Skip to content

Open for responses

F--A34 STOCKPILE REMOVAL

INTERIOR, DEPARTMENT OF THE

Notice type
Sources Sought
Solicitation #
140RR027Q0050
NAICS
562910
PSC
F108
Posted
November 17, 2026
Response due
November 30, 2026

What this opportunity is

The Department of the Interior's Bureau of Reclamation is seeking sources for the removal and disposal of a stockpile containing asbestos cement pipe and associated materials. This opportunity falls under NAICS 562910, which is suitable for small businesses with fewer than 1,000 employees. As this is a sources sought notice rather than a formal solicitation, interested parties should submit capability statements to demonstrate their qualifications, as no contract will be awarded at this stage. Contractors must also be registered in SAM.gov to participate.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Attachment 1 1 Yuma Area Office Statement of Work A34 Stockpile Removal PART I – GENERAL INFORMATION A. BACKGROUND The mission of Bureau of Reclamation (BOR) is to manage, develop, and protect water and related resources in an environmentally and economically sound manner and in the interest of the American public. BOR has ownership of land containing pieces of broken asbestos-cement pipe located in Yuma County, AZ. The land has been used as a gravel stockpile yard for many years as a central location to Yuma Area Office (YAO) water system facilities. The current scope requires the Contractor to collect, haul, and dispose of all material from the designated stockpile, which includes asbestos cement pipe (ACP), to an appropriate waste facility. Contractor will provide certified personnel to verify complete ACP removal at the site. B. LOCATION The abatement work required is located on BOR property along the Salinity Canal in Yuma County, AZ. Major cross streets are S Avenue 4-1/2E and E Levee Rd. Refer to the Project Location Map included in the Appendix Part C. Contractor is allowed to stage within the fenced stockpile yard and daisy chain a lock on the gate. Contractor shall: not obstruct Reclamation maintenance staff from continuing work activities within the yard. Reclamation’s normal operating hours are Monday through Friday 6:00AM to 4:00PM. Contractor shall notify government representative when accessing the site for both normal and after hours. Gate shall remain closed and locked after departure. C. SITE CONDITION The weather in Yuma County is typical of the desert southwest. Annual highs and lows range from about 120 to 30 degrees Fahrenheit, with intraday variations of up to 50 degrees. Late fall and winter temperatures are generally mild with a slight possibility of freezing during the late winter months. Strong winds and dust storms are possible throughout the year but are generally experienced during the spring months. Thunderstorms and flash floods are also possible during the “monsoon” season which generally occurs during the late summer months (August and September). Rain is also possible during the late winter and early spring months. Average yearly rainfall for the Yuma area is approximately 3 inches. -- 1 of 9 -- Attachment 1 2 The Contractor shall acquaint themselves with the current condition of the site which includes, but is not limited to access roads, local utilities, and on-site materials. Project site is accessible from existing public roads and government maintenance roads. Overhead and underground utilities may be present near to, paralleling, or crossing existing reclamation drainage facilities. In addition to utilities, there are drainage wells and the associated discharge lines and miscellaneous farm equipment crossings. PART II – OBJECTIVE A. SUMMARY The contract objective is to remove and legally dispose of all debris and material in the designated stockpile, plus 8 inches of soil beneath the pile is to be over-excavated, removed, and legally disposed of. Post-removal sampling of soil to verify no asbestos contamination. If asbestos is found above background over excavate only what is necessary. To ensure the safety of all employees involved is paramount. B. PERFORMANCE PERIOD Performance period for the work under the Yuma Asbestos Abatement project will be for 180 calendar days from the date of receipt of a Notice-of-Award. PART III – REQUIREMENT A. DEFINITIONS Load, and haul: This work shall consist of loading all material from the designated stockpile, to be legally disposed of at an approved landfill or treatment, storage, and disposal facility (TSDF). Legal Disposal: Disposition of debris hauled off site and onto an approved disposal (landfill) area in accordance with Local, County, State, and Federal regulations. Backfilling: Using on site soil material to fill any holes left by ACM removal process and generally smoothing out the affected area afterwards to match adjacent existing grade. B. PROJECT DESCRIPTION 1. Mobilization/demobilization. Mobilize all personnel and equipment necessary to perform debris removal, including ACP at the work area in accordance with Reclamation Safety and Health Standards (RSHS) and the Occupational Safety and Health Administration (OSHA) standards. When work is complete the Contractor shall fully vacate the site removing all equipment and materials used in or resulting from the work. 2. Load, process, haul, and legally dispose of ACP and other debris, and over- excavated soil at an approved disposal landfill. -- 2 of 9 -- Attachment 1 3 a. The contractor will prepare a site-specific Asbestos Abatement Plan (AAP). b. No permits are expected. Follow all federal, state, county, and local regulations applicable to asbestos work. c. ACP was previously removed from the site, but some small pieces still remain. d. Hauling of materials from the site shall be done in accordance with all applicable guidelines, and no loss of material in route is permitted. 3. Verify the complete removal of ACP from the site and provide results to the Yuma Area Office Contracting Officer’s Representative (COR). Supply a Certified Asbestos Inspector to conduct final visual inspections, add soil sampling and testing of the remaining area for verification in conjunction with the COR. The same person shall confirm the complete removal of all ACM from the site. 4. Since less than one acre of disturbance is anticipated, it is assumed that a Storm Water Pollution Prevention Plan (SWPPP) is not needed, and that no waiver is needed. 5. Furnish all the documentation of disposal for all materials that are to be hauled and disposed of offsite. Documentation shall consist of but is not limited to Government documentation Form E Waste Diversion Table, hazardous waste manifests, haul tickets, and documentation from landfill. Provide a copy of all hazardous waste and non- hazardous waste manifests to the COR within the allowed period after hauling …

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 562910