Description
PERFORMANCE WORK STATEMENT
JBMDL Power in the Pines Open House and Air Show
Outdoor LED Video Display Screens, Live Video Production, and Signal Distribution Support
1.0 Purpose
This Performance Work Statement (PWS) establishes the requirement for contractor-provided outdoor LED video display screens, live video production, signal distribution, power, setup, operations, maintenance, and teardown support for the Joint Base McGuire-Dix-Lakehurst (JBMDL) Power in the Pines Open House and Air Show (OHAS). The requirement shall support the in-person audience through display of live video of aerial acts, Public Affairs content, informational graphics, maps, emergency messaging, and other Government-approved content.
2.0 Scope
The contractor shall provide all personnel, equipment, transportation, setup, operation, maintenance, technical support, live video production, signal distribution, power generation, and teardown necessary to furnish and operate four outdoor LED video display screens and associated display support during the event.
This requirement is for onsite display and live video production support only. No livestream, internet broadcast, social media streaming, or public virtual-audience support is required under this effort unless separately directed by the Government.
The contractor shall provide the equipment and technical capability necessary to capture, route, display, and distribute live video and other approved content to the required screens and designated Government-furnished televisions.
3.0 Place of Performance
Performance shall occur at Joint Base McGuire-Dix-Lakehurst, New Jersey, at locations designated by the Government within the air show grounds.
4.0 Period of Performance
4.1 The contractor shall deliver, position, install, integrate, power, and test all required equipment no later than 2000 local time on Thursday prior to the event weekend.
4.2 The contractor shall provide testing support on Thursday and shall ensure all required systems are fully operational on Friday, Saturday, and Sunday from 0900 to 1700, or as otherwise directed by the Government for minor schedule adjustments based on event conditions.
4.3 Teardown and removal of contractor equipment shall begin no earlier than the conclusion of Sunday event operations, unless otherwise directed by the Government, and shall be completed within the timeframe established by the Government.
5.0 General Requirements
5.1 The contractor shall provide four outdoor LED video display screens suitable for large-crowd daytime viewing at an outdoor air show.
5.2 The Government intends to position:
two screens on the far ends of the primary spectator area; and
two screens behind show center, behind the Air Boss control tower.
5.3 Final placement locations, orientation, and exact standoff distances shall be directed by the Government based on operational, safety, and site conditions.
5.4 All contractor-furnished equipment shall be suitable for outdoor operation and capable of reliable performance in daylight and normal environmental conditions expected during an outdoor event.
5.5 The contractor shall provide all transportation, movement, placement, setup, alignment, securing, operation, teardown, and removal of contractor-furnished screens and support equipment. The Government will not transport, move, install, erect, align, or otherwise assist in setup or teardown of contractor-furnished screens or related support equipment.
6.0 Display Screen Requirements
6.1 The contractor shall provide:
four (4) outdoor LED display screens, each measuring approximately 15 feet by 9 feet.
6.2 All screens shall:
be suitable for daylight outdoor viewing;
be capable of displaying live video, still graphics, informational slides, maps, Public Affairs content, sponsor recognition if approved by the Government, and emergency messaging;
be mounted, secured, transported, and operated in a safe and stable manner;
include all trailers, support structures, ballast, mounts, and ancillary equipment required for safe operation;
be positioned and aimed as directed by the Government; and
be capable of continuous operation during required event hours.
6.3 The contractor shall identify any operating or safety limitations associated with wind, weather, visibility, grounding, rain, or other environmental factors that may affect safe screen operations. The proposed screen system should be capable of safe deployment in light rain conditions and wind gusts up to 30 miles per hour, or the contractor shall clearly identify any lower operating or stowage threshold.
7.0 Live Video Production, Signal Integration, and Display Capability
7.1 The contractor shall provide live video production capability sufficient to capture and display aerial acts and other event activity on all required screens in near real time.
7.2 The contractor shall provide a minimum three-camera live video production capability. At a minimum, the live production setup shall include:
one camera dedicated to capturing aerial acts and performers;
one camera positioned to capture the Air Boss area, narrator area, or other directed fixed event coverage; and
one roaming camera for crowd shots, interviews, and other directed event coverage.
7.3 One camera may be positioned on or adjacent to the Air Boss stand, as directed by the Government. Remaining cameras may be ground-based unless otherwise approved by the Government. No elevated camera platforms are required under this effort unless separately directed by the Government.
7.4 The contractor shall provide all equipment and technical capability necessary to capture, route, convert if necessary, distribute, and display live and Government-approved content on all required screens.
7.5 The contractor shall provide the personnel and equipment necessary for live video production, including cameras, camera operators, switching capability, and associated production support sufficient to generate one primary prog…
Source: SAM.gov, as posted. Verify the current solicitation before responding.