The Department of Defense is hosting an Industry Day on December 9, 2026, to gather feedback on sustaining the Halvorsen Aircraft Loader (ACL) system, which includes services such as overhaul, field support, engineering support, program management, and data management for approximately 500 units at 170 locations. This opportunity is open to all businesses, as there is no set-aside for small businesses. Interested companies should note that this is a Special Notice, indicating they should track the event for potential future bidding opportunities rather than submitting proposals at this stage.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Performance Work Statement
for
Halvorsen Aircraft Cargo Loaders Sustainment
Purchase Request: FD2060-__-_____
__________
Date QAPC signs QASP.
-- 1 of 27 --
1.0 Description of Services
1.1 Objectives: This Performance Work Statement (PWS) describes the services required for the
sustainment of the Halvorsen Aircraft Cargo Loader (ACL) of approximately 170 worldwide
locations. These services include Overhaul, Field Support, Engineering Support, Program
Management, and Data Management.
1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the United States
Air Force (USAF) by sustaining a fleet of approximately 500 Halvorsens by providing overhaul,
parts support, engineering support, and field support ensuring continuous support of worldwide
cargo movement.
1.3 Background: The Halvorsen ACL is a key link in the USAF global mobility capability. There
are approximately 500 Halvorsens at approximately 170 worldwide locations. The Halvorsen is a
three (3) pallet position, 25,000lb loader that supports tactical cargo loading missions.
Halvorsens are extensively used in support of Overseas Contingency Operations (OCO) and
humanitarian relief missions.
2.0 Services Summary: The following table summarizes the performance thresholds for the
most critical performance objectives of this effort.
Performance Objective PWS
Reference
Performance Threshold
Quality of Contract Data
Requirements List
(CDRL) deliverable
4.2.1 There shall be no more than one rejection of
any deliverable. There shall be no more than
three (3) total rejection(s) of deliverables
per contract year. The Government will reject
a deliverable if three (3) or more technical
errors or ten (10) or more minor errors are
found within the deliverable. The rejected
deliverable shall be corrected and resubmitted
within fifteen (15) business days of
notification of Government rejection.
Receipt of CDRL
deliverable
4.2.2 There shall be no more than two (2) late
submissions of deliverables per contract
year. The Contractor shall notify the
Government at least five (5) working days
prior to due date if the delivery of any
data/document will not meet the scheduled
delivery date and negotiate a revised
delivery date. The data/document shall be
delivered by the revised delivery date
acceptable to the Government.
Delivery of Overhauled
Loaders
4.6.6 The Contractor shall complete early or on
schedule 100% of the overhaul deliveries in
accordance with the task order baseline
-- 2 of 27 --
schedule. The Contractor shall notify the
Government if the delivery of any asset will
not meet the scheduled delivery date and
negotiate a revised delivery date. The late
asset shall be delivered by the revised
delivery date acceptable to the Government.
The Contractor shall have no more than 20
loaders in work (i.e., inducted into the
overhaul line) at any one time. The period
of performance for the basic ordering period
shall not exceed 24 months. The period of
performance annual buy for full-rate
overhauls for ordering periods 1-4 of the
contract shall not exceed 18 months. The
time between the delivery dates of the first
loader inducted into the overhaul line and
the last loader for each contract year shall
not exceed 12 months.
Quality of Overloaded
Loaders
4.6.7 All overhauled loaders shall be tested in
accordance with the latest approved revision
of the OIM. All overhauled loaders shall be
inspected using the Contractor’s post-
overhaul inspection checklist prior to
inspection by DCMA. Overhauled loaders
shall pass a final inspection at origin via
DCMA 100% of the time each contract year.
Adherence to Contractor
Quality Management
System (QMS)
5.9 Contractor shall ensure 100% compliance
with the QMS using, International Standards
Organization (ISO) 9001:2015 and the
Configuration Management Plan (CMP)
3.0 Government Property
3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in
accordance with the Revolutionary FAR Overhaul (RFO) and as specified in the contract/order.
3.2 Government Property to be Provided: Government property to be provided includes
Government Furnished Equipment (GFE), Government Furnished Material (GFM), and
Contractor Acquired Property (CAP). The CAP is property (equipment or materials/supplies)
acquired by the Contractor with Government funding, whereby the Government retains right to
title and return of the property after contract close-out. Additionally, the Contractor shall remain
responsible for maintaining, modifying, repairing, calibrating, performing nondestructive
inspections on, and overhauling equipment or components used during this contract. See GFP
Attachment to be provided.
3.2.1 The Government will furnish two (2) Halvorsen Loaders (one Tier III and one legacy
model with A/C) for use as engineering test beds for verification of new changes, along with
-- 3 of 27 --
large item parts and one (1) Contingency High-Priority Mission Support Kit (CHPMSK), as
detailed in the GFP attachment; these assets will remain as GFM throughout the contract period.
3.3 Reporting of Government Property: The Contractor shall have a system of internal controls
to manage (control, use, preserve, protect, repair, and maintain) Government property in its
possession in accordance with RFO 52.245-1, and its property management system shall be
adequate to satisfy the requirements of this clause. The Contractor shall record receipt and return
of all Government Furnished Property (GFP), as well as the reporting of shipment, consumption,
disposal, or transfer to another contract, in the GFP Module in Procurement Integrated Enterprise
Environment (PIEE), https://piee.eb.mil, as stipulated by R-DFARS 252.245-7005 with the
exception of the following: The requirement for reporting updated status in the GFP module
within seven (7) business days will only be required for (i) Report receipt of GFP. This reporting
requirement does not change any liability provisions or other reporting req…