70Z03026QCLEV0059 – U.S. COAST GUARD AIR STATION TRAVERSE CITY WINDOW REPLACEMENT PROJECT
HOMELAND SECURITY, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
70Z03026QCLEV0059
NAICS
238290
PSC
Z2AZ
Set-aside
No Set aside used
Posted
June 29, 2026
Response due
July 10, 2026
Place of performance
Traverse City, MI
Description
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
Coast Guard Air Station Traverse City
1175 Airport Access RD
Traverse City, MI 49686
Project Specification
For
Smith Hall Berthing Room Window Replacement
June 2026
Scope of Work
1.0 PURPOSE The purpose of this Scope of Work (SOW) is to define the requirements for the
replacement of the windows in the berthing rooms of Smith Hall Building at the U.S. Coast Guard
Air Station (AIRSTA) Traverse City, Michigan. This project aims to increase HVAC efficiency and crew
comfort.
2.0 SCOPE OF WORK The Contractor shall provide all necessary labor, supervision, tools,
equipment, materials, transportation, and expertise to remove and replace the 10 double wide
awning style windows (20 total) the berthing rooms of Smith Hall in accordance with specifications
provided. This includes, but is not limited to:
a. Pre-installation site survey and verification of existing conditions. Required to review SOW before
submitting a proposal, highly recommend that site visits are also conducted before submitting a
proposal. Contractors to field verify site conditions and measurements of windows. All Contractors
shall provide Air Station Traverse City 24hr notice before all planned site visits. Please contact the
Facilities Department Chief to coordinate all site visits.
b. Procurement and delivery of new windows.
c. Removal and disposal of the old windows from the premises.
d. Installation of the new windows, including opening preparation/cleaning,
weatherproofing/sealing, and/or structural support if necessary. Window specifications:
i. Energy star rated, minimum should be insulated dual pane glass (low-e). Traverse City is in
a Northern Climate zone as per National Fenestration Rating Council (NFRC).
ii. Matching style to current windows: crank out awning style, double wide with a center mull
bar between.
iii. Black exterior and white interior.
-- 1 of 5 --
e. Provision of all necessary documentation, including window specifications and warranty
information.
f. Post-installation cleanup and removal of all debris from the work site.
3.0 LOCATION OF WORK The work shall be performed at: U.S. Coast Guard Air Station Traverse
City 1175 Airport Access Road Traverse City, MI 49686
Specific building and exact location of the 10 berthing rooms in Smith Hall will be identified during
the site survey and pre-bid conference. The Contractor shall contact the Base Officer of the Day
(OOD) to sign in and gain access to the Air Station Traverse City.
4.0 PERIOD OF PERFORMANCE Commencement of work will be affected by weather and windows
being on hand. Demo of current windows will not start until the replacement window is on hand.
Upon award the Contractor shall submit spec sheets of windows within 14 calendar days to
Contracting Officers Representative (COR) for approval before ordering. A detailed project
schedule will also be submitted for approval within fourteen (14) calendar days of contract award.
This schedule shall outline all phases of the work, including mobilization, material procurement,
removal, installation, and demobilization, with specific milestones and durations.
5.0 CONTRACTOR REQUIREMENTS
5.1 General Requirements The Contractor shall comply with all applicable federal, state, and local
laws, regulations, and codes, including but not limited to environmental protection, safety, and
health standards. The Contractor shall minimize disruption to USCG operations during the
execution of this project.
5.2 Submittals Within fourteen (14) calendar days of contract award, the Contractor shall submit
the following to the COR for review and approval:
a. Detailed Project Schedule (as specified in Section 4.0). Demo work will not start until replace
window is on hand.
b. Proposed window and associated specifications.
c. Shop Drawings for any required structural modifications.
d. Safety Plan and Accident Prevention Plan specific to the unit replacement.
5.3 Execution of Work
a. Mobilization: Contractor shall mobilize all necessary personnel, tools, and equipment to the site.
c. Installation: Install the new windows in the designated locations, ensuring proper alignment,
securement, and sealing in existing window openings. Any modifications to existing infrastructure
required for compatibility shall be included.
-- 2 of 5 --
f. Site Cleanup: Maintain a clean work area throughout the project and perform a thorough cleanup
upon completion, removing all tools, equipment, waste, and debris.
g. Unforeseen/Additional Work: Any additional or unforeseen work discovered during the project
shall be submitted via Request for Information (RFI) to the COR prior to commencing any such
work.
5.4 Documentation and Closeout Upon completion of work, the Contractor shall provide:
a. As-installed drawings reflecting any changes made during installation. Only required if major
changes were necessary for window installation.
b. Warranty information for a 1-year warranty on all parts and labor in addition to the
manufacturer’s warranty.
c. A final project report summarizing the work performed any lessons learned.
d. All relevant documentation and warranty information shall be submitted to the COR within seven
(7) calendar days of completion of work.
5.5 Key Personnel
a. List of Key Personnel: The Contractor shall provide a Supervisor/Project Manager who shall be
responsible for all Contractor work performed under this contract. This individual shall serve as the
single point of contact for the Contracting Officer and the COR.
5.6 Meetings
a. Project Meetings: Two mandatory meetings shall be held:
i. A kick-off meeting before the start of the project.
ii. A close-out meeting at the end of the project.
b. Additional Meetings: Project meetings may be held as needed, determined by the COR or at the
request of the Contractor.
c. Attendance: All meetings shall be attended by a representative from the USCG Air Station
Traverse City, the COR, and the prime Contractor's Supervisor/Project Manager…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238290)
USAFA - Cascade Wind Tunnel Removal
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 4, 2026
Y1DA--646-24-100 | Elevator Upgrade Bed Tower | Pittsburgh - UD
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 4, 2026
DDCN Urgent Security Screen Repair
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 28, 2026
Z1DA--Upgrade Elevators 506-24-102 (VA-26-00040953)
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 4, 2026
Yale EW (2-Ton Capacity) Bridge Crane Dismantle and Removal
DEPT OF DEFENSE · Solicitation · due August 15, 2026
Overhaul Repair and upgrade main slide gate system
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 5, 2026