Skip to content

Open for responses

Common Access Card (CAC) Facility Entry Door Access Control

DEPT OF DEFENSE

Notice type
Sources Sought
Solicitation #
W50S8H27Q0003
NAICS
335999
PSC
6350
Set-aside
Small Business Set Aside - Total
Posted
November 14, 2026
Response due
November 20, 2026
Place of performance
NY

What this opportunity is

The Department of Defense is seeking small business contractors to install Common Access Card (CAC) facility entry door access controls at the Niagara Falls ARS, NY. This project, classified under NAICS 335999, involves enabling CAC access for three existing warehouse entry doors, with potential for additional work on three more doors and CCTV installation if funding allows. Interested firms should respond to the Sources Sought notice, indicating their capability to meet the requirements outlined in the Statement of Work.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

107th Attack Wing New York Air National Guard Niagara Falls, New York 14304 Project Specification For RVKQ 27-1234 Install Facility Access Controls Building 904 Logistics Readiness Squadron Supply Warehouse 30 October 2026 PROJECT MANUAL TABLE OF CONTENTS DIVISION 1- GENERAL REQUIREMENTS -01010 Summary of Work -01060 Reference Standards -01070 Abbreviations -01090 Definitions -01340 Shop Drawings Product Data and Samples -01400 Quality Control -01600 Material, Products and Equipment -01700 Project Closeout -01710 Cleaning -01720 Project Record Documents -01750 Warranties DRAWINGS SECTION 01010 SUMMARY OF WORK 1.1 RELATED DOCUMENTS: A. General provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections, apply to this Section. 1.2 PROJECT DESCRIPTION: EXISTING CONDITIONS: Building 904 is an approximately 60,000 square foot mixed use office and warehouse space facility that is home to the 107th Logistics Readiness Squadron (LRS). The warehouse section is a secure area that now requires access to personnel not organically assigned to the 107th LRS. As such, the Government now requires the contractor to install, at a minimum, all necessary electronic locks, control mechanisms, compatible door hardware, wiring, and all associated equipment to enable three existing man doors to be opened from the outside via standard Department of War (DoW) Common Access Cards (CACs) (Base Scope). In addition to the Base Scope, the facility drawing details Option work areas to include 3 CAC-enabled facility access doors as well as a Closed-Circuit Television (CCTV) monitored area of the warehouse. BASE PROJECT PART A: Determine if your door uses a fail-secure electric strike, a fail-safe magnetic lock (maglock), or an electrified mortise lock. CAC implementations typically require Wiegand or OSDP-compatible smart card readers that support PKI (Public Key Infrastructure) certificates. Plan the layout for the access control panel, power supply (12V or 24V DC), backup battery, and cable runs from the door to the network/server room. Mount the Reader: Install the CAC smart card reader at an accessible height—typically between 36 and 48 inches from the finished floor for ADA compliance. Ensure it has a clear view or is weather-protected if mounted outdoors. Install the Locking Device. For an electric strike, cut and fit the strike pocket into the metal door frame. For a magnetic lock, mount the electromagnet to the underside of the frame header and the armature plate to the door leaf. Add Auxiliary Devices: Mount a Request-to-Exit (REX) button or motion sensor on the secure side, and a door position sensor (DPS) to monitor whether the door is open or closed Run all wiring in appropriately sized schedule 40 PVC conduit. DRAWINGS INCLUDED IN CONTRACT DOCUMENTS: A. SITE PLAN AND DETAILS 1.3 CONTRACT(S): A. Construct all the Work under Job Contract Line Items (CLINs). 1.4 CONTRACTOR'S USE OF PREMISES: A. Conform Operations at the Site to Areas and Methods Permitted by: 1. Laws. 2. Ordinances. 3. Permits. 4. Contract Documents. 5. Base regulations. B. General: Limit use of the premises to construction activities in areas indicated; allow for occupancy and use by base personnel. C. Confine operations to areas within Contract limits indicated. Portions of the site beyond areas in which construction operations are indicated are not to be disturbed. D. Keep driveways and entrances serving the premises clear and available at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on site. E. Do not unreasonably encumber site with materials or equipment. F. Each Contractor/Subcontractor is responsible for protection and safekeeping of his materials, products and equipment stored on the premises or incorporated into the construction, until his contract is complete and accepted. G. Move at the Contractor's/Subcontractor's cost any stored materials, products or equipment which interfere with operations of the base. H. Existing parking lots and roadways may be used for parking construction workers vehicles, but only as directed by the Contracting Officer or his/her Contracting Officer Technical Representative (COTR). I. Provide protection to adjacent buildings and surfaces from possible damage caused by construction operations. J. Dig Permit: Obtain digging permit from the base engineer office prior to any excavation activities. Contractor shall start the permit process a minimum of 10 days prior to planned start of excavation work. END OF SECTION 01010 SECTION 01060 REFERENCE STANDARDS 1.1 "Reference Standards" are documents or publications which include requirements set by authority, custom or general consent and establishes accepted criterion. 1.2 "Reference Standards" are incorporated into the Project Manual by reference and each reference shall mean the latest edition at date of Project Manual, including amendments and supplement. 1.3 When requested deliver to the Contracting Officer an affidavit or certificate properly signed by manufacturer or supplier indicating that the material furnished conforms to the specified standards. 1.4 Reference to manufacturer's printed Specifications for specified products shall mean most current Specification on date of this Project Manual. 1.5 The Government will not provide copies of reference standards to Contractors or suppliers. It is the responsibility of the Contractor to familiarize himself with reference standards through other means. END OF S…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 335999