESEARCH LABORATORY541715SPACECRAFT ENGINEERING, SOFTWARE, RESEARCH AND DEVELOPMENT SERVICES$100K
Apr 10, 2025National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712THE PRIMARY FOCUS OF THIS TASK IS TO: (A) SUPPORT THE DEVELOPMENT OF HIGHLY EFFICIENT ELECTRONICS BY COORDINATING WITH BOARD LAYOUT COMPANIES TO PRODUCE COMPONENTS THAT MEET THE NEEDS OF AIRCRAFT SYSTEM INTEGRATION (B) DEVELOP TEST SETUPS OF HYBRID ELECTRIC COMPONENTS INCLUDING SOLID MODELING, ANALYSES, AND FABRICATION. (C) COORDINATE EXTERNAL AND INTERNAL DOCUMENTATION FOR MULTIPLE PROJECTS WORKING ON ELECTRIFIED AIRCRAFT PROJECTS.$2K
Feb 5, 2025National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712IGF::OT::IGF GESS-3 IT TASK ORDER EXERCISES OPTION 3 AND 4.$2K
Feb 5, 2025National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712IGF::OT::IGF GESS-3 IDIQ WO428 AIRCRAFT MOTOR AND MOTOR DRIVE RESEARCH$365
Dec 19, 2024General Services AdministrationGSA/FAS/PSHC/OASIS PLUS541715ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) SMALL BUSINESS MULTIPLE AGENCY CONTRACT (MAC)$3K
Dec 17, 2024General Services AdministrationGSA/FAS/PSHC/OASIS PLUS541350ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) UNRESTRICTED MULTIPLE AGENCY CONTRACT (MAC)$3K
Jul 26, 2024National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712GESS3, TASK 1 ADMINISTRATION FY19$350
Apr 22, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712GESS3, TASK 3 ODC, FY20$17K
Mar 27, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712FUNDING ORDER FOR GLENN ENGINEERING AND SCIENTIFIC SERVICES (GESS3), TASK 4 ENGINEERING LABOR, FY20$376K
Mar 26, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712IGF::OT::IGF W-8 TEST RIG UPGRADES FOR AATT PROJECT RESEARCH$1K
Mar 26, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712IGF::OT::IGF WORK ORDER 353 SUPERCONDUCTING MOTOR COMPONENTS AND TEST DEVICES$45K
Mar 25, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712THE EXISTING 5 TRAILER GH2 SYSTEM NEEDS TO MODIFIED TO BE ABLE TO RUN ETHYLENE GAS AND THIS STATEMENT OF WORK (SOW) ENCOMPASSES ALL ASPECTS OF THIS TASK THAT SHALL BE INCLUDED IN THE IDIQ FOR THE DESIGN, PROCUREMENT AND INSTALLATION OF THE MODIFICATIONS THAT ARE REQUIRED. THE COMPLETED SYSTEM IS REQUIRED TO BE OPERATIONAL BY SEPT. 1, 2019. AT THE END OF TESTING ALL MODIFICATIONS SHALL BE REMOVED AND THE SYSTEM SHALL BE PUT BACK INTO ITS ORIGINAL CONDITION, CAPABLE OF RUNNING GH2.$326K
Mar 24, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712THE PRIMARY FOCUS OF THIS TASK IS TO: (A) SUPPORT THE DEVELOPMENT OF HIGHLY EFFICIENT ELECTRONICS BY COORDINATING WITH BOARD LAYOUT COMPANIES TO PRODUCE COMPONENTS THAT MEET THE NEEDS OF AIRCRAFT SYSTEM INTEGRATION (B) DEVELOP TEST SETUPS OF HYBRID ELECTRIC COMPONENTS INCLUDING SOLID MODELING, ANALYSES, AND FABRICATION. (C) COORDINATE EXTERNAL AND INTERNAL DOCUMENTATION FOR MULTIPLE PROJECTS WORKING ON ELECTRIFIED AIRCRAFT PROJECTS.$42K
Mar 24, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712FUNDING ORDER FOR GLENN ENGINEERING AND SCIENTIFIC SERVICES (GESS3), TASK 4 ENGINEERING LABOR, FY20$379K
Jan 14, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712THE EXISTING 5 TRAILER GH2 SYSTEM NEEDS TO MODIFIED TO BE ABLE TO RUN ETHYLENE GAS AND THIS STATEMENT OF WORK (SOW) ENCOMPASSES ALL ASPECTS OF THIS TASK THAT SHALL BE INCLUDED IN THE IDIQ FOR THE DESIGN, PROCUREMENT AND INSTALLATION OF THE MODIFICATIONS THAT ARE REQUIRED. THE COMPLETED SYSTEM IS REQUIRED TO BE OPERATIONAL BY SEPT. 1, 2019. AT THE END OF TESTING ALL MODIFICATIONS SHALL BE REMOVED AND THE SYSTEM SHALL BE PUT BACK INTO ITS ORIGINAL CONDITION, CAPABLE OF RUNNING GH2.$333K
Jan 11, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712IGF::OT::IGF GESS-3 IDIQ WO428 AIRCRAFT MOTOR AND MOTOR DRIVE RESEARCH$253K
Jan 11, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712GESS3, TASK 3 ODC, FY20$190K
Jan 11, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712THE PRIMARY FOCUS OF THIS TASK IS TO: (A) SUPPORT THE DEVELOPMENT OF HIGHLY EFFICIENT ELECTRONICS BY COORDINATING WITH BOARD LAYOUT COMPANIES TO PRODUCE COMPONENTS THAT MEET THE NEEDS OF AIRCRAFT SYSTEM INTEGRATION (B) DEVELOP TEST SETUPS OF HYBRID ELECTRIC COMPONENTS INCLUDING SOLID MODELING, ANALYSES, AND FABRICATION. (C) COORDINATE EXTERNAL AND INTERNAL DOCUMENTATION FOR MULTIPLE PROJECTS WORKING ON ELECTRIFIED AIRCRAFT PROJECTS.$67K
Jan 11, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712GESS3, TASK 2 IT, FY20$340K
Jan 11, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712IGF::OT::IGF WORK ORDER 333-UHB FAN NOISE HARDWARE GESS-3$175K
Jan 11, 2020National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712GESS3, TASK 2 IT, FY20$73K
Dec 23, 2019National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712GESS3 ADMIN TASK FY20$313K
Dec 23, 2019National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712FUNDING ORDER FOR GLENN ENGINEERING AND SCIENTIFIC SERVICES (GESS3), TASK 4 ENGINEERING LABOR, FY20$6.4M
Oct 11, 2019National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER541712IGF::OT::IGF WORK ORDER 333-UHB FAN NOISE HARDWARE GESS-3$148K

Top Compensated Officers

From FFATA executive compensation disclosures. Reported when federal contract activity exceeds the statutory threshold.

  • JOSEPH OGONEK

    Rank 1 · Reported Dec 16, 2020

    $230K
  • JOSEPH D POLK

    Rank 2 · Reported Dec 16, 2020

    $193K
  • MICHAEL H AHAN

    Rank 3 · Reported Dec 16, 2020

    $193K
  • PAUL GIEL

    Rank 4 · Reported Dec 16, 2020

    $170K
  • SUSAN JANSEN

    Rank 5 · Reported Dec 16, 2020

    $165K

Want to win work like Vantage Systems, INC.?

Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.