What this opportunity is
The Department of Defense is soliciting proposals for a 5-Year Firm-Fixed Price (FFP), hardware, Indefinite Quantity (IDIQ) contract for various cable and conduit assemblies, with a total Best Estimated Quantity (BEQ) of 450 units across multiple National Stock Numbers (NSNs). This opportunity is open to all business types, as there is no set-aside. Interested vendors should note that the solicitation type requires tracking for submission rather than bidding, and they should refer to the attached amendment for updated details and requirements.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
TECHNICAL REQUIREMENTS DOCUMENT
CABLES ASSEMBLYS, CONDUITS, AND REEL
FOR THE ELECTRIC POWER PLANT III
TABLE OF CONTENTS
INTRODUCTION……………………………………………………………………………………………… 4
APPLICABLE DOCUMENTS 4
CONFIGURATION BASELINE 4
Obsolescence Management Requirements / Obsolete Components and Materials 5
Part Revisions 5
SPECIAL INSTRUCTIONS 6
PACKAGING 9
Wood Packing Material 9
Military Packaging 9
CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1 11
CDRL List 11
Individual CDRLs 11
INTRODUCITON:
The Defense Logistics Agency-Aberdeen, on behalf of the Army Integrated Logistics Supply Center (ILSC), intends to acquire Parts to support the Electric Power Plant (EPP) III. The EPP III is the main electric power source for the PATRIOT Missile Defense System, and the selected parts have been identified for maintenance and sustainment purposes. The parts consists of various cables, conduits, and a reel on which cabling sits. These cables are used between the Power Distribution Unit to the Generator Sets.
APPLICABLE DOCUMENTS
Military and Federal Standards
MIL-STD-130N w/Change 1
Identification Marking of U.S. Military Property
MIL-STD-129R w/Change 3
Military Marking for Shipment and Storage
MIL-STD-2073-1E w/ Change 4
Standard Practice for Military Packaging
Military and Federal Specifications
N/A
Other Documents
Commercial Documents
ISPM Number 15
Regulation of Wood Packaging Material in International Trade
ANSI/TA-STD-0016
Standard for Preparing a Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan
ANSI/ISO/ASQ(E)Q 9001-2015
American National Standard, Quality Management Systems-Requirements
Security Documents
CECOM G2
Antiterrorism/OPSEC /Security Cybersecurity Review Cover Sheet
CONFIGURATION BASELINE
The applicable Configuration Baselines (CB), for the listed Configuration Item (CI) and/or Computer Software Configuration Item (CSCI), are as listed in the table below.
NSN
Nomenclature
Part Number
6150-12-343-3731
CABLE ASSEMBLY,SPEC
180.01.0501
6150-12-343-3732
CABLE ASSEMBLY,SPEC
180.01.0504
6150-12-343-3733
CABLE ASSEMBLY,SPEC
180.01.0058
6150-12-343-3734
CABLE ASSEMBLY,SPEC
180.01.0502
6150-12-343-3735
CABLE ASSEMBLY,SPEC
180.01.0503
6150-12-343-3736
CABLE ASSEMBLY,SPEC
180.01.0050
6150-12-343-3737
CABLE ASSEMBLY,SPEC
180.01.0505
6150-12-343-3738
CABLE ASSEMBLY,SPEC
180.01.0148
6150-12-343-3739
CABLE ASSEMBLY,SPEC
180.01.0149
5975-12-343-4086
CONDUIT ASSEMBLY
115.02.0016
5975-12-343-4089
CONDUIT ASSEMBLY
115.02.0010
8130-12-358-4625
REEL CABLE
480.02.0047
5945-01-577-2614
RELAY, HYBRID
335.01.0040
5975-12-343-4088
CONDUIT ASSEMBLY
115.02.0006
Obsolescence Management Requirements / Obsolete Components and Materials
Part Revisions
Departures from Configuration Baseline (CB). No changes or departures from the CB are acceptable except for changes or departures which are submitted in accordance with DI-MISC-80711A and are approved by the Government Configuration Manager (C Mgr.) or Configuration Management Officer (CMO) and which are made applicable to the contract by the PCO. Configuration Control shall be affected by the Configuration Control Documents (CCDs) as follows:
Engineering Change Proposal (ECP) includes both the engineering change and the supporting documentation by which the change is described and suggested. An ECP describes changes to the CI/CSCI and associated Government documents and data that are affected by the proposed engineering change.
A Notice of Revision (NOR) shows the detailed changes that must be made to technical documentation, except specifications, (one NOR per document) following approval of an ECP. The NOR is submitted as part of the ECP and is used to determine any Technical Manual (TM) impacts. The Government must be notified of any part changes in order to update the proper TMs.
A Specification Change Notice (SCN) is used to delineate the exact change(s) in a specification that will be distributed to users when the ECP is approved. The SCN is submitted as part of the ECP. The SCN is not used for a military or federal document, only a Request for Waiver can be used for those documents.
Value Engineering Change Proposal (VECP) is the same as an ECP except there are proposed cost savings for the program. The contractor shall follow the guidance in Section I of this contract for VECPs.
Request for Waiver (RFW) describes a departure from configuration documentation for a specific number of units or period of time. Contractor shall identify the impact of the RFW on performance, operational readiness and logistics support of the affected CIs. The Government will require compensation for any RFW.
Contractor shall provide all supporting program or cost data with the CCD. The contractor shall uniquely and sequentially identify (including the use of the contract number) each ECP, VECP, NOR, SCN or RFW. The identification number should use less than 16 characters.
Identification of Authorized Personnel. The contractor shall identify to the PCO, Administrative Contracting Officer (ACO), and the technical office identified on the DD Form 1423 for DI-MISC-80711A, the name(s) of the official(s) of its organization who are authorized to submit CCDs 30 Days after Contract (DAC).
Documentation. The contractor shall document by serial number each products configuration, applicable documentation, maintenance support requirements and spares in relation to the contractor’s configuration baseline. The data in use shall be available for government review and use.
Use of CB Data. The contractor shall assure that all necessary contractor’s activities have access to and use of the contractually specified configuration baseline(s), approved changes and departures, and effectivity data. The data in use shall be available for govern…
Source: SAM.gov, as posted. Verify the current solicitation before responding.