What this opportunity is
The Department of Defense is seeking small businesses to perform smoke testing and hydro jetting for the DSCR B34 & B42 systems in Virginia. This opportunity is set aside entirely for small businesses under NAICS code 236220, which covers commercial and institutional building construction. As a combined synopsis/solicitation notice type, interested firms should prepare to submit bids rather than simply track the opportunity.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Defense Logistics Agency
DLA Installation Management Richmond
DM-FRIE
B34 and B42 DWV System Smoke Testing & Hydro Jetting
P.2026.00774
STATEMENT OF WORK (SOW)
-- 1 of 45 --
Page 2 of 45
1. OBJECTIVES
The Contractor shall provide all labor, supervision, materials, equipment, and incidentals necessary
to perform smoke testing, hydro jetting and evaluations of the drain, waste and vent system.
2. BACKGROUND
Buildings 34 and 42 has experienced an intermittent sewer odor throughout the facilities. The
Government requires a comprehensive evaluation of the Drain, Waste, and Vent system to identify
potential defects, leaks, obstructions, improper connections, and other deficiencies contributing to
the odor. No repairs are authorized under this contract. The purpose of this effort is to document the
existing condition of the entire DWV system and provide recommendations for future corrective
actions.
3. SPECIFIC REQUIREMENTS
o Perform a complete smoke test of the entire DWV systems.
o The Contractor shall introduce a non-toxic, non-staining plumbing smoke, or another
industry approved standard testing medium, into the DWV systems.
o The smoke used shall be specifically manufactured and intended for plumbing system
testing.
o If an alternative testing method is proposed, the Contractor shall obtain written approval
from the PM prior to use and demonstrate that the method provides an equivalent level of
leak detection.
o Identify and document all locations where smoke is observed.
o The Contractor shall hydro jet the entire accessible sanitary drain systems, including
horizontal mains, branch lines, building sewer and vertical stacks where practical.
o The Contractor shall perform a CCTV inspection of the entire accessible DWV systems and
provide a USB thumb drive with footage of the inspection.
o Provide a comprehensive written inspection report and a summary of smoke test findings
and a complete hydro jetting report.
o No repairs shall be performed under this contract.
o If conditions requiring repairs are identified, the Contractor shall document the deficiency
and include the location and recommend corrective action in the final report.
o Due to building occupancy, all work shall be performed after normal business hours.
o Normal business hours are between 0600-1800, Monday-Friday.
4. CONTRACTOR QUALIFICATIONS
The contractor must demonstrate a minimum of three years of documented experience in
performing work of similar scope and complexity involving commercial Drain, Waste, and Vent
systems. Experience shall include smoke testing, troubleshooting, diagnosing, and reporting DWV
systems.
5. PERIOD OF PERFORMANCE
Completion date shall be no later than 60 days after notice to proceed.
-- 2 of 45 --
Page 3 of 45
6. POINTS OF CONTACT
Project Manager (PM)/Sponsor/Contracting Officer Representative (COR)
Name: Orville R. Massey Jr. (Ramey)
Cell Phone: (804) 921-6694
Email: orville.massey@dla.mil
DLA Installation Management Richmond
6090 Strathmore Rd.
Richmond, Virginia 23237
7. PROPOSAL EVALUATION
The proposal/quote and all documentation received by the Government from the contractor before
the solicitation end date will be reviewed and evaluated based on the criteria listed below. The
submission will be deemed either technically acceptable or technically unacceptable. The contractor
is required to provide all documentation at the time of the submission and before the solicitation
end date. Failure to provide all required documents will result in the contractor’s proposal/offer
being technically unacceptable.
Technically Acceptable – meets the minimum requirement and contains no deficiencies.
Demonstrates an understanding of the services required to meet or exceed the contract
requirements. An acceptable quality level of contract performance is anticipated.
Technically Unacceptable – does not meet the minimum requirement and contains one or more
deficiencies and/or omissions. Failure to demonstrate an understanding of the services required to
meet the contract requirements. The acceptable quality level of contract performance is not
anticipated.
The following is a list of documents that shall be provided as separate PDF and/or hardcopy
documents along with the proposal:
Project narrative
• A narrative outlining the way the contractor is planning to accomplish the project
• A list of definable features of work
• Projected timeline for each DFOW
Previous relevant project experience
• Provide a minimum of 5 projects completed within the last 5 years related to this SOW
• Award amounts
• Project descriptions
• Point of Contact information including phone number and email address.
• Contract number or unique identifier
8. IMPORTANT CONSIDERATIONS
Administrative
a. Technical correspondence (where technical issues relate to compliance with the
requirements herein) will be addressed to the Contracting Officer with an information copy
to the Contracting Officer Representative/Project Manager/Facility Operations Specialist
(COR/PM).
-- 3 of 45 --
Page 4 of 45
b. The contractor awarded this contract shall always have the Quality Control system Manager
(CQC-SM) onsite when work is being performed. Onsite is defined as the actually work
location where work is being performed, not in a vehicle, trailer etc. Government employees
overseeing this project (PM, COR, Safety, etc.) reserve the right to order a stop work order
if the contractor QC manager is not onsite while work is being performed. Provide the
name(s) of the QC Manager to the PM/KO in writing (submittal required) within 10
business days of the start of work. The government will not be responsible for any
additional costs incurred by the contractor if a stop work order is issued.
c. All other correspondence, including invoices (which propose or otherwise involve waivers,
deviations or modifications to the requirements, terms, or conditions of this SOW) will be
addressed to the COR/PM with an information copy to the Co…
Source: SAM.gov, as posted. Verify the current solicitation before responding.