36C24127Q0030 UPS Eaton Powerware System Replacement - RFIs
Does the VA require technicians performing quarterly and annual preventive maintenance to be individually factory-certified or authorized by Eaton?
Due to the complex nature of the product and criticality - Yes
Will documented experience and technical qualifications satisfy the qualification requirement for routine preventive maintenance?
See answer to RFI 1
Is direct access to Eaton's proprietary field-service software mandatory for the prime contractor, or may that requirement be fulfilled through an Eaton-authorized service provider supporting specific procedures?
Prime Contractor does not require that; That portion can be filled through an Eaton Authorized Technician.
Would a contractor be considered technically acceptable if it performs routine maintenance using qualified technicians and subcontracts manufacturer-restricted procedures and startup to Eaton?
Yes, minor PM work such as filter changes etc. would be outside the requirement of needing an Eaton Technician.
Since Eaton has discontinued the 93E product line, will the VA accept the current Eaton 93PM or another equivalent replacement system meeting the required performance specifications?
The VA would accept an Eaton alternative. The goal of the project is to replace existing equipment in-kind with newer model.
Does the existing Eaton Powerware 9390 system have an external maintenance bypass (for example, a maintenance bypass panel or a bypass sidecar with maintenance bypass and isolation breakers)?
Yes, See photos.
Is the replacement expected to include a maintenance bypass sidecar, such as the Eaton 93E 60 kVA bypass sidecar shown in Attachment A, or is it limited to the UPS and Extended Battery Cabinet listed in SOW Section 3.5?
The UPS is required to be able to go into maintenance Bypass and maintain power to the computer room during maintenance.
What is the kVA rating of the existing unit? The SOW says "Model 80," but the replacement is specified at 60 kVA.
Existing UPS is 80KVA. The goal is to replace-in- kind. The 60kVA was utilized as a basis of design.
What are the existing input voltage and output voltage?
Current system: Eaton Powerware 9390-80 Model 80
AC IN: 208VAC 3W 60Hz 3Phase 240A
AC OUT: 208VAC 4W 60Hz 3Phase 222A 78KW 80KVA
BYPASS: 208VAC 4W 60Hz 3Phase 222A 80KVA
DC: 384-480Vdc 204A
Please provide a photo of the existing unit's data plate.
See attached photos
Please provide photos of the full system (standing back) and of the battery cabinet and batteries.
See attached photos
Please confirm the battery quantity and model: 40 x Hitachi Chemical Energy Technology 12V 540W, HRC12540WP.
Confirmed
What is the current battery run time, and what run time is required for the replacement?
60 minutes
would it be possible to forward the latest performance specifications/Source Control Drawings for the Powerware System
attached
Will the VA be paying invoices on a Net-30/45/60 schedule?Â
The VA approves all invoices within 15 days and funds are transferred within 30 days of receipt.
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Open opportunities in NAICS 811310
PAINT/SANDING BOOTH, AIR SHOWER, & CABINET BLASTER MAINTENANCE
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due December 15, 2026
J061--Emergency Switchgear Repairs PWS 539
VETERANS AFFAIRS, DEPARTMENT OF · Sources Sought · due December 7, 2026
US Army Hawaii Dining Facilities’ Large Equipment Preventative Maintenance & Repair Services
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due November 30, 2026
Equipment Operations, Maintenance, and Repair Services at Joint Base Pearl harbor Hickam, Hawaii (JBPHH).
DEPT OF DEFENSE · Solicitation · due December 8, 2026
J061--Emergency Switchgear Repairs PWS 539
VETERANS AFFAIRS, DEPARTMENT OF · Sources Sought · due December 7, 2026
FIRE EXTINGUISHER INSPECTION, MAINTENANCE, RECHARGE, REPAIR, HYDROSTATIC TESTING
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due December 2, 2026