N--MORA LONGMIRE FIBER INSTALL

INTERIOR, DEPARTMENT OF THE

Notice type
Solicitation
Solicitation #
140P8326Q0056
NAICS
238210
PSC
N059
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
July 23, 2026
Response due
August 18, 2026

What this opportunity is

The Department of the Interior is soliciting bids for the installation of fiber conduit at Mount Rainier National Park, specifically the Longmire area. This project is set aside for Service-Disabled Veteran-Owned Small Businesses, making it suitable for eligible small firms in this category. Interested contractors should note that this is a solicitation notice, indicating that they can submit proposals to compete for the contract.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

L-209 L-229 L-154 L-138 L-202 L-205 L-210 L-214 L-101 L-006 L-215 L-201 L-211 L-212 L-119 L-136 L-135 L-155 L-236 L-118 L-203 L-208 L-213 L-221 L-678 L-120 L-010 L-207 L-159 L-206 L-216 L-678 1x2" Stub-up at Water Lab (L678) Connect to Existing 2" to Water Plant (approx 50-100 feet) Section 3 (new 1x3") Section 2 (new 1x3") Section 1 (new 1x3") Section 2 (existing 1x2") Existing path to Water Plant Vault 1 (existing, EOC) Vault 2 (RoadBore West) Vault 3 (RoadBore East) Vault 4 (Water Lab) Vault 5 (Bridge South) Vault 6 (unknown location) Vault 7 (existing, Community Building) Vault 8 (new) Microsoft, Vantor, Park Tiles Team Legend Handholes Existing Handhole New Handhole Conduit Path 1x3" Conduit - NEW 1x2" Conduit - EXISTING 1x2" Conduit - NEW Trees Longmire Structures Roads and Paths TYPE Path Path Road Road Trails Section 1 Section 2 Section 3 National Park Service Mount Rainier National Park Longmire Conduit Installation Project SOW APPENDIX A PROJECT OVERVIEW MAP ´ -- 1 of 5 -- L-209 L-119 L-136 L-155 L-118 L-208 L-678 L-207 L-206 L-216 1x2" Stub-up at Water Lab (L678) Section 2 (new 1x3") Section 1 (new 1x3") Section 1 (new 1x3") Vault 1 (existing, EOC) Vault 2 (RoadBore West) Vault 3 (RoadBore East) Vault 4 (Water Lab) Microsoft, Vantor, Park Tiles Team Legend Handholes Existing Handhole New Handhole Conduit Path 1x3" Conduit - NEW 1x2" Conduit - EXISTING 1x2" Conduit - NEW Trees Longmire Structures Roads and Paths TYPE Path Path Road Road Trails National Park Service Mount Rainier National Park Longmire Conduit Installation Project SOW APPENDIX A - PROJECT MAP SECTION 1: L-216 (EOC) to L-678 (Water Lab) Paved Paved Gravel -- 2 of 5 -- L-678 1x2" Stub-up at Water Lab (L678) Section 2 (existing 1x2") Section 1 (new 1x3") Section 2 (new 1x3") Section 2 (new 1x3") Section 2 (new 1x3") Vault 4 (Water Lab) Vault 5 (Bridge South) Vault 6 (unknown location) Microsoft, Vantor, Park Tiles Team Longmire Suspension Bridge Legend Handholes Existing Handhole New Handhole Conduit Path 1x3" Conduit - NEW 1x2" Conduit - EXISTING 1x2" Conduit - NEW Trees Longmire Structures Roads and Paths TYPE Path Path Road Road Trails National Park Service Mount Rainier National Park Longmire Conduit Installation Project SOW APPENDIX A - PROJECT MAP SECTION 2A: L-678 (Water Lab) to L-006 (Community Building) Paved Paved Gravel Transition Under Bridge Paved -- 3 of 5 -- L-229 L-138 L-210 L-006 L-236 L-213 L-010 L-216 Section 2 (new 1x3") Section 3 (new 1x3") Section 2 (existing 1x2") Section 2 (existing 1x2") Vault 6 (unknown location) Vault 7 (existing, Community Building) Microsoft, Vantor, Park Tiles Team Legend Handholes Existing Handhole New Handhole Conduit Path 1x3" Conduit - NEW 1x2" Conduit - EXISTING 1x2" Conduit - NEW Campground Features Fire Pit Fire Pit Food Storage Food Storage Hydrants Hydrants Picnic Tables Picnic Tables Trash Cans Trash Cans Water Spigots Water Spigots Trees Longmire Structures Roads and Paths TYPE Path Path Road Road Trails National Park Service Mount Rainier National Park Longmire Conduit Installation Project SOW APPENDIX A - PROJECT MAP SECTION 2B: L-678 (Water Lab) to L-006 (Community Building) Paved Paved Gravel Paved -- 4 of 5 -- L-006 Connect to Existing 2" to Water Plant (approx 50-100 feet) Section 2 (existing 1x2") Existing path to Water Plant Section 3 (new 1x3") Section 3 (new 1x3") Vault 7 (existing, Community Building) Vault 8 (new) Microsoft, Vantor, Park Tiles Team Legend Handholes Existing Handhole New Handhole Conduit Path 1x3" Conduit - NEW 1x2" Conduit - EXISTING 1x2" Conduit - NEW Trees Longmire Structures Roads and Paths TYPE Path Path Road Road Trails National Park Service Mount Rainier National Park Longmire Conduit Installation Project SOW APPENDIX A - PROJECT MAP SECTION 3: L-006 (Community Building) to Vault 8 (Water Plant Road Intersection) Paved Gravel -- 5 of 5 --

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238210)