What this opportunity is
The Department of Defense is seeking information for the procurement of up to twenty Electrical Hull Penetrators (EHP) as part of a Sources Sought notice issued by the Naval Surface Warfare Center, Philadelphia Division. This opportunity is open to all businesses, as there is no set-aside for small businesses. Interested vendors should submit capability statements electronically by the specified deadline, noting that this is a sources sought notice, which means it is primarily for gathering information rather than for immediate bidding.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
APPENDIX A
MINIMUM STANDARD QUALITY CONTRACT REQUIREMENTS FOR MATERIAL
PROCUREMENT, MODIFICATION, REPAIR OR OVERHAUL OF MATERIAL
NON-NUCLEAR LEVEL I MATERIAL SMICs L1, C1, S1 AND LEVEL I SUPPORT SMIC Q3, VG
QP-01/SOP-8.1 Rev (-) Page 20 of 99
Appendix A
STATEMENT OF WORK (SOW) – SECTION C REQUIREMENTS
1. Scope
1.1 The material covered in this contract will be used in a crucial shipboard system. The use
of incorrect or defective material would create a high probability of failure resulting in
serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship
itself. Therefore, the material has been designated as SPECIAL EMPHASIS material
(Level I, Scope of Certification, or Quality Assured) and special control procedures are
invoked to ensure receipt of correct material.
1.2 The Certifying Activity (CA) is the designated Level I certifying activity for all Level I
systems and associated components supplied under this contract. The contractor will
contact the CA in writing after award of contract and prior to commencement of any work
to ensure all Level I prerequisites are addressed.
2. Applicable Documents
2.1 See Statement of Work (Section C), for specific System, Equipment, Material, and
Component Drawings and References.
Note - All applicable documents will be listed in a manner which will allow positive
identification of the references and will indicate the revision/change level when the
Statement of Work (SOW) was prepared.
3. Requirements (per SEA 06P Letter, Ser 06/026, 19 June 2015)
3.1 Quality System Requirements - The Contractor furnishing items under this
contract/purchase order shall provide and maintain a quality system in accordance with
MIL-I-45208, ISO9001:2008 (except as amplified or modified herein) with the calibration
system requirements of MIL-STD-45662 or ISO10012 or ANSI-Z540.1. Quality systems
in accordance with ISO9001:2000, ISO9001:1994, or ISO9002:1994 are acceptable
alternates.
3.1.1 The Contractor's quality system and products supplied under the system are
subject to evaluation, verification inspection, and acceptance/non-acceptance by
the Government representative to determine the system's effectiveness in
meeting the quality requirements established in the Contract/Purchase Order.
3.1.2 The Contractor's quality system shall be documented and shall be available for
review by the Contracting Officer or his representative prior to initiation of
production and throughout the life of the contract. The Prime Contractor shall,
upon notification, make his facilities available for audit by the contracting
Officer or his authorized representative.
3.1.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of
Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current
documented quality system procedures to the Procurement Contracting Officer
(PCO) prior to award of any contract/purchase order. Suppliers that have a copy
of their current quality system procedures on file at the Procuring Activity may
request the PCO waive this requirement.
-- 1 of 23 --
APPENDIX A
MINIMUM STANDARD QUALITY CONTRACT REQUIREMENTS FOR MATERIAL
PROCUREMENT, MODIFICATION, REPAIR OR OVERHAUL OF MATERIAL
NON-NUCLEAR LEVEL I MATERIAL SMICs L1, C1, S1 AND LEVEL I SUPPORT SMIC Q3, VG
QP-01/SOP-8.1 Rev (-) Page 21 of 99
Appendix A
3.1.4 This contract provides for the performance of Government Quality Assurance at
source. The place or places of performance may not be changed without the
authorization of the Procurement Contracting Officer. Upon receipt of this
order, promptly notify the Government representative who normally services
your plant so that appropriate planning for Government inspection can be
accomplished. If you do not have an assigned Government representative, notify
the nearest Defense Contract Management Agency (DCMA) Office. In the event
that a local Government representative or DCMA Office cannot be located, our
purchasing agent should be notified immediately.
3.1.5 Any changes made by the Contractor to a qualified quality system will require
re-submittal to the PCO and concurrence by the Government Quality Assurance
Representative prior to adoption.
3.2 Contractor Inspection Requirements - The Contractor shall maintain adequate records of
all inspections and tests. The records shall indicate the nature and number of observations
made, the number and type of deficiencies found, the quantities approved and rejected and
the nature of corrective action taken as appropriate. Inspection records shall be traceable
to the material inspected.
3.2.1 The supplier's gages, measuring and test equipment shall be made available for
use by the Government representative when required to determine conformance
with Contract requirements. When conditions warrant, the supplier's personnel
shall be made available for operations of such devices and for verification of
their accuracy and condition.
3.2.2 All documents and reference data applicable to this contract shall be available
for review by the Government representative. Copies of documents required for
Government inspection purposes shall be furnished in accordance with the
instructions provided by the Government representative.
3.3 Subcontractor Inspection Requirements - The Government has the right to inspect at
source, any supplies or services that were not manufactured or performed within the
contractor's facility. Such inspection can only be requested by or under authorization of
the Government representative. Any purchasing documents to a subcontractor must cite
the applicable portions of the contractually invoked quality system (e.g. calibration
requirements), plus any product requirements that apply to the supplies being purchased.
When the Government elects to perform source inspection at the subcontractor's facility,
applicable purchase documents shall be annotated with the following statement: "A
Government inspection is required prior to shipment from your plant. Upon …
Source: SAM.gov, as posted. Verify the current solicitation before responding.