Skip to content

Open for responses

B422 BREAKROOM, B300 BDOC

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
W50S8R27BA002
NAICS
236220
PSC
Z2QA
Set-aside
Small Business Set Aside - Total
Posted
November 13, 2026
Response due
December 10, 2026
Place of performance
Mansfield, OH

What this opportunity is

The Department of Defense is soliciting bids for construction projects related to the B422 Breakroom and B300 BDOC at the 179th Cyberspace Wing in Mansfield, Ohio, under NAICS code 236220. This opportunity is set aside entirely for small businesses, with a project magnitude between $0.00 and $150,000. Interested contractors must register in the System for Award Management (SAM) and are encouraged to attend a site visit. Bids will be evaluated without discussions, and the bid opening is scheduled for December 10, 2026.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

PBXP272018 1 PROJECT SPECIFICATIONS For Project PBXP272018 B422 Kitchenette Renovation At 179 CYBERSPACE WING OHIO AIR NATIONAL GUARD 1947 HARRINGTON MEMORIAL ROAD MANSFIELD LAHM AIRPORT, OHIO -- 1 of 39 -- PBXP272018 2 TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 11 00 SUMMARY PART 1 GENERAL 1.1 Work Covered by Contract Documents 1.2 Work Restrictions 1.3 Occupancy of Premises 1.4 Existing Work 1.5 Government Furnished Equipment and Materials 1.6 Submittals PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) SECTION 01 20 00 PRICE AND PAYMENT PROCEDURES PART 1 GENERAL 1.1 Product Substitution Procedures 1.2 Submittals PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) SECTION 01 30 00 ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.1 Project Management and Coordination 1.2 Submittals 1.3 Construction Progress Documentation 1.4 Survey and Layout Data 1.5 Construction Progress Reporting 1.6 Submittal Procedures 1.7 Special Procedures PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) SECTION 01 33 00 SUPPLEMENTAL SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 Definitions 1.2 Submittals 1.3 Submittal Classification 1.4 Preparation 1.5 Quantity of Submittals 1.6 Information Only Submittals 1.7 Product Submittal Register 1.8 Variations 1.9 Scheduling 1.10 Government Approving Authority 1.11 Disapproved Submittals 1.12 Approved Submittals 1.13 Approved Samples PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) SECTION 01 40 00 QUALITY REQUIREMENTS PART 1 GENERAL 1.1 Abbreviations and Acronyms -- 2 of 39 -- PBXP272018 3 1.2 Reference Standards 1.3 Submittals 1.4 Quality Assurance 1.5 Quality Control 1.6 Testing and Inspecting Services 1.7 Testing Laboratory Services PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) SECTION 01 60 00 PRODUCT REQUIREMENTS PART 1 GENERAL 1.1 Submittals 1.2 Common Product Requirements 1.3 Product Options 1.4 Product Delivery Requirements 1.5 Product Storage and Handling Requirements PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) SECTION 01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS PART 1 GENERAL 1.1 Submittals 1.2 Examination and Preparation 1.3 Field Engineering 1.4 Cleaning and Waste Management 1.5 Site Maintenance 1.6 Final Cleaning 1.7 Starting and Adjusting 1.8 Closeout Procedures 1.9 Closeout Submittals 1.10 Extra Stock Materials PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) SECTION 1 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 GENERAL 1.1 Related Documents 1.2 References 1.3 Definitions 1.4 Submittals 1.5 Construction Waste Management 1.6 Meetings 1.7 Oversight 1.8 Records PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION 3.2 Construction Waste 3.3 Collection 3.4 Disposal 3.5 Hazardous Materials Waste DIVISION XXXXXXXXXX END OF TABLE OF CONTENTS -- 3 of 39 -- PBXP272018 Section 01 11 00 4 SECTION 01 11 00 SUMMARY OF WORK PART 1. GENERAL 1.1. WORK COVERED BY CONTRACT DOCUMENTS 1.1.1. The work included in this project consists of furnishing all plant, labor, materials, and equipment required to accomplish the project in strict accordance with these Specifications, the Statement of Work and the Drawings. The principal items of work include, but are not limited to: 1.1.1.1. Demolition and Removal; work locations shall be as shown on the Drawings. Perform such work required at each location with due care, including shoring, bracing, and so on. 1.1.1.2. Manufactured Articles, Materials, and Equipment; shall be applied, installed, connected, erected, used, cleaned, and conditioned as directed by the respective manufacturers, unless otherwise specified. 1.2. WORK RESTRICTIONS 1.2.1. Access to Site 1.2.1.1. Location of the work to be performed is at the 179 Cyberspace Wing, Ohio Air National Guard Base, 1947 Harrington Memorial Road, Mansfield, Ohio 44903-8049, Building #422. See attached Site Plan for the location of the existing site where the work locations are to take place at and for the other various areas on base pertinent to the job. 1.2.2. Coordination with Site Occupants 1.2.2.1. Work Schedule; shall be performed Monday through Friday, excluding Federal Holidays, unless otherwise directed or permitted by the Contracting Officer. Work shall be performed from 7:30 AM to 4:30 PM, unless otherwise directed or permitted by the Contracting Officer. 1.3. OCCUPANCY OF PREMISES 1.3.1. Building(s) will be occupied during performance of work under this Contract. Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. 1.3.2. Contractor Use of Site 1.3.2.1. During the construction period, Contractor shall have full use of the premises within the project limits as shown on the Drawings for execution of the work. Use of premises is limited only by Owner’s right to perform duties and functions as stated in the GENERAL CONDITIONS and in this section. 1.3.2.2. The Contractor, before starting any work relating to existing utilities (electrical, sewer, water, heat, gas, fire lines, etc.) that will temporarily discontinue or disrupt service to the existing facilities, will notify the Contracting Officer's Representative 72 hours in advance and obtain approval in writing before proceeding with this phase of the work. 1.4. EXISTING WORK 1.4.1. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. -- 4 of 39 -- PBXP272018 Section 01 11 00 5 1.4.2. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started. 1.5. GOVERNMENT FURNISHED MATERIAL AND EQUIPMEN…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 236220