Electrical System Repair, Switchgear Replacement 2.0
AGRICULTURE, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
127EAW26Q0048
NAICS
238210
PSC
J061
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 7, 2026
Response due
August 7, 2026
Place of performance
CA
Description
1
US DEPARTMENT OF AGRICULTURE
STATEMENT OF WORK
ELECTRICAL SYSTEM REPAIR, SWITCHGEAR REPLACEMENT 2.0
SAN BERNARDINO NATIONAL FOREST
CALIFORNIA
Address:
San Bernardino National Forest Supervisor’s Office
602 S. Tippecanoe Ave.
San Bernardino, California 92408
-- 1 of 9 --
2
Project Title
Electrical System Repair, Switchgear Replacement 2.0
San Bernardino National Forest - Supervisor’s Office
General Information
1.0 Background and Purpose
A catastrophic arc‑flash event occurred within the bus duct connection between the Southern California
Edison (SCE) substation main feeders and the Forest Service’s 5 kV, 2000‑amp Main Distribution
Switchgear main circuit breaker point of connection. The incident was triggered by rodent intrusion, which
compromised insulation integrity and initiated the fault.
Subsequent inspection revealed that the existing switchgear was in a deteriorated and poorly maintained
condition. The arc‑flash caused extensive smoke damage to the main circuit breaker and adjacent cubicles,
and a significant number of bus support insulators were found to be damaged and require full replacement.
The overall condition of the equipment renders it unsafe, unreliable, and unsuitable for continued
operation.
The existing switchgear, due to its old age, has no records or documentation available, except for the
Single Line Diagram (SLD) of the facility. Existing panel schedules of the facility are available but not
updated
The purpose of this project is to remove the existing damaged switchgear and install a new main
distribution switchgear. The contractor shall provide all labor, materials, tools, permits, drawings, and
equipment necessary to complete the work and shall protect all existing facilities and equipment
throughout the duration of construction.
1.1 Period of Performance
The period of performance for this project shall be 365 calendar days from the date of issuance of the Notice to
Proceed (NTP). Estimated start date is 10 days after award.
2.0 Definitions
ATS - Automatic Transfer Switch
BAA - Buy American Act
BLDG. - Building
CO - Contracting Officer
COR - Contracting Officer’s Representative
ESR - Electrical Service Requirement
GACC - Geographic Area Coordination Center
IEEE - International Electrical and Electronics Engineers
LOTO - Lockout/Tagout
MV - Medium-Voltage
NEMA - National Electrical Manufacturers Association
NFPA - National Fire Protection Agency
SCE - Southern California Edison
SLD - Single Line Diagram
SOW - Statement of Work
USFS - United States Forest Service
-- 2 of 9 --
3
Contractor Requirements
3.0 Technical Requirements / Tasks
The contractor shall remove the existing outdoor 5 kV, 2000-amp main switchgear and replace it with a new,
modern metal-clad switchgear assembly.
The new assembly shall incorporate digital thermal sensors, optical detection systems, and
predictive - analytics - based condition monitoring to enhance operational safety, reliability, and efficiency.
These technologies shall provide real-time fault detection, equipment health diagnostics, and automated alerts to
support proactive maintenance and reduce system downtime.
The contractor is solely responsible for all utility coordination, shutdown approvals, and power restoration with
the Southern California Edison (SCE).
3.1 Statement of Work (SOW)
3.1.1 Pre-Construction Assessment and Full Replacement of old switchgear
a. Inspect and evaluate the existing system including all existing electrical drawings, single line
diagram and electrical infrastructure of the facility.
b. There are no documented records of the old switchgear including three-line electrical drawings
and control schemes.
c. The new switchgear shall meet current safety and capacity requirements of the existing
facility load.
3.1.1.2 Comprehensive Power System Engineering Study and Analysis
i. Provide comprehensive power-system engineering studies to ensure safety, reliability, and full
regulatory compliance. Required analyses include a Short-Circuit Analysis, Protective Device
Coordination Study, and Arc Flash Hazard Analysis.
ii. In addition, the contractor shall perform load-flow analysis, ground-grid design verification, and
physical space and clearance assessments to confirm that the new equipment will integrate safely
and effectively with existing site conditions. All engineering work shall be performed, signed, and
sealed by a Professional Electrical Engineer (Power) licensed in the State of California.
iii. Safely disconnect and subsequently reconnect both emergency generators, including the
associated step-down transformer, automatic transfer switch, and all feeder and control cabling
serving the building. All work shall be performed in a manner that maintains system integrity,
protects critical loads, and ensures compliance with applicable electrical safety standards.
iv. The contractor shall complete all disconnection activities prior to removal of the existing
switchgear and shall perform all reconnection, testing, and functional verification following
installation of the new switchgear. Coordination with the local forest unit with the connection and
disconnection of the prime generator is mandatory to ensure proper sequencing, operational
continuity, and adherence to site-specific requirements.
-- 3 of 9 --
4
3.1.2 Demolition, Abatement, Removal and Disposal of Hazardous Materials
a. Disconnect, remove, and properly dispose of the existing 5-kV, 2000-amp switchgear assembly,
including all associated components. If required, perform asbestos abatement for legacy
materials such as sealants, insulation, and cables. Prior to any disturbance of suspect materials,
the contractor shall conduct hazardous material sampling and testing. If hazardous materials are
identified, contact the Contracting Officer prior to any abatement/removal work. All abatement
shall be performed in full compliance with applicable State and Federal regulations. All
hazardous materials shall be classified, handled, packaged, tra…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238210)
Z1DA--Project No. 552-26-202 - Replace Overhead Paging System
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 5, 2026
HELENA NATIONAL FOREST - Solar System Install on Existing Well
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 6, 2026
US Coast Guard Air Station Savannah Generator
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 19, 2026
FY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 29, 2026
N--MORA LONGMIRE FIBER INSTALL
INTERIOR, DEPARTMENT OF THE · Solicitation · due August 18, 2026
1788 - Hanscom AFB HNJ Lundy AV Upgrade
DEPT OF DEFENSE · Solicitation · due August 21, 2026