Federal Contractor Profile
Vantage Systems, INC.
Federal contracting record: $163M obligated across 50 awards from 2 agencies, FY 2016–2026.
Company Profile
Parent UEI (Unique Entity Identifier)
HJ1HKNWSY3R7
CAGE Code
3EL99
Registered Entities (UEIs)
2 under this organization
Address
4600 FORBES BLVD STE 250, LANHAM, MD, 207064358
First Federal Award
Oct 19, 2015
Most Recent Award
Jul 27, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- National Aeronautics and Space Administration$163M
100.0% of total obligations
- General Services Administration$5K
0.0% of total obligations
Top NAICS Activity
- 541712$163M
RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)
41 awards
- $572K
- $36K
- 334511$35K
SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING
1 awards
- 541715$3K
RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)
1 awards
- $3K
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Jul 27, 2026 | National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER | 334511 | FLIGHT MLI BLANKETS FOR THE PILS COMPONENT | $35K |
| Jun 18, 2026 | Department of DefenseNAVAL RESEARCH LABORATORY | 541715 | SPACECRAFT ENGINEERING, SOFTWARE, RESEARCH AND DEVELOPMENT SERVICES | $100K |
| Apr 10, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | THE PRIMARY FOCUS OF THIS TASK IS TO: (A) SUPPORT THE DEVELOPMENT OF HIGHLY EFFICIENT ELECTRONICS BY COORDINATING WITH BOARD LAYOUT COMPANIES TO PRODUCE COMPONENTS THAT MEET THE NEEDS OF AIRCRAFT SYSTEM INTEGRATION (B) DEVELOP TEST SETUPS OF HYBRID ELECTRIC COMPONENTS INCLUDING SOLID MODELING, ANALYSES, AND FABRICATION. (C) COORDINATE EXTERNAL AND INTERNAL DOCUMENTATION FOR MULTIPLE PROJECTS WORKING ON ELECTRIFIED AIRCRAFT PROJECTS. | $2K |
| Feb 5, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | IGF::OT::IGF GESS-3 IT TASK ORDER EXERCISES OPTION 3 AND 4. | $2K |
| Feb 5, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | IGF::OT::IGF GESS-3 IDIQ WO428 AIRCRAFT MOTOR AND MOTOR DRIVE RESEARCH | $365 |
| Dec 19, 2024 | General Services AdministrationGSA/FAS/PSHC/OASIS PLUS | 541715 | ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) SMALL BUSINESS MULTIPLE AGENCY CONTRACT (MAC) | $3K |
| Dec 17, 2024 | General Services AdministrationGSA/FAS/PSHC/OASIS PLUS | 541350 | ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) UNRESTRICTED MULTIPLE AGENCY CONTRACT (MAC) | $3K |
| Jul 26, 2024 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | GESS3, TASK 1 ADMINISTRATION FY19 | $350 |
| Apr 22, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | GESS3, TASK 3 ODC, FY20 | $17K |
| Mar 27, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | FUNDING ORDER FOR GLENN ENGINEERING AND SCIENTIFIC SERVICES (GESS3), TASK 4 ENGINEERING LABOR, FY20 | $376K |
| Mar 26, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | IGF::OT::IGF W-8 TEST RIG UPGRADES FOR AATT PROJECT RESEARCH | $1K |
| Mar 26, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | IGF::OT::IGF WORK ORDER 353 SUPERCONDUCTING MOTOR COMPONENTS AND TEST DEVICES | $45K |
| Mar 25, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | THE EXISTING 5 TRAILER GH2 SYSTEM NEEDS TO MODIFIED TO BE ABLE TO RUN ETHYLENE GAS AND THIS STATEMENT OF WORK (SOW) ENCOMPASSES ALL ASPECTS OF THIS TASK THAT SHALL BE INCLUDED IN THE IDIQ FOR THE DESIGN, PROCUREMENT AND INSTALLATION OF THE MODIFICATIONS THAT ARE REQUIRED. THE COMPLETED SYSTEM IS REQUIRED TO BE OPERATIONAL BY SEPT. 1, 2019. AT THE END OF TESTING ALL MODIFICATIONS SHALL BE REMOVED AND THE SYSTEM SHALL BE PUT BACK INTO ITS ORIGINAL CONDITION, CAPABLE OF RUNNING GH2. | $326K |
| Mar 24, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | THE PRIMARY FOCUS OF THIS TASK IS TO: (A) SUPPORT THE DEVELOPMENT OF HIGHLY EFFICIENT ELECTRONICS BY COORDINATING WITH BOARD LAYOUT COMPANIES TO PRODUCE COMPONENTS THAT MEET THE NEEDS OF AIRCRAFT SYSTEM INTEGRATION (B) DEVELOP TEST SETUPS OF HYBRID ELECTRIC COMPONENTS INCLUDING SOLID MODELING, ANALYSES, AND FABRICATION. (C) COORDINATE EXTERNAL AND INTERNAL DOCUMENTATION FOR MULTIPLE PROJECTS WORKING ON ELECTRIFIED AIRCRAFT PROJECTS. | $42K |
| Mar 24, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | FUNDING ORDER FOR GLENN ENGINEERING AND SCIENTIFIC SERVICES (GESS3), TASK 4 ENGINEERING LABOR, FY20 | $379K |
| Jan 14, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | THE EXISTING 5 TRAILER GH2 SYSTEM NEEDS TO MODIFIED TO BE ABLE TO RUN ETHYLENE GAS AND THIS STATEMENT OF WORK (SOW) ENCOMPASSES ALL ASPECTS OF THIS TASK THAT SHALL BE INCLUDED IN THE IDIQ FOR THE DESIGN, PROCUREMENT AND INSTALLATION OF THE MODIFICATIONS THAT ARE REQUIRED. THE COMPLETED SYSTEM IS REQUIRED TO BE OPERATIONAL BY SEPT. 1, 2019. AT THE END OF TESTING ALL MODIFICATIONS SHALL BE REMOVED AND THE SYSTEM SHALL BE PUT BACK INTO ITS ORIGINAL CONDITION, CAPABLE OF RUNNING GH2. | $333K |
| Jan 11, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | IGF::OT::IGF GESS-3 IDIQ WO428 AIRCRAFT MOTOR AND MOTOR DRIVE RESEARCH | $253K |
| Jan 11, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | GESS3, TASK 3 ODC, FY20 | $190K |
| Jan 11, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | THE PRIMARY FOCUS OF THIS TASK IS TO: (A) SUPPORT THE DEVELOPMENT OF HIGHLY EFFICIENT ELECTRONICS BY COORDINATING WITH BOARD LAYOUT COMPANIES TO PRODUCE COMPONENTS THAT MEET THE NEEDS OF AIRCRAFT SYSTEM INTEGRATION (B) DEVELOP TEST SETUPS OF HYBRID ELECTRIC COMPONENTS INCLUDING SOLID MODELING, ANALYSES, AND FABRICATION. (C) COORDINATE EXTERNAL AND INTERNAL DOCUMENTATION FOR MULTIPLE PROJECTS WORKING ON ELECTRIFIED AIRCRAFT PROJECTS. | $67K |
| Jan 11, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | GESS3, TASK 2 IT, FY20 | $340K |
| Jan 11, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | IGF::OT::IGF WORK ORDER 333-UHB FAN NOISE HARDWARE GESS-3 | $175K |
| Jan 11, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | GESS3, TASK 2 IT, FY20 | $73K |
| Dec 23, 2019 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | GESS3 ADMIN TASK FY20 | $313K |
| Dec 23, 2019 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | FUNDING ORDER FOR GLENN ENGINEERING AND SCIENTIFIC SERVICES (GESS3), TASK 4 ENGINEERING LABOR, FY20 | $6.4M |
| Oct 11, 2019 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | IGF::OT::IGF WORK ORDER 333-UHB FAN NOISE HARDWARE GESS-3 | $148K |
Top Compensated Officers
From FFATA executive compensation disclosures. Reported when federal contract activity exceeds the statutory threshold.
- $230K
JOSEPH OGONEK
Rank 1 · Reported Dec 16, 2020
- $193K
JOSEPH D POLK
Rank 2 · Reported Dec 16, 2020
- $193K
MICHAEL H AHAN
Rank 3 · Reported Dec 16, 2020
- $170K
PAUL GIEL
Rank 4 · Reported Dec 16, 2020
- $165K
SUSAN JANSEN
Rank 5 · Reported Dec 16, 2020
Want to win work like Vantage Systems, INC.?
Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.