89 MXG FAN MAINTENANCE
DEPT OF DEFENSE
Notice type
Sources Sought
Solicitation #
FA28602689MXGFANMAINT
NAICS
811310
PSC
J041
Set-aside
8a Competed
Posted
July 13, 2026
Response due
July 17, 2026
Place of performance
Andrews Air Force Base, MD
Description
PERFORMANCE WORK STATEMENT
For
89 th Maintenance Group, Joint
Base Andrews
Preventative Maintenance and Inspection
(PMI)
Prepared by: SrA Reyes 07/10/2026
-- 1 of 6 --
2
1. LOCATION: Joint Base Andrews, Hangars 3,4,6 and 7. Arrangements for entrance
onto the installation must be made between the hours of 7:00 a.m. and 4:30 p.m.,
Monday through Friday.
2. PURPOSE: Conduct preventative maintenance on the 24 Industrial Fans annually for 4
years. If the system fails, MX crews shall be unable to perform aircraft maintenance
duties to keep 89th Airlift Wing aircraft fully functional as the hangar frequently sees
high temperatures and must have good ventilation to mitigate hazardous fumes. Regular
service is required to ensure that our industrial fan systems operate at peak performance
and shall include service for all 24 industrial fans including the mounts, fan blades,
motors, controls, and electrical connections.
The Government requires a solution that is durable, reliable, and economical that meets
all requirements of the Department of Defense (DOD), Air Force (AF).
3. SCOPE OF WORK: The work covered by this Performance Work Statement
(PWS) consists of all the listed items in the work summary.
4. WORK SUMMARY:
a. Overall Objectives
The following items shall be performed by trained personnel:
• Shall provide completed reports within 5 business days of completing each scheduled
service cycle.
• Shall document all work and inspections performed on each fan assembly
• Shall document all discrepancies and repairs required on each fan assembly
• Provide any recommendations for additional and suggested improvements
• Provide the needed equipment, tools, parts, and consumable materials to complete
prevented maintenance and repairs of all fans
• Remove and clean all airfoils and inspect hub and airfoils for signs of damage
• Check tightness of all mounting hardware with a torque wrench
• Check Breather cap (if applicable
• Check oil levels (if applicable) and inspect for any signs of leakage, service if required
• Check safety cables. If guy wires are present, check tightness
• Check mounting method
• Check that fan is plumb and level
• Inspect whole fan for signs of corrosion, discoloration, pitting, or flaking metal
• Inspect for vibration during operation
• Check dimensions of any supplemental steel supports
• Visually inspect welds
• Check wiring harnesses and ensure all electrical connections are properly seated
• Perform needed repairs to ensure all fans are operational
• Repair and replace damaged air foils, motors, mounts, and all hardware as needed. All
fans are under warranty and will not constitute a change to the scope of work. The
additional labor involved is the same/similar required to do other minor maintenance
and is performed in the same way as called out in this PWS.
• Verify raceways are isolated (e.g., line, load, other fans)
-- 2 of 6 --
3
• Verify electrical connections on motor and controller are correct arrangement and properly
tightened
• Verify fault history
• Verify properly sized fuses are installed in controlled (if applicable)
• Verify maximum Hz has not been changed in the variable frequency drive (VFD)
• Inspect for any signs of physical damage to fan or controller
• Clear debris and dirt from VFD with air gun
• Document any customer complaints (not including repair work for incorrect fan mounting,
damaged parts or other issues identified)
6. ACCESS:
5. SPECIFICATIONS:
• Submittals:
• The contractor shall submit a completion report within 5 business days of
completing each scheduled service cycle of all 24 industrial fans and any
recommendations that shall prolong the service life of the industrial fans.
• Maintenance action report
• Utilities:
• Contractor shall be responsible for damages to water pipes, gas pipes, oil pipes,
electrical wires, conduits, drains, sewers, buildings, and other structures that may
be set within prosecution of the work, owned by individuals, firms, corporations
or by the municipality. Contractor shall be liable for damages to public or private
property resulting there from.
• Fan information
• The fleet of fans is comprised of both Powerfoil x3.0 and Powerfoil x4.0:
• Hangar 3
Two (2) 25’ fans; 45’ ground to ceiling height
Four 15 ft’ fans; 55ft ground to ceiling height
• Hangar 4
Two (2) 25’ fans; 45’ ground to ceiling height
Four 15 ft’ fans; 55ft ground to ceiling height
• Hangar 6
Two (2) 25’ fans; 45’ ground to ceiling height
Four 15 ft’ fans; 55ft ground to ceiling height
• Hangar 7
Two (2) 25’ fans; 45’ ground to ceiling height
Four 15 ft’ fans; 55ft ground to ceiling height
• BASE: The contractor shall provide a list of names, DOBs, full SSNs, Driver’s
License numbers and state of issue of all employees who shall be requesting base
access to the Project Manager at least two weeks prior to the start of work. All
employees shall have a background check conducted by Security Forces prior to
being granted base access. Once vetted the employees shall go to the Visitor
Control Center to get issued a temporary pass. Each person must keep the passes
on their person at all time. Access to the Base is limited to travel from the Main
Gate to the 1280 Arnold Ave, Joint Base Andrews, MD 20762. All other areas are
off limits. All Contractor vehicles on base must have proof of Insurance and
-- 3 of 6 --
4
operators must have a valid driver’s license. Violations of these security
requirements shall revoke any or all passes. The government reserves the right to
deny access to any person, with no consequence to the contract. While on the
installation, the contractor shall not employ persons for work on this contract if
such employee is identified to the contractor by the Contracting Officer as a
potential threat to the health, safety, security, general well-being or operational
mission of the installation and its population. Contractor personnel shall present
a neat appearance and be easily recognized as contractor employees.
…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 811310)
Sunshade Sustainment
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 25, 2026
Forklift Inspection, Repair, & Certification for USNS Medgar Evers
DEPT OF DEFENSE · Solicitation · due July 31, 2026
Notice of Intent to Sole Source - HAAS Repair - Eielson AFB, AK
DEPT OF DEFENSE · Special Notice · due July 31, 2026
USCGC HEALY - BOW CRANE HYDRAULIC CYLINDER REPLACEMENT
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 31, 2026
Breathing Air Systems and Compressor / Air Dryer Preventative Maintenance
DEPT OF DEFENSE · Solicitation · due August 7, 2026
USCGC MIDGETT ENGINE INSPECTION
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 29, 2026