Skip to content

Awarded to TRADEMASTERS SERVICE, INC. on September 14, 2026

This is an award notice, not an open solicitation. Related open opportunities are listed below.

Arlington National Cemetery Tomb Guard HVAC Project

DEPT OF DEFENSE

Notice type
Award Notice
Solicitation #
W91QV126CA057
NAICS
238220
PSC
J041
Set-aside
Small Business Set Aside - Total
Posted
September 14, 2026
Response due
—
Place of performance
Fort Myer, VA

What this opportunity is

The Department of Defense is seeking a small business to provide a complete turnkey replacement of the split system HVAC unit serving the Tomb Guards Area at Arlington National Cemetery in Virginia. This project involves decommissioning the existing unit, installing a new high-efficiency system, and modifying ductwork with minimal impact on the historic structure. As this is a total small business set-aside and an award notice, interested contractors should focus on compliance with quality assurance standards and be prepared for a non-personal services contract, which requires no government supervision.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

PERFORMANCE WORK STATEMENT (PWS) Tomb – Guards Area – Replace HVAC Unit (Split System) Arlington National Cemetery (ANC) Date: August 2026 PART 1: GENERAL INFORMATION 1. General This is a non-personal services contract to provide a complete turnkey replacement of the split system HVAC unit serving the Tomb Guards Area at Arlington National Cemetery (ANC). The government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn, is responsible to the government. 1.1 Description of Services/Introduction The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the complete decommissioning, demolition, installation, commissioning, and testing of a new split system HVAC unit (condenser and evaporator) to match existing capacity at the Tomb – Guards Area. The contractor shall perform to the standards and specifications defined in this Performance Work Statement (PWS). 1.2 Background Arlington National Cemetery (ANC), a national shrine hosting 4–6 million visitors annually, conducts approximately 6,000 funerals and 2,000 ceremonies yearly, including high-profile events with dignitaries, heads of state, and media. The Tomb of the Unknown Soldier is the symbolic heart of ANC, guarded 24/7 by the Tomb -- 1 of 26 -- Guards (3rd U.S. Infantry Regiment, "The Old Guard"). Maintaining stable environmental and climate controls within the Tomb Guards Area is critical to support their continuous, high-profile operations. There is zero tolerance for operational disruptions, noise violations, or system downtime during funerals or ceremonies. The Contractor's services must reflect ANC's symbolic importance, adhering to FAR 46.4, AR 702-11, and DoD 5000.02 for quality assurance. 1.3 Objectives The objectives of this project are: • Safely recover refrigerant and decommission the existing failing split system HVAC unit. • Procure and install a high-efficiency replacement split system HVAC unit in the same physical footprint. • Modify existing ductwork and electrical connections with minimal physical impact to the historic structure. • Install new stand-alone controls for independent local operation. • Ensure zero operational interference with the Tomb Guards' ceremonial and administrative duties. 1.4 Scope The services to be performed involve the turnkey demolition of the old split system and installation of a new, matched-capacity HVAC split system in the same physical locations. • Included Services: Refrigerant recovery; disconnecting of ductwork, piping, and electrical; temporary removal of obstruction ductwork (as needed to access the mechanical room); physical demolition and off-site disposal of the old condenser and evaporator; installation of the new split system; running of new refrigerant lines; pressure testing and dehydration; charging with low Global Warming Potential (GWP) refrigerant; reconnection and modification of existing ductwork/electrical; and installation of stand-alone controls. • Specific Exclusions: This contract explicitly excludes Direct Digital Control (DDC) integration work into the main Campus Building Automation System (BAS), electrical service heavy-ups/capacity upgrades, independent design or structural drawing generation, and any overtime or off-hours work unless pre- authorized by the Contracting Officer (KO). -- 2 of 26 -- 1.5 Period of Performance The period of performance shall be a total of thirty (30) calendar days from the date of the Notice to Proceed (NTP), which includes a ten (10) day Phase-In period for administrative onboarding, security vetting, and material coordination. • Phase-In Period: 10 Days from NTP / Award Date. • Project Execution: 20 Days from the end of the Phase-In Period. 1.6 General Information 1.6.1 Quality Control Quality control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services and supplies to the government (see FAR 52.246- 1, Contractor Inspection Requirements). The contractor shall develop, implement, and maintain an effective Quality Control Plan (QCP) specific to this replacement project. The QCP shall implement standardized procedures for monitoring, verifying, and documenting contract performance to ensure all task requirements are met. The contractor’s QCP must contain a systematic approach to monitor operations to ensure acceptable workmanship. At a minimum, the project-specific QCP shall address: 1. Procedures for scheduling and coordinating the rigging, shut-down, and installation phases with the COR. 2. Discrepancy identification and immediate corrective actions. 3. Refrigerant recovery logging and EPA-mandated tracking. 4. Verification checklist for pressure testing, dehydration, and charging. 5. Methodology for collecting and addressing government feedback. Following contract award, three (3) copies of the comprehensive written QCP shall be submitted to the Contracting Officer (KO) and Contracting Officer Representative (COR) within five (5) working days for approval. 1.6.2 Quality Assurance The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is a government-only document focused on the methods the government will use to assure that the contractor has performed in accordance with the metrics in Technical Exhibit 1. -- 3 of 26 -- 1.6.3 Federal Government Holidays The contractor is not required to perform routine work on Federal holidays. If emergency or critical work is required on a holiday, it must be coordinated with the COR at least 48 hours in advance. The recognized Federal holidays are: • New Year's Day (January 1st) • Martin Luther King Jr. Day (3rd Monday of January) • Pr…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Get alerts when DEPT OF DEFENSE posts the next one

Mindy watches SAM.gov every day and emails you new notices that match what you sell — like NAICS 238220. Free daily alerts.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 238220