Description
Performance Work Statement
Remediation, Gasoline Underground Storage Tank (UST) Site,
Former Putah Creek
November 13, 2026
1.0 General Description
This is a non-personal services contract to remediate contaminated soil and groundwater at the
Former Putah Creek Resort (Site) located at 7600 Knoxville Road in Napa County, California.
The Government shall not exercise any supervision or control over the contract service providers
(i.e. subcontractors) performing the services. Such contract service providers shall be
accountable solely to the Contractor who, in turn, is accountable to the Government.
2.0 Background
A Corrective Action Plan (CAP, Att. 1) was prepared under purchase order R15PX00826 and
approved by the Central Valley Regional Water Quality Control Board (CVRWQCB).
3.0 Period of Performance
Base Year March 15, 2027, to March 14, 2028
Option Year 1 March 15, 2028, to March 14, 2029
Option Year 2 March 15, 2029, to March 14, 2030
Option Year 3 March 15, 2030, to March 14, 2031
Option Year 4 March 15, 2031, to March 14, 2032
This project will be for 5 years, and has a base period of 1 year, with four, 1-year, option years.
Option years will be exercised as needed to accomplish the remediation efforts and site closure.
4.0 Government Furnished Property, Equipment, and Services: NONE
5.0 Contractor Furnished Items and Services
The Contractor shall provide all equipment, supplies, management, supervision, personnel, and
transportation except as specified herein as government-furnished, necessary to assure that all
services are in accordance with the contract and all applicable laws and regulations. The
contractor shall ensure all work meets performance standards specified in this Performance Work
Statement (PWS).
6.0 Site Access
The Contractor shall allow subcontractors access to the Site for work on groundwater monitoring
and remediation as required by Technical Reporting Order, aka Monitoring and Reporting Order
(MRP) R5-2012-0800 (Att. 2), pursuant to Cleanup and Abatement Order R5-2009-0704 (Att.
3). The Contractor shall carry out all future groundwater monitoring and remediation work at the
Site.
-- 1 of 6 --
There will be development activities taking place by Park Concessionaires in the vicinity of the
Site. The Concessionaire must be allowed access to the existing concrete pad and the Above
ground Storage Tank (AST) for fuel vending and storage. Ongoing coordination between the
Contractor, Reclamation, and Concessionaire shall be provided to ensure fuel distribution
operations do not interfere with the cleanup project.
7.0 Specific Tasks
The Contractor shall implement the Corrective Action Plan that has been approved by the
CVRWQCB. This includes all tasks and requirements stated within the CAP. Pending
authorization from the CVRWQCB, this may include rebound testing and the next actions
needed to achieve site closure, in addition to monitoring, reporting and any remaining
remediation.
A. Soil Vapor Extraction (SVE)/Air-Sparging (AS) System Operation: This task
includes oversight of the remediation system, including operation and maintenance.
The Contractor shall perform site visits on a weekly basis (at minimum) or as outlined in
a future Final Remediation Plan during the period of operations. The Contractor shall
provide all materials, parts, labor and utility operations needed to ensure the remediation
system operates at least 95 percent of the time, at no additional cost to the Government.
The Contractor shall take care that consumables, such as activated carbon, are
replenished well before they are expended and no longer effective.
The Contractor shall take note of high-wear parts and plan to replace them before the end
of their service life, to minimum system down-time.
B. Groundwater Performance and Regulatory Monitoring: The Contractor shall perform
periodic groundwater monitoring (monitoring) required by the wastewater (NPDES)
permit and as required by the Monitoring and Reporting Order R5-2012-0800.
Note: during monitoring, a few surface water samples shall be collected in addition to the
groundwater samples and are thus included in this sampling regime. Laboratory analysis
of the above water samples shall be performed by a California-certified laboratory, such
as ELAP certification.
This laboratory shall use analytical methods that are specified in the CAP or are in
accordance with updated state regulations, all of which shall be EPA Federal Reference
Methods or EPA Approved Standard Methods.
Monitoring shall be performed on a quarterly basis, with a transition to a semiannual or
other monitoring regime when directed by CVRWQCB.
Each monitoring event shall include sampling 19 or more monitoring wells and 2 or more
surface water samples from Lake Berryessa, per the direction of the CVWRQCB.
-- 2 of 6 --
Groundwater samples shall be analyzed for site constituents of concern and for indicators
of biodegradation, aka Monitored Natural Attenuation, parameters.
Surface water samples shall be analyzed for site constituents of concern. Through the
course of groundwater monitoring and SVE/AS system operation, wastewater called
Investigation-Derived Waste (IDW) will be generated. The Contractor shall characterize
and dispose of this IDW in compliance with State permits, such as transport permits and
disposal in a permitted wastewater facility.
C. Regulatory compliance: As part of the remedial effort, routine regulatory reporting shall
be included by the Contractor under previous tasks above.
This regulatory responsibility will belong to the Contractor by Agent designation for as
long as cleanup contract is active.
During operation of the SVE/AS system, monthly air emissions testing shall be
performed, and the data shall be reported to the Bay Area Air Quality Management
District (BAAQMD) under a permit established by the Contractor with the BAAQMD.
Current reporting and monitoring efforts are specified in the technical reporting order R5-
2012-0800, referred to as t…