What this opportunity is
The Department of Defense is seeking a small business to perform construction services at Offutt AFB, Nebraska, specifically for the removal and installation of entryway carpet and repainting of a curb at Building 462. This solicitation is set aside for small businesses under NAICS 236220 and requires compliance with the Davis Bacon Act for wage determinations. Interested contractors must be registered in the System for Award Management (SAM) to be eligible to submit offers by the due date of November 19, 2026.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Statement of Objectives
Date: 16 September 2026
Project title: B462 Entryway Carpet Replacement and Stripe Repainting
Objectives:
The contractor shall remove the existing damaged carpet and residual adhesive in the front
entryway of Building 462, prepare the step edge, repaint the white safety stripe, and install a
suitable non-slip commercial exterior entry mat so that the entryway is safe, functional, and
professionally finished.
General Requirements:
Project includes, but is not limited to, the following work elements. The Contractor shall furnish
all required services, labor, tools, material, and equipment necessary to complete the installation
and integration of the prime mission equipment in accordance with the approved site design and
installation plan. No alterations, additions, or deletions shall be made unless by prior approval of
the Contracting Officer (CO). All work will meet the International Building Code, UFC, UFGS,
ASME, ASTM, ETL, and any other applicable code requirement. The contractor shall maintain
the work site in a clean and orderly manner so that the safest possible site is provided for workers
and Air Force members. Work shall be completed in a neat, substantial, and competent manner.
Requirements:
1. Demo/remove current carpet:
a. 12’x12’
b. Appropriate removal of adhesive
2. Remove and repaint white step-edge marking:
a. ~60 LF
3. Install: new 10’x12’ non-slip commercial exterior entry mat that matches the existing red
color. The shorter length is to prevent weathering on the curb.
Additional General Requirements
• Ensure all construction meets federal regulations for safety standards.
• provide 1 year workmanship warranty.
• In addition, the Contractor shall be responsible for the following actions:
a. Obtaining all necessary security and safety clearances for facilities and personnel.
b. Obtaining environmental and life safety approvals.
c. Acquiring all necessary federal, state, local and base environmental and civil
engineering permits and approvals.
d. Cleaning-up and restoring the site to its original or better condition within 10 workdays
after project completion. This includes removal of any portable offices that may have been
used to support implementation of the site design at the base.
e. Repairing damage to Government property resulting from contractor activities,
-- 1 of 5 --
assuring the property is returned to its original or better condition.
f. Removing all debris at the end of each shift or more frequently if required to keep the
work area safe and useable.
g. Disposing of excess equipment and materials in accordance with General
Requirements.