CRAC Units Replacement for MCE 1211 at GFAFB, ND

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
FA465927QM001
NAICS
236220
PSC
N099
Set-aside
Small Business Set Aside - Total
Posted
October 29, 2026
Response due
November 24, 2026
Place of performance
Grand Forks AFB, ND

What this opportunity is

The Department of Defense is seeking a contractor to replace and install two 8-ton Computer Room Air Conditioner (CRAC) systems at Grand Forks AFB, ND, as well as provide preventative and emergency maintenance services. This opportunity is set aside for small businesses, making it suitable for those in the 236220 NAICS category. Interested vendors should note that the notice type is a Combined Synopsis/Solicitation, indicating that they should track the opportunity closely for submission requirements rather than simply bidding.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

PERFORMANCE WORK STATEMENT FOR COMPUTER ROOM AIR CONDITIONER (CRAC) REPLACEMENT FOR MISSION CONTROL ELEMENT (MCE) 1211 GRAND FORKS AFB, ND PWS FINAL 08 OCTOBER 2026 -- 1 of 11 -- PERFORMANCE WORK STATEMENT (PWS) FOR CRAC REPLACEMENT FOR MCE 1211 319 th AMXS Grand Forks AFB, North Dakota 1. DESCRIPTION OF SERVICES 1.1. BACKGROUND: The 319 th Aircraft Maintenance Squadron (AMXS) requires the replacement of the Computer Room Air Conditioner (CRAC) system within the Mission Control Element (MCE) 1211. This environmental control system is critical to cool and regulate the temperature, humidity, and airflow necessary to protect high- value, sensitive Information Technology (IT) equipment supporting the RQ-4B Global Hawk mission. 1.2. SCOPE OF WORK: The contractor shall provide non-personal services, to include all personnel, equipment, tools, materials, and transportation to perform the complete replacement, installation, and commissioning of the CRAC system supporting MCE 1211 at building 542 on Grand Forks AFB, ND. 2. REQUIREMENTS 2.1. DECOMMISSIONING AND REMOVAL: The contractor shall safely isolate, disconnect, and remove the existing CRAC unit, to include the associated pumps and existing dry cooler that is attached to MCE 1211. 2.1.1. Off- base Disposal. The contractor shall transport and legally dispose of all existing equipment and hazardous materials, including piping, fluids, and debris, in accordance with (IAW) local, state, and federal environmental regulations at a licensed off-base disposal site (see section 6.9). The contractor shall be responsible for any permit or fees associated with the use of off-base disposal locations. 2.2. INSTALLATION AND INTEGRATION: 2.2.1. CRAC Unit Technical Specifications. The contractor shall provide and install two 8-ton CRAC units, each capable of providing multi-stage cooling capabilities. 2.2.1.1. The contractor shall configure the system to continuously maintain the MCE internal temperature between 65°F ± 5°F under normal steady-state operating conditions. 2.2.1.2. The contractor shall provide units with integrated humidification and de-humidification capabilities designed to continuously maintain a relative humidity (RH) of 45% ± 5% under normal steady-state operating conditions. 2.2.1.3. The contractor shall provide a continuous temperature and relative humidity log to the COR via email. These logs shall be submitted monthly to the COR by the 7 th business day of the following month to demonstrate continuous compliance with the required environmental thresholds. 2.2.1.4. The contractor shall configure the systems to operate utilizing a closed-loop fluid solution comprised of 40% inhibited propylene glycol and 60% Reverse Osmosis (R.O.) water. 2.2.2. Dual CRAC System Configuration. The contractor shall procure and install a redundant dual CRAC system where each unit is capable of fully independent operation. 2.2.2.1. The contractor shall configure the system to act as an automatic backup for the other unit, featuring a programmed monthly (30-day) automatic rotation of the primary/secondary designations to ensure equal runtime and wear. The system shall execute the monthly automatic rotation on the 4 th Saturday of each month. The contractor shall physically or remotely verify and log the successful automatic rotation within 24 hours of the scheduled event. Verification Logs of successful automatic rotation shall be provided to COR via email by the next business day of each monthly scheduled automatic rotation. Failure of automatic rotation shall be responded to IAW service call response times (See section 2.4.2). The contractor shall ensure the system retains automatic failover capabilities to the secondary unit in the event of a primary system fault. 2.2.2.2. The contractor shall equip each CRAC unit with separate, autonomous control systems to ensure that a failure of one control system does not impact the operational capacity of the other unit. 2.2.3. Dry Coolers, Pumps, Piping, and Ductwork. The contractor shall provide and install new dry coolers for each independent system, appropriately sized to support free-cooling operations at or below an outdoor -- 2 of 11 -- ambient dry-bulb temperature of 35°F (1.7°C). The contractor shall provide and install new, redundant pumps and piping for each CRAC system, sized IAW the Original Equipment Manufacturers (OEM) specifications. The contractor shall install all new system piping, sized IAW the equipment manufacturer’s engineering specifications. The contractor shall provide and install movable, flexible ductwork designed to allow the backup CRAC unit to be rapidly and efficiently connected to the MCE interface during failover or maintenance events to maintain ambient temperature thresholds and design loads. 2.3. TRAINING AND DOCUMENTATION: The contractor shall provide complete digital and physical copies of the OEM manuals to the COR and via email for all installed CRAC units, dry coolers, pumps, and controllers once contract has been approved. 2.3.1. Personnel Training. The contractor shall conduct comprehensive, on-site training for 319 th AMXS personnel covering scheduled preventative maintenance, routine system start/stop operations, manual failover procedures following unplanned service interruptions. In support of this training, the contractor shall provide a written training guide and operational step-by-step restoral checklists. All training materials and training documentation and physical training shall be provided to the COR via email within ten (10) days of completing the installation. 2.4. PREVENTATIVE MAINTENANCE (PM): The contractor shall perform all scheduled PM services within industry standards of the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) guidelines and OEM specifications. All PM visits must be coordinated in advance with the COR. The contractor shall submit a proposed PM visit schedule to the COR via email within ten (1…

Source: SAM.gov, as posted. Verify the current solicitation before responding.