Skip to content

Open for responses

B422 BREAKROOM, B300 BDOC

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
W50S8R27BA002
NAICS
236220
PSC
Z2QA
Set-aside
Small Business Set Aside - Total
Posted
November 12, 2026
Response due
December 10, 2026
Place of performance
Mansfield, OH

What this opportunity is

The Department of Defense is soliciting bids for construction projects B422 Breakroom and B300 BDOC at the 179th Cyberspace Wing in Mansfield, Ohio, under NAICS code 236220. This opportunity is set aside 100% for small businesses, with a size standard of $45 million in average annual revenue. The solicitation is a total small business set-aside, and bids will be evaluated without discussions, so interested contractors should prepare to submit competitive offers by the bid opening date of December 10, 2026.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

STATEMENT OF WORK Project PBXP272019 B300 BDOC Renovation MANSFIELD LAHM ANG BASE MANSFIELD, OHIO Table of Contents 1 General Requirements 2-3 Project Description 3-5 -- 1 of 5 -- 2 1. General Requirements 1.1. The contractor shall provide all labor, supervision, materials, equipment, tools, transportation, and incidentals necessary to renovate the B300 BDOC and Battlestaff spaces, including selective demolition, wall repair, interior finish replacement, limited suspended ceiling modifications, and associated electrical and communications pathway work required to support the revised room layouts and new Government-furnished BDOC desks. 1.2. The location of the proposed work is within the main cantonment area of the Mansfield Lahm ANG Base, Mansfield, Ohio. 1.3. The contractor shall not exceed the scope of work without prior approval from the Contracting Officer. 1.4. The contractor shall protect all government property from damage. Any damages incurred in pursuance of this project shall be replaced and/or restored to original condition. 1.5. The contractor shall maintain a clean and safe job site at all times to prevent damage to other existing utilities, and surrounding facilities that may be affected; this is also intended to protect building occupants from potential health hazard associated with the proposed work. This shall include dust, debris, and waste created in performance of this project; along with tools, equipment, and vehicles located at the job site. The contractor shall comply with the provisions of the Occupational Safety and Health Act of 1972 and all provisions thereto. 1.6. The Contractor is responsible for properly laying out the work, and for lines and measurements for the work executed under the Contract Documents. 1.6.1. The Contractor, not the Government, is responsible to field verify all utilities within the project limits and/or as shown on the Drawings, before laying out the work. The Contractor is to report errors or inaccuracies in writing to the Contracting Officer's Representative before commencing work. 1.6.2. The Contracting Officer or his Representative will in no case assume the responsibility for any layout of the work or damages to existing utilities while performance of work is underway. 1.7. The Contractor shall field verify all dimensions. The dimensions provided by the Government are only approximations and they are not responsible for their precision or accuracy. This includes but is not limited to blueprints, drawings, schedules, and statements of work. 1.8. The contractor shall provide a one-year warranty for the work contained herein. They shall pass along extended guarantees for equipment and products. 1.9. All trash, waste, and construction debris generated from this project shall become property of the contractor and shall be removed from the base. The disposal of these materials shall follow the appropriate Federal and State laws. This includes the disposal or recycling of hazardous -- 2 of 5 -- 3 materials. The contractor shall report the disposition of all waste to the COR on a quarterly basis. Report shall detail weights of waste landfilled, diverted, and recycled. 1.10. Bids for this project shall be valid for 90 days. 1.11. Point of Contact for this project is Captain Clayton McCarthy at (419)-520-6158 or Mr. Joe Logan at (419)520-6051. 2. Project Description 2.1. The contractor shall provide all labor, materials, equipment, supervision, transportation, and incidentals necessary to renovate the B300 BDOC and Battlestaff spaces, including selective demolition, wall repair, interior finish replacement, ceiling modifications, and associated electrical and communications pathway work required to support the revised room layouts and new Government-furnished equipment. 2.2. BDOC 2.2.1. The contractor shall perform selective demolition in the BDOC to remove the existing controller desk, obsolete floor-fed utility components associated with the existing desk arrangement, including the existing junction box, exposed power whips, and associated miscellaneous components no longer required. 2.2.2. The existing communications floor penetration in the BDOC shall remain in place. The contractor shall coordinate with the Government regarding capping and protection of the penetration within the finished work. 2.2.3. The contractor shall prepare and repaint all BDOC wall surfaces. 2.2.4. The contractor shall prepare and repaint three (3) doors and associated frames as indicated on the drawings. 2.2.5. The contractor shall remove existing floor finishes as required and furnish and install new resilient tile flooring and new cove base throughout the BDOC. 2.2.6. The contractor shall prepare the existing floor substrate as required for the new flooring system, including removal of failed or unsuitable existing coatings where required, minor patching, leveling, adhesive removal, and localized repairs necessary for a complete installation. 2.2.7. The contractor shall provide electrical modifications in the BDOC to support the new Government-furnished controller desks, including relocation of existing floor-fed circuits to wall-mounted devices within the finished wall assembly, as indicated on the drawings. -- 3 of 5 -- 4 2.2.8. The contractor shall provide communications pathway rough-in in the BDOC for the new controller desk arrangement as indicated on the drawings. Communications cabling and termination shall be coordinated with the Government unless otherwise directed. 2.2.9. The contractor shall remove and reinstall existing wall-mounted monitors and associated mounting hardware in the BDOC at revised mounting elevations as indicated on the drawings. 2.3. Battlestaff 2.3.1. The contractor shall perform selective demolition in the Battlestaff room as required to remove obsolete or damaged finishes and accessories affected by the work, including remaining wainscot materials as indicated on the drawings. 2.3.2. The contractor shall remove an…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 236220