Skip to content

Open for responses

J061--Emergency Switchgear Repairs PWS 539

VETERANS AFFAIRS, DEPARTMENT OF

Notice type
Sources Sought
Solicitation #
36C25027Q0125
NAICS
811310
PSC
J061
Posted
November 24, 2026
Response due
December 7, 2026

Description

Page 1 of 17 Performance Work Statement Repair Emergency Power Phase 2 Cincinnati VA Medical Center 1. GENERAL 1.1. Purpose The Department of Veterans Affairs requires the services of a qualified contractor to repair, program, modify, and test the emergency power generation and paralleling switchgear system serving at Building 1 at the Cincinnati VA Medical Center. Last year, the lack of backup generators and emergency power led to operating room closures at Cincinnati VA Medical Center. If the sole generator fails, critical care cannot be maintained onsite. As a result, all critical care would need to be diverted to other VA facilities or community care providers. The system is currently operating with only one functional generator. This condition leaves the facility without the required redundancy in the event of a utility outage or failure of the remaining operational generator. The purpose of this requirement is to restore both generators to operational status, repair the associated paralleling switchgear, and verify that the emergency power system operates as designed. 1.2. Scope The Contractor shall provide all labor, supervision, materials, parts, equipment, tools, programming, testing equipment, transportation, and incidental services necessary to: 1. Repair both emergency generators. 2. Replace damaged MFR13 and reverse power protective relays associated with the paralleling switchgear. 3. Modify the switchgear door and wiring as required to support the replacement relays. 4. Update applicable ABB system drawings. 5. Program and test the replacement relays. 6. Provide load-bank testing for both generators. 7. Test the paralleling operation of Generators 1 and 2. 8. Verify generator priority changes, automatic return to service, and load shedding. 9. Test the generator control panels. 10. Complete an operational test of the entire emergency power system following all repairs. 1.3. Period of Performance The period of performance shall be 120 days. -- 1 of 17 -- Page 2 of 17 Generator work shall be performed on two separate weekends, with one generator serviced during each weekend. Specific dates shall be coordinated with and approved by the Government before work begins. The Contractor shall perform work on Saturdays and Sundays unless otherwise approved in writing by the Contracting Officer or designated Government representative. Federally Recognized Holidays: The contractor is not anticipated but may be required to provide service on Federally recognized holidays in accordance with the terms and conditions established in this PWS to include but not limited to the following: New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day 1.4. Place of Performance Cincinnati VA Medical Center 3200 Vine Street Cincinnati, Ohio 45220-2637 The work is in building 1 room B013 on the main Cincinnati VA campus. 1.5. Type of Contract The Government intends to award a firm-fixed-price contract for the services described in this Performance Work Statement. Security Requirements and Background Checks: All contractor and subcontractor employees must comply with Federal, State, Local, and Department of Veterans Affairs security requirements and background checks to perform services in support of VA medical facilities in the states of Ohio and Kentucky. Services must be performed in accordance with contract terms at the contractor’s facility unless otherwise required (e.g., meetings, site visits), which must be coordinated with the Government Program Manager. Personnel requiring access to any VAMC property must consent to background checks or will be denied facility access. Required information for background checks includes: full name, driver’s license number and/or social security number, date of birth, and a completed background check questionnaire. AMC/VAACC Identification Badges: The contractor shall ensure that all personnel obtain VAMC/VAACC identification badges from the VAMC/VAACC security personnel office as appropriate in compliance with all federal and local VAMC/VAACC facility policies in coordination with the government program manager if required. -- 2 of 17 -- Page 3 of 17 Employment Eligibility and Credentialing Requirements: Contractors shall ensure their employees and those of their Subcontractors possess proper credentials allowing them to work in the United States. No compensation will be provided for delays or expenses related to compliance with this requirement. Contractors are not excused from proceeding with the Contract due to credentialing issues. POST AWARD CONFERENCE/PERIODIC PROGRESS MEETINGS: The contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, government program manager, and other government personnel, as appropriate, may meet periodically with the contractor to review the contractor's 1.6. Hours and Scheduling A majority of the generator and emergency power system work shall be performed during weekends to minimize disruption to medical center operations. The Contractor shall coordinate all work dates, system outages, switching activities, and testing with the Government Program Manager, COR, Engineering Service, and other designated VA personnel before mobilization. The Contractor shall provide the Government with proposed work dates at least 14 business days before the planned work, unless otherwise directed by the Contracting Officer. 1.7. Contractor Furnished Items The Contractor shall furnish all labor, supervision, materials, replacement parts, tools, equipment, programming devices, test instruments, load banks, transportation, and other items necessary to complete the work. The Contractor shall provide a load bank for testing both generators during each scheduled weekend of work.…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 811310