What this opportunity is
The Department of Defense is seeking industry capabilities for a potential design-build construction project that involves the installation of Active Vehicle Barrier Control Systems (AVBCS), guard booths, and related access control point (ACP) infrastructure improvements at Fort Lee, Virginia. This opportunity is open to all businesses, as there is no set-aside for small businesses. As this is a Sources Sought notice, it is primarily for market research and planning purposes, meaning interested parties should focus on providing capabilities rather than submitting bids or pricing.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
SHOPPADAMS
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.10 09/25 STATEMENT OF WORK
01 14 00 11/22, CHG 5: 05/25 WORK RESTRICTIONS
01 20 00 11/20, CHG 5: 02/25 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 5: 02/25 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 08/23, CHG 1: 08/24 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 16.00 10 05/16 DESIGN DATA (DESIGN AFTER AWARD)
01 35 26 05/24, CHG 1: 05/25 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 08/23, CHG 3: 08/25 QUALITY CONTROL
01 45 00.15 10 11/23 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22, CHG 2: 08/25 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 05/23, CHG 1: 05/25 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 05/23 FACILITY DATA REQUIREMENTS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
-- 1 of 336 --
SHOPPADAMS
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.10
STATEMENT OF WORK
09/25
PART 1 GENERAL
1.1 REFERENCES
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Title and Location
1.2.2 Project Description
1.2.3 TASK ELEMENTS
1.2.3.1 AVBCS DESIGN SHOP ACP - CLIN 0001
1.2.3.2 AVBCS CONSTRUCTION SHOP ACP - CLIN 0002
1.2.3.3 OPTIONAL AVBCS DESIGN ADAMS ACP - CLIN 0003
1.2.3.4 OPTIONAL AVBCS CONSTRUCTION ADAMS ACP - CLIN 0004
1.2.3.5 OPTIONAL ID CHECK RECONFIGURATION DESIGN - CLIN 0005
1.2.3.6 OPTIONAL ID CHECK RECONFIGURATION CONSTRUCTION - CLIN 0006
1.2.3.7 OPTIONAL PVB DESIGN ADAMS ACP - CLIN 0007
1.2.3.8 OPTIONAL PVB CONSTRUCTION ADAMS ACP - CLIN 0008
1.2.3.9 OPTIONAL PVB DESIGN SHOP ACP - CLIN 0009
1.2.3.10 OPTIONAL PVB CONSTRUCTION SHOP ACP - CLIN 0010
1.2.3.11 OPTIONAL TRANSFORMER SHOP ACP - CLIN 0011
1.2.4 DETAILED TASK ELEMENTS
1.2.5 EXISTING INSTALLATION INFORMATION
1.3 SECURITY REQUIREMENTS
1.4 GOVERNMENT OCCUPANCY OF PREMISES
1.5 CONTRACTOR ACCESS AND USE OF PREMISES
1.6 EXISTING WORK
1.7 LOCATION OF UNDERGROUND FACILITIES
1.8 DESIGN REQUIREMENTS
1.9 CERTIFICATION OF WORK
PART 2 PRODUCTS
PART 3 EXECUTION
PART 4 ADDENDUMS/ENGINEERING CHANGE PROPOSALS (ECP)
-- End of Section Table of Contents --
SECTION 01 11 00.10 Page 1
-- 2 of 336 --
SHOPPADAMS
01 11 00.10
STATEMENT OF WORK
09/25
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent
referenced. The publications are referred to within the text by the basic
designation only. Unless a specific document version or date is indicated,
use criteria from the most current references as of the date of issue of
the contract or task order, including any applicable addenda, unless
otherwise stated in the task order. In the event of conflict between
References and/or Applicable Military Criteria, apply the most stringent
requirement, unless otherwise specifically noted in the contract or task
order.
U.S. ARMY (DA)
Army ECBs Army Engineering & Construction Bullletins
(ECBs)
Army Standard for ACPs (2012) The Army Standard for Access (ACPs)
Army Standard Design (2024)Army Standard Design
DOD Anti-Ram Barrier List (2026) DOD Anti-Ram Barrier List
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 1-200-01 (2022; with Change 4, 2024) DoD Building
Code
UFC 4-010-06 (2023) Cybersecurity of Facility-Related
Control Systems
UFC 4-022-01 (2017) Entry Control Facilities/Access
Control
Unless a specific document version or date is indicated, use criteria from
the most current references as of the date of issue of the contract or task
order, including any applicable addenda, unless otherwise stated in the
task order. In the event of conflict between References and/or Applicable
Military Criteria, apply the most stringent requirement, unless otherwise
specifically noted in the contract or task order.
SECTION 01 11 00.10 Page 2
-- 3 of 336 --
SHOPPADAMS
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Title and Location
Fort Lee, Virginia (VA), Shopp and Adams Gates Active Vehicle Barrier
Control System (AVBCS)and Passive Vehicle Barrier Installation.
The work associated with this contract is located at Shopp Gate and Adams
Gate, Fort Lee, VA. Shop Gate is located on Shop Road near the
intersection of Shop Road and Quartermaster Road. Adams Gate is located on
Adams Road near the intesection of Adams Road and Valley Forge Lane.
1.2.2 Project Description
The work is under a design-build (DB) type contract and includes design and
construction phases. The AVBCS and guard booth install is defined under
0001, 0002 for Shop ACP and 0003 and 0004 for Adams ACP. Passive Vehicle
Barriers will be included under optional CLINs 0005 and 0006 for Shop Road
and 0007 and 0008 at Adams ACP, CLINS 0009 and 0010 will also include ID
Check area reconfiguration. CLINs 0005-0010 are optional.
The contractor shall provide all materials, equipment, and labor for the
design and installation of an Active Vehicle Barrier Control System
(AVBCS), guard booth demolition and replacement, crash beam installation at
the maintenance road in response zone, optional response zone passive
vehicle barriers and ID Reconfiguration. This work covers a total of four
(4) AVBs: two (2) at Shop ACP and two (2) at Adams ACP (one inbound and one
outbound at each of the two ACPs, installation of one crash rated drop arm
and demolition of guard booth under ID Check Canopy and installation of new
guard booth. Additional it includes work to install Passive Vehicle
Barriers in the response zone and reconfiguration on the ID Check area at
Adams ACP to accomodate an additional concrete island and guard booth.
This work includes site grading, subgrade preparation, site utilities,
paving, reinforced concrete, electr…
Source: SAM.gov, as posted. Verify the current solicitation before responding.