Skip to content

Open for responses

Access Control Point (ACP) Active Vehicle Barrier (AVB) Systems and Guard Booths

DEPT OF DEFENSE

Notice type
Sources Sought
Solicitation #
W912DY27ACPAVB
NAICS
237310
PSC
Z2LB
Set-aside
No Set aside used
Posted
November 9, 2026
Response due
November 18, 2026
Place of performance
Fort Lee, VA

What this opportunity is

The Department of Defense is seeking industry capabilities for a potential design-build construction project that involves the installation of Active Vehicle Barrier Control Systems (AVBCS), guard booths, and related access control point (ACP) infrastructure improvements at Fort Lee, Virginia. This opportunity is open to all businesses, as there is no set-aside for small businesses. As this is a Sources Sought notice, it is primarily for market research and planning purposes, meaning interested parties should focus on providing capabilities rather than submitting bids or pricing.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

SHOPPADAMS PROJECT TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 11 00.10 09/25 STATEMENT OF WORK 01 14 00 11/22, CHG 5: 05/25 WORK RESTRICTIONS 01 20 00 11/20, CHG 5: 02/25 PRICE AND PAYMENT PROCEDURES 01 30 00 11/20, CHG 5: 02/25 ADMINISTRATIVE REQUIREMENTS 01 32 01.00 10 08/23, CHG 1: 08/24 PROJECT SCHEDULE 01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES 01 33 16.00 10 05/16 DESIGN DATA (DESIGN AFTER AWARD) 01 35 26 05/24, CHG 1: 05/25 GOVERNMENTAL SAFETY REQUIREMENTS 01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS 01 45 00 08/23, CHG 3: 08/25 QUALITY CONTROL 01 45 00.15 10 11/23 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) 01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS 01 57 19 08/22, CHG 2: 08/25 TEMPORARY ENVIRONMENTAL CONTROLS 01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION 01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS 01 78 23 05/23, CHG 1: 05/25 OPERATION AND MAINTENANCE DATA 01 78 24.00 10 05/23 FACILITY DATA REQUIREMENTS -- End of Project Table of Contents -- PROJECT TABLE OF CONTENTS Page 1 -- 1 of 336 -- SHOPPADAMS SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 11 00.10 STATEMENT OF WORK 09/25 PART 1 GENERAL 1.1 REFERENCES 1.2 WORK COVERED BY CONTRACT DOCUMENTS 1.2.1 Project Title and Location 1.2.2 Project Description 1.2.3 TASK ELEMENTS 1.2.3.1 AVBCS DESIGN SHOP ACP - CLIN 0001 1.2.3.2 AVBCS CONSTRUCTION SHOP ACP - CLIN 0002 1.2.3.3 OPTIONAL AVBCS DESIGN ADAMS ACP - CLIN 0003 1.2.3.4 OPTIONAL AVBCS CONSTRUCTION ADAMS ACP - CLIN 0004 1.2.3.5 OPTIONAL ID CHECK RECONFIGURATION DESIGN - CLIN 0005 1.2.3.6 OPTIONAL ID CHECK RECONFIGURATION CONSTRUCTION - CLIN 0006 1.2.3.7 OPTIONAL PVB DESIGN ADAMS ACP - CLIN 0007 1.2.3.8 OPTIONAL PVB CONSTRUCTION ADAMS ACP - CLIN 0008 1.2.3.9 OPTIONAL PVB DESIGN SHOP ACP - CLIN 0009 1.2.3.10 OPTIONAL PVB CONSTRUCTION SHOP ACP - CLIN 0010 1.2.3.11 OPTIONAL TRANSFORMER SHOP ACP - CLIN 0011 1.2.4 DETAILED TASK ELEMENTS 1.2.5 EXISTING INSTALLATION INFORMATION 1.3 SECURITY REQUIREMENTS 1.4 GOVERNMENT OCCUPANCY OF PREMISES 1.5 CONTRACTOR ACCESS AND USE OF PREMISES 1.6 EXISTING WORK 1.7 LOCATION OF UNDERGROUND FACILITIES 1.8 DESIGN REQUIREMENTS 1.9 CERTIFICATION OF WORK PART 2 PRODUCTS PART 3 EXECUTION PART 4 ADDENDUMS/ENGINEERING CHANGE PROPOSALS (ECP) -- End of Section Table of Contents -- SECTION 01 11 00.10 Page 1 -- 2 of 336 -- SHOPPADAMS 01 11 00.10 STATEMENT OF WORK 09/25 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only. Unless a specific document version or date is indicated, use criteria from the most current references as of the date of issue of the contract or task order, including any applicable addenda, unless otherwise stated in the task order. In the event of conflict between References and/or Applicable Military Criteria, apply the most stringent requirement, unless otherwise specifically noted in the contract or task order. U.S. ARMY (DA) Army ECBs Army Engineering & Construction Bullletins (ECBs) Army Standard for ACPs (2012) The Army Standard for Access (ACPs) Army Standard Design (2024)Army Standard Design DOD Anti-Ram Barrier List (2026) DOD Anti-Ram Barrier List U.S. DEPARTMENT OF DEFENSE (DOD) UFC 1-200-01 (2022; with Change 4, 2024) DoD Building Code UFC 4-010-06 (2023) Cybersecurity of Facility-Related Control Systems UFC 4-022-01 (2017) Entry Control Facilities/Access Control Unless a specific document version or date is indicated, use criteria from the most current references as of the date of issue of the contract or task order, including any applicable addenda, unless otherwise stated in the task order. In the event of conflict between References and/or Applicable Military Criteria, apply the most stringent requirement, unless otherwise specifically noted in the contract or task order. SECTION 01 11 00.10 Page 2 -- 3 of 336 -- SHOPPADAMS 1.2 WORK COVERED BY CONTRACT DOCUMENTS 1.2.1 Project Title and Location Fort Lee, Virginia (VA), Shopp and Adams Gates Active Vehicle Barrier Control System (AVBCS)and Passive Vehicle Barrier Installation. The work associated with this contract is located at Shopp Gate and Adams Gate, Fort Lee, VA. Shop Gate is located on Shop Road near the intersection of Shop Road and Quartermaster Road. Adams Gate is located on Adams Road near the intesection of Adams Road and Valley Forge Lane. 1.2.2 Project Description The work is under a design-build (DB) type contract and includes design and construction phases. The AVBCS and guard booth install is defined under 0001, 0002 for Shop ACP and 0003 and 0004 for Adams ACP. Passive Vehicle Barriers will be included under optional CLINs 0005 and 0006 for Shop Road and 0007 and 0008 at Adams ACP, CLINS 0009 and 0010 will also include ID Check area reconfiguration. CLINs 0005-0010 are optional. The contractor shall provide all materials, equipment, and labor for the design and installation of an Active Vehicle Barrier Control System (AVBCS), guard booth demolition and replacement, crash beam installation at the maintenance road in response zone, optional response zone passive vehicle barriers and ID Reconfiguration. This work covers a total of four (4) AVBs: two (2) at Shop ACP and two (2) at Adams ACP (one inbound and one outbound at each of the two ACPs, installation of one crash rated drop arm and demolition of guard booth under ID Check Canopy and installation of new guard booth. Additional it includes work to install Passive Vehicle Barriers in the response zone and reconfiguration on the ID Check area at Adams ACP to accomodate an additional concrete island and guard booth. This work includes site grading, subgrade preparation, site utilities, paving, reinforced concrete, electr…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 237310