Yale EW (2-Ton Capacity) Bridge Crane Dismantle and Removal
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
N32253-26-Q-0068
NAICS
238290
PSC
P500
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 23, 2026
Response due
August 15, 2026
Place of performance
JBPHH, HI
What this opportunity is
The Department of Defense is seeking a contractor to dismantle and remove a Yale EW bridge crane with a 2-ton capacity at the Pearl Harbor Naval Shipyard in Hawaii. This opportunity is set aside for total small businesses under NAICS code 238290. Interested contractors should note that attendance at a mandatory site visit is required prior to bidding, which emphasizes the importance of assessing the physical constraints and logistical considerations for the project.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PERFORMANCE WORK STATEMENT (PWS)
PEARL HARBOR NAVAL SHIPYARD (PHNSY & IMF)
REMOVAL AND DISMANTLE OF A YALE EW BRIDGE CRANE
1.0 BACKGROUND
1.1 The primary mission of PHNSY & IMF is to deliver regional maintenance, at the depot
and intermediate levels, to keep the surface ships and submarines of our nation's navy
"Fit to Fight." As Hawaii’s regional maintenance center, capabilities include excellence
in overhauling, repairing, converting, alteration, refurbishing, and decommissioning of
Navy vessels.
2.0 OBJECTIVE & SCOPE
2.1 The contractor shall provide services to safely dismantle and remove one (1) Yale EW,
2-ton capacity, under-running, single-girder bridge crane. The target equipment is
located within a facility inside the Controlled Industrial Area (CIA).
3.0 PERFORMANCE REQUIREMENTS
3.1 To ensure proposal accuracy and performance realism, the Contractor or an
authorized representative shall attend a mandatory site visit scheduled by the
Government prior to bidding. Technical specifications, drawings, and photographs
may not represent every physical detail, constraint, or obstruction. This physical
walkthrough is required to accurately assess spatial limitations, identify existing
equipment constraints, verify utility connection points, and evaluate logistical staging
areas.
3.2 The Contractor shall provide all labor, supervision, tools, design, transportation and
machinery to remove, dismantle and palletize the bridge crane.
3.3 The contractor shall provide one individual as a Project Manager who is responsible for
the planning, scheduling and managing the execution of work concerning all aspects of
this contract.
3.4 Prior to commencing work, the contractor shall meet in conference with the government
Technical Point of Contact (TPOC), Contracting Officer’s Representative (COR) and
necessary support personnel to discuss and develop mutual understandings related to
safety, security, methods, schedule, environmental and waste management.
3.5 A preliminary Plan of Action and Milestones (POAM) plan must be submitted prior to
commencing. This plan will highlight plans for the equipment items to be disassembled,
removed, packaged, and relocated/staged, under this specification during the contract
period of performance. The POAM shall be submitted in a PDF format within ten (10)
business days after the contract is awarded. The POAM will be reviewed and approved
by the government.
-- 1 of 7 --
3.6 The contractor shall submit a preliminary Removal Plan as part of the Contractor’s
proposal and bid submittal. The preliminary plan should include at a minimum scope of
work, lifting and handling material and equipment to be used, lift configuration, center of
gravity of load and timeline.
3.7 The contractor shall provide all material handling and lifting equipment (such as cranes,
multi-purpose machines, MHE, and construction equipment used as cranes to lift-
suspended loads), rigging support services, and other support equipment necessary for
continuous support and shall provide qualified personnel for safe operation. In
accordance with Code 410 Contract Requirement: Crane, Multi-Purpose Machine, and
Material Handling Equipment (MHE) Operations at JBPHH, the contractor will complete
the NAVFAC HI QA/Safety Contractor & Rigging Crane Entry Package and submit to the
TPOC and COR within the designated time frame stated. The lifting and handling plan
shall include at a minimum, lift configuration, center of gravity of the lifted load, laydown
area, overhead interference(s) and mobile crane hook height requirements. Lifting and
handling operations shall only commence once the Crane Entry Package is approved by
the Government.
NOTE: Rigging by choking or sweeping using synthetic products is not allowed unless
approved by the Government. Tilting of lifted or suspended loads during installation,
when it is necessary, shall only be performed using a chain-fall, ratchet hoist or similar
equipment, and only done in a controlled manner following government approval.
3.7.1 Contractor shall have a spill kit at the work area to clean fluid spills from
material handling equipment (MHE) immediately.
3.7.2 Drip diapers shall be used in MHE laydown spaces.
3.8 The contractor shall present an Environmental Protection Plan (EPP) as part of the
Contractor’s proposal and bid submittal. APPENDIX I and II in paragraph 13.0, outline
the various elements that shall be addressed, for the presence of hazardous material,
including lead and asbestos, and environmental mitigation efforts, including nuisance
dust control and other steps to be taken to minimize or prevent damage to adjoining
structures, on-going PHNSY & IMF operations and injury to personnel working in the
vicinity. Once accepted by the Government, the EPP shall become an integral part of the
requirements of this PWS.
3.8.1 Environmental /Safety compliance: The Government will monitor the
Contractor, to ensure that the Contractor’s EPP is being followed. The technical
point of contact (TPOC) and contracting officer’s representative (COR) retain
the right to stop the Contractor from performing any work that violates
environmental and safety regulations; the Contractor shall be in compliance
prior to re-commencing the work.
3.8.2 The contractor shall provide an Industrial Hygienist responsible for supervising
-- 2 of 7 --
and implementing environmental compliance processes, inclusive of hazardous
material testing and abatement.
3.9 The contractor shall provide a Safety Plan covering all aspects of safety for this project.
The safety plan shall be approved by the government prior to commencement of work.
All work performed shall be in accordance with applicable Federal, State of Hawaii and
Occupational Safety and Health Administration (OSHA) requirements. Refer to
APPENDIX I for guidance regarding safety.
3.10 All hot work must comply with NFPA 51B Standard for Fire Prevention during Welding,
Cutting and other Hot Work. The contractor shall …
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238290)
DDCN Urgent Security Screen Repair
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 28, 2026
Z1DA--Upgrade Elevators 506-24-102 (VA-26-00040953)
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 4, 2026
Y1DA--646-24-100 | Elevator Upgrade Bed Tower | Pittsburgh - UD
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 4, 2026
Overhaul Repair and upgrade main slide gate system
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 5, 2026
FY26 Upgrades for Various Recruiting Stations
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 7, 2026
UMSB Supplemental Cooling Install
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 11, 2026