Skip to content

Open for responses

INDUSTRY DAY 2026 FA8534-2X-R-XXXX

DEPT OF DEFENSE

Notice type
Special Notice
Solicitation #
FA8534-2X-R-XXXX
NAICS
333924
Set-aside
No Set aside used
Posted
November 9, 2026
Response due
December 2, 2026

What this opportunity is

The Department of Defense is hosting an Industry Day on December 9, 2026, to gather feedback on sustaining the Halvorsen Aircraft Loader (ACL) system, which includes services such as overhaul, field support, engineering support, program management, and data management for approximately 500 units at 170 locations. This opportunity is open to all businesses, as there is no set-aside for small businesses. Interested companies should note that this is a Special Notice, indicating they should track the event for potential future bidding opportunities rather than submitting proposals at this stage.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Performance Work Statement for Halvorsen Aircraft Cargo Loaders Sustainment Purchase Request: FD2060-__-_____ __________ Date QAPC signs QASP. -- 1 of 27 -- 1.0 Description of Services 1.1 Objectives: This Performance Work Statement (PWS) describes the services required for the sustainment of the Halvorsen Aircraft Cargo Loader (ACL) of approximately 170 worldwide locations. These services include Overhaul, Field Support, Engineering Support, Program Management, and Data Management. 1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the United States Air Force (USAF) by sustaining a fleet of approximately 500 Halvorsens by providing overhaul, parts support, engineering support, and field support ensuring continuous support of worldwide cargo movement. 1.3 Background: The Halvorsen ACL is a key link in the USAF global mobility capability. There are approximately 500 Halvorsens at approximately 170 worldwide locations. The Halvorsen is a three (3) pallet position, 25,000lb loader that supports tactical cargo loading missions. Halvorsens are extensively used in support of Overseas Contingency Operations (OCO) and humanitarian relief missions. 2.0 Services Summary: The following table summarizes the performance thresholds for the most critical performance objectives of this effort. Performance Objective PWS Reference Performance Threshold Quality of Contract Data Requirements List (CDRL) deliverable 4.2.1 There shall be no more than one rejection of any deliverable. There shall be no more than three (3) total rejection(s) of deliverables per contract year. The Government will reject a deliverable if three (3) or more technical errors or ten (10) or more minor errors are found within the deliverable. The rejected deliverable shall be corrected and resubmitted within fifteen (15) business days of notification of Government rejection. Receipt of CDRL deliverable 4.2.2 There shall be no more than two (2) late submissions of deliverables per contract year. The Contractor shall notify the Government at least five (5) working days prior to due date if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government. Delivery of Overhauled Loaders 4.6.6 The Contractor shall complete early or on schedule 100% of the overhaul deliveries in accordance with the task order baseline -- 2 of 27 -- schedule. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date. The late asset shall be delivered by the revised delivery date acceptable to the Government. The Contractor shall have no more than 20 loaders in work (i.e., inducted into the overhaul line) at any one time. The period of performance for the basic ordering period shall not exceed 24 months. The period of performance annual buy for full-rate overhauls for ordering periods 1-4 of the contract shall not exceed 18 months. The time between the delivery dates of the first loader inducted into the overhaul line and the last loader for each contract year shall not exceed 12 months. Quality of Overloaded Loaders 4.6.7 All overhauled loaders shall be tested in accordance with the latest approved revision of the OIM. All overhauled loaders shall be inspected using the Contractor’s post- overhaul inspection checklist prior to inspection by DCMA. Overhauled loaders shall pass a final inspection at origin via DCMA 100% of the time each contract year. Adherence to Contractor Quality Management System (QMS) 5.9 Contractor shall ensure 100% compliance with the QMS using, International Standards Organization (ISO) 9001:2015 and the Configuration Management Plan (CMP) 3.0 Government Property 3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in accordance with the Revolutionary FAR Overhaul (RFO) and as specified in the contract/order. 3.2 Government Property to be Provided: Government property to be provided includes Government Furnished Equipment (GFE), Government Furnished Material (GFM), and Contractor Acquired Property (CAP). The CAP is property (equipment or materials/supplies) acquired by the Contractor with Government funding, whereby the Government retains right to title and return of the property after contract close-out. Additionally, the Contractor shall remain responsible for maintaining, modifying, repairing, calibrating, performing nondestructive inspections on, and overhauling equipment or components used during this contract. See GFP Attachment to be provided. 3.2.1 The Government will furnish two (2) Halvorsen Loaders (one Tier III and one legacy model with A/C) for use as engineering test beds for verification of new changes, along with -- 3 of 27 -- large item parts and one (1) Contingency High-Priority Mission Support Kit (CHPMSK), as detailed in the GFP attachment; these assets will remain as GFM throughout the contract period. 3.3 Reporting of Government Property: The Contractor shall have a system of internal controls to manage (control, use, preserve, protect, repair, and maintain) Government property in its possession in accordance with RFO 52.245-1, and its property management system shall be adequate to satisfy the requirements of this clause. The Contractor shall record receipt and return of all Government Furnished Property (GFP), as well as the reporting of shipment, consumption, disposal, or transfer to another contract, in the GFP Module in Procurement Integrated Enterprise Environment (PIEE), https://piee.eb.mil, as stipulated by R-DFARS 252.245-7005 with the exception of the following: The requirement for reporting updated status in the GFP module within seven (7) business days will only be required for (i) Report receipt of GFP. This reporting requirement does not change any liability provisions or other reporting req…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 333924