N--MORA LONGMIRE FIBER INSTALL
INTERIOR, DEPARTMENT OF THE
Notice type
Solicitation
Solicitation #
140P8326Q0056
NAICS
238210
PSC
N059
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
July 23, 2026
Response due
August 18, 2026
What this opportunity is
The Department of the Interior is soliciting bids for the installation of fiber conduit at Mount Rainier National Park, specifically the Longmire area. This project is set aside for Service-Disabled Veteran-Owned Small Businesses, making it suitable for eligible small firms in this category. Interested contractors should note that this is a solicitation notice, indicating that they can submit proposals to compete for the contract.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
L-209
L-229
L-154
L-138
L-202
L-205
L-210
L-214
L-101
L-006
L-215
L-201
L-211
L-212
L-119
L-136
L-135 L-155
L-236
L-118
L-203
L-208
L-213
L-221
L-678
L-120
L-010
L-207
L-159
L-206
L-216
L-678
1x2" Stub-up
at Water
Lab (L678)
Connect to Existing
2" to Water Plant
(approx 50-100 feet)
Section
3 (new
1x3")
Section 2
(new 1x3")
Section 1
(new 1x3")
Section 2
(existing
1x2")
Existing path
to Water Plant
Vault 1
(existing,
EOC)
Vault 2
(RoadBore
West)
Vault 3
(RoadBore
East)
Vault 4
(Water Lab) Vault 5
(Bridge
South)
Vault 6
(unknown
location)
Vault 7 (existing,
Community Building)
Vault 8 (new)
Microsoft, Vantor, Park Tiles Team
Legend
Handholes
Existing Handhole
New Handhole
Conduit Path
1x3" Conduit - NEW
1x2" Conduit -
EXISTING
1x2" Conduit - NEW
Trees
Longmire Structures
Roads and Paths
TYPE
Path Path
Road Road
Trails
Section 1 Section 2
Section 3
National Park Service
Mount Rainier National Park
Longmire Conduit Installation Project
SOW APPENDIX A
PROJECT OVERVIEW MAP
´
-- 1 of 5 --
L-209
L-119
L-136
L-155
L-118
L-208
L-678
L-207
L-206
L-216
1x2" Stub-up
at Water
Lab (L678)
Section 2
(new 1x3")
Section 1
(new 1x3")
Section 1
(new 1x3")
Vault 1
(existing,
EOC)
Vault 2
(RoadBore
West) Vault 3
(RoadBore
East)
Vault 4
(Water Lab)
Microsoft, Vantor, Park Tiles Team
Legend
Handholes
Existing Handhole
New Handhole
Conduit Path
1x3" Conduit - NEW
1x2" Conduit -
EXISTING
1x2" Conduit - NEW
Trees
Longmire Structures
Roads and Paths
TYPE
Path Path
Road Road
Trails
National Park Service
Mount Rainier National Park
Longmire Conduit Installation Project
SOW APPENDIX A - PROJECT MAP
SECTION 1: L-216 (EOC) to L-678 (Water Lab)
Paved
Paved Gravel
-- 2 of 5 --
L-678
1x2" Stub-up
at Water
Lab (L678)
Section 2
(existing
1x2")
Section 1
(new 1x3")
Section 2
(new 1x3")
Section 2
(new 1x3")
Section 2
(new 1x3")
Vault 4
(Water Lab)
Vault 5
(Bridge
South)
Vault 6
(unknown
location)
Microsoft, Vantor, Park Tiles Team
Longmire
Suspension
Bridge
Legend
Handholes
Existing Handhole
New Handhole
Conduit Path
1x3" Conduit - NEW
1x2" Conduit -
EXISTING
1x2" Conduit - NEW
Trees
Longmire Structures
Roads and Paths
TYPE
Path Path
Road Road
Trails
National Park Service
Mount Rainier National Park
Longmire Conduit Installation Project
SOW APPENDIX A - PROJECT MAP
SECTION 2A: L-678 (Water Lab) to
L-006 (Community Building)
Paved
Paved
Gravel
Transition
Under
Bridge
Paved
-- 3 of 5 --
L-229
L-138
L-210
L-006
L-236
L-213
L-010 L-216
Section 2
(new 1x3")
Section 3
(new 1x3")
Section 2
(existing
1x2")
Section 2
(existing
1x2")
Vault 6
(unknown
location)
Vault 7 (existing,
Community Building)
Microsoft, Vantor, Park Tiles Team
Legend
Handholes
Existing Handhole
New Handhole
Conduit Path
1x3" Conduit - NEW
1x2" Conduit -
EXISTING
1x2" Conduit - NEW
Campground Features
Fire Pit Fire Pit
Food Storage Food Storage
Hydrants Hydrants
Picnic Tables Picnic Tables
Trash Cans Trash Cans
Water Spigots Water Spigots
Trees
Longmire Structures
Roads and Paths
TYPE
Path Path
Road Road
Trails
National Park Service
Mount Rainier National Park
Longmire Conduit Installation Project
SOW APPENDIX A - PROJECT MAP
SECTION 2B: L-678 (Water Lab) to L-006
(Community Building)
Paved
Paved
Gravel
Paved
-- 4 of 5 --
L-006
Connect to Existing
2" to Water Plant
(approx 50-100 feet)
Section 2
(existing
1x2")
Existing path
to Water Plant
Section 3
(new 1x3")
Section 3
(new 1x3")
Vault 7 (existing,
Community Building)
Vault 8 (new)
Microsoft, Vantor, Park Tiles Team
Legend
Handholes
Existing Handhole
New Handhole
Conduit Path
1x3" Conduit - NEW
1x2" Conduit -
EXISTING
1x2" Conduit - NEW
Trees
Longmire Structures
Roads and Paths
TYPE
Path Path
Road Road
Trails
National Park Service
Mount Rainier National Park
Longmire Conduit Installation Project
SOW APPENDIX A - PROJECT MAP
SECTION 3: L-006 (Community
Building) to Vault 8 (Water Plant
Road Intersection)
Paved
Gravel
-- 5 of 5 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238210)
HELENA NATIONAL FOREST - Solar System Install on Existing Well
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 6, 2026
Z1DA--Project No. 552-26-202 - Replace Overhead Paging System
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due August 5, 2026
US Coast Guard Air Station Savannah Generator
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 19, 2026
Z1DZ--695-22-123 Upgrade N Campus Medium Voltage Feeders
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due July 22, 2026
1788 - Hanscom AFB HNJ Lundy AV Upgrade
DEPT OF DEFENSE · Solicitation · due August 21, 2026