Federal Contractor Profile
Vantage Systems, INC.
Federal contracting record: $163M obligated across 49 awards from 2 agencies, FY 2016–2026.
Company Profile
Parent UEI (Unique Entity Identifier)
HJ1HKNWSY3R7
CAGE Code
3EL99
Registered Entities (UEIs)
2 under this organization
Address
4600 FORBES BLVD STE 100, LANHAM, MD, 207064358
First Federal Award
Oct 19, 2015
Most Recent Award
Mar 27, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- $163M
National Aeronautics and Space Administration
100.0% of total obligations
- $5K
General Services Administration
0.0% of total obligations
Top NAICS Activity
- $163M
541712
RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)
41 awards
- $572K
541330
ENGINEERING SERVICES
5 awards
- $36K
541511
CUSTOM COMPUTER PROGRAMMING SERVICES
1 awards
- $3K
541350
BUILDING INSPECTION SERVICES
1 awards
- $3K
541715
RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)
1 awards
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Apr 10, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | THE PRIMARY FOCUS OF THIS TASK IS TO: (A) SUPPORT THE DEVELOPMENT OF HIGHLY EFFICIENT ELECTRONICS BY COORDINATING WITH BOARD LAYOUT COMPANIES TO PRODUCE COMPONENTS THAT MEET THE NEEDS OF AIRCRAFT SYSTEM INTEGRATION (B) DEVELOP TEST SETUPS OF HYBRID ELECTRIC COMPONENTS INCLUDING SOLID MODELING, ANALYSES, AND FABRICATION. (C) COORDINATE EXTERNAL AND INTERNAL DOCUMENTATION FOR MULTIPLE PROJECTS WORKING ON ELECTRIFIED AIRCRAFT PROJECTS. | $2K |
| Feb 5, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | IGF::OT::IGF GESS-3 IDIQ WO428 AIRCRAFT MOTOR AND MOTOR DRIVE RESEARCH | $365 |
| Feb 5, 2025 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | IGF::OT::IGF GESS-3 IT TASK ORDER EXERCISES OPTION 3 AND 4. | $2K |
| Dec 19, 2024 | General Services AdministrationGSA/FAS/PSHC/OASIS PLUS | 541715 | ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) SMALL BUSINESS MULTIPLE AGENCY CONTRACT (MAC) | $3K |
| Dec 17, 2024 | General Services AdministrationGSA/FAS/PSHC/OASIS PLUS | 541350 | ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) UNRESTRICTED MULTIPLE AGENCY CONTRACT (MAC) | $3K |
| Jul 26, 2024 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | GESS3, TASK 1 ADMINISTRATION FY19 | $350 |
| Apr 22, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | GESS3, TASK 3 ODC, FY20 | $17K |
| Mar 27, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | FUNDING ORDER FOR GLENN ENGINEERING AND SCIENTIFIC SERVICES (GESS3), TASK 4 ENGINEERING LABOR, FY20 | $376K |
| Mar 26, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | IGF::OT::IGF WORK ORDER 353 SUPERCONDUCTING MOTOR COMPONENTS AND TEST DEVICES | $45K |
| Mar 26, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | IGF::OT::IGF W-8 TEST RIG UPGRADES FOR AATT PROJECT RESEARCH | $1K |
| Mar 25, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | THE EXISTING 5 TRAILER GH2 SYSTEM NEEDS TO MODIFIED TO BE ABLE TO RUN ETHYLENE GAS AND THIS STATEMENT OF WORK (SOW) ENCOMPASSES ALL ASPECTS OF THIS TASK THAT SHALL BE INCLUDED IN THE IDIQ FOR THE DESIGN, PROCUREMENT AND INSTALLATION OF THE MODIFICATIONS THAT ARE REQUIRED. THE COMPLETED SYSTEM IS REQUIRED TO BE OPERATIONAL BY SEPT. 1, 2019. AT THE END OF TESTING ALL MODIFICATIONS SHALL BE REMOVED AND THE SYSTEM SHALL BE PUT BACK INTO ITS ORIGINAL CONDITION, CAPABLE OF RUNNING GH2. | $326K |
| Mar 24, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | THE PRIMARY FOCUS OF THIS TASK IS TO: (A) SUPPORT THE DEVELOPMENT OF HIGHLY EFFICIENT ELECTRONICS BY COORDINATING WITH BOARD LAYOUT COMPANIES TO PRODUCE COMPONENTS THAT MEET THE NEEDS OF AIRCRAFT SYSTEM INTEGRATION (B) DEVELOP TEST SETUPS OF HYBRID ELECTRIC COMPONENTS INCLUDING SOLID MODELING, ANALYSES, AND FABRICATION. (C) COORDINATE EXTERNAL AND INTERNAL DOCUMENTATION FOR MULTIPLE PROJECTS WORKING ON ELECTRIFIED AIRCRAFT PROJECTS. | $42K |
| Mar 24, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | FUNDING ORDER FOR GLENN ENGINEERING AND SCIENTIFIC SERVICES (GESS3), TASK 4 ENGINEERING LABOR, FY20 | $379K |
| Jan 14, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | THE EXISTING 5 TRAILER GH2 SYSTEM NEEDS TO MODIFIED TO BE ABLE TO RUN ETHYLENE GAS AND THIS STATEMENT OF WORK (SOW) ENCOMPASSES ALL ASPECTS OF THIS TASK THAT SHALL BE INCLUDED IN THE IDIQ FOR THE DESIGN, PROCUREMENT AND INSTALLATION OF THE MODIFICATIONS THAT ARE REQUIRED. THE COMPLETED SYSTEM IS REQUIRED TO BE OPERATIONAL BY SEPT. 1, 2019. AT THE END OF TESTING ALL MODIFICATIONS SHALL BE REMOVED AND THE SYSTEM SHALL BE PUT BACK INTO ITS ORIGINAL CONDITION, CAPABLE OF RUNNING GH2. | $333K |
| Jan 11, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | THE PRIMARY FOCUS OF THIS TASK IS TO: (A) SUPPORT THE DEVELOPMENT OF HIGHLY EFFICIENT ELECTRONICS BY COORDINATING WITH BOARD LAYOUT COMPANIES TO PRODUCE COMPONENTS THAT MEET THE NEEDS OF AIRCRAFT SYSTEM INTEGRATION (B) DEVELOP TEST SETUPS OF HYBRID ELECTRIC COMPONENTS INCLUDING SOLID MODELING, ANALYSES, AND FABRICATION. (C) COORDINATE EXTERNAL AND INTERNAL DOCUMENTATION FOR MULTIPLE PROJECTS WORKING ON ELECTRIFIED AIRCRAFT PROJECTS. | $67K |
| Jan 11, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | IGF::OT::IGF WORK ORDER 333-UHB FAN NOISE HARDWARE GESS-3 | $175K |
| Jan 11, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | GESS3, TASK 3 ODC, FY20 | $190K |
| Jan 11, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | IGF::OT::IGF GESS-3 IDIQ WO428 AIRCRAFT MOTOR AND MOTOR DRIVE RESEARCH | $253K |
| Jan 11, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | GESS3, TASK 2 IT, FY20 | $340K |
| Jan 11, 2020 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | GESS3, TASK 2 IT, FY20 | $73K |
| Dec 23, 2019 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | GESS3 ADMIN TASK FY20 | $313K |
| Dec 23, 2019 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | FUNDING ORDER FOR GLENN ENGINEERING AND SCIENTIFIC SERVICES (GESS3), TASK 4 ENGINEERING LABOR, FY20 | $6.4M |
| Oct 11, 2019 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | IGF::OT::IGF WORK ORDER 333-UHB FAN NOISE HARDWARE GESS-3 | $148K |
| Sep 26, 2019 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | FUNDING ORDER FOR GLENN ENGINEERING AND SCIENTIFIC SERVICES (GESS3), TASK 4 ENGINEERING LABOR, FY20 | $622K |
| Sep 24, 2019 | National Aeronautics and Space AdministrationNASA GLENN RESEARCH CENTER | 541712 | IGF::OT::IGF WORK ORDER 353 SUPERCONDUCTING MOTOR COMPONENTS AND TEST DEVICES | $45K |
Top Compensated Officers
From FFATA executive compensation disclosures. Reported when federal contract activity exceeds the statutory threshold.
- $230K
JOSEPH OGONEK
Rank 1 · Reported Dec 16, 2020
- $193K
JOSEPH D POLK
Rank 2 · Reported Dec 16, 2020
- $193K
MICHAEL H AHAN
Rank 3 · Reported Dec 16, 2020
- $170K
PAUL GIEL
Rank 4 · Reported Dec 16, 2020
- $165K
SUSAN JANSEN
Rank 5 · Reported Dec 16, 2020
Subawards Received
Vantage Systems, INC. also receives subaward dollars from other prime contractors. Aggregated from USAspending sub-award reporting (FY2016-FY2026).
Top 6 Primes Paying Vantage Systems, INC.
- Lockheed Martin Corporation$7.8M
4 subawards
- Kbr Wyle Services, LLC$5.0M
1 subawards
- Aerodyne-sgt Engineering Services, LLC$4.0M
1 subawards
- $1.7M
- Ata Aerospace, LLC$1.4M
3 subawards
- Southwest Research Institute$367K
3 subawards
Related Contractors
Other companies active in NAICS 541712 — RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY).
Massachusetts Institute Of Technology
$2.9B
Brookhaven Science Associates LLC
$2.8B
Torch Technologies INC
$1.6B
Massachusetts Institute Of Technology
$1.5B
Science Applications International Corporation
$1.4B
Northrop Grumman Corporation
$943M
Odyssey Systems Consulting Group, LTD.
$894M
L3HARRIS Technologies, INC
$850M
Track Vantage Systems, INC. Recompetes Before They Post
Mindy monitors Vantage Systems, INC.'s active contracts and alerts you 12 months before they expire — so you can position to compete on recompete.
Get Free Recompete Alerts