Skip to content

Open for responses

Rental of One (1) Diesel Ultra High Pressure (UHP) Trailer 20K PSI/20 GPM and component parts

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
N3904027Q3148
NAICS
532490
PSC
W043
Set-aside
No Set aside used
Posted
November 17, 2026
Response due
November 25, 2026
Place of performance
Kittery, ME

What this opportunity is

The Department of Defense is seeking to rent one diesel Ultra High Pressure (UHP) trailer capable of 20,000 PSI and 20 GPM, along with necessary support services such as start-up, training, and maintenance, for use at the Portsmouth Naval Shipyard in Kittery, ME. This opportunity is open to all businesses, as there is no set-aside for small businesses. Vendors should note that this is a Combined Synopsis/Solicitation, indicating that they should prepare to submit proposals for technical evaluation rather than simply tracking the notice.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

STATEMENT OF WORK Diesel UHP Trailer 20K PSI/20 GPM Location: PNSY Kittery, ME Rev: A Page 1 of 5 1. SCOPE. 1.1. Portsmouth Naval Shipyard (PNSY) is seeking to lease a portable (trailer mounted), self-contained, diesel motor driven 20,000 PSI, 20 GPM Ultra High Pressure (UHP) water jet system with support services (Start- up/commissioning, training, preventative maintenance and weekly equipment inspections) for use at Portsmouth Naval Shipyard, Kittery, Maine. The required components of the system, their performance parameters and the required support services are detailed in the Statement of Work. (SOW). Unless otherwise stated, the contractor shall furnish the UHP system, including all labor, supervision, tools, materials, equipment and other items and services that are necessary to perform as described within this SOW. 2. APPLICABLE DOCUMENTS. 2.1. Issues of Publications. The following documents, which are in effect on the date of the solicitation is issued, are a part of this specification to the extent applicable, or as specified herein. Within the specification, they shall be referred to by their basic designation only. 2.1.1. Government Furnished 2.1.1.1. Corporate Lifting and Handling Manual 2.1.2. Nongovernment Furnished 2.1.2.1. N/A 2.2. Order of precedence. In the event of conflict between the SOW and the references cited above, the text of this SOW shall take precedence. Nothing in this SOW, however, shall supersede applicable laws or regulations unless a specific exemption has been obtained. 3. REQUIREMENTS. 3.1. Component List. 3.1.1. UHP Water Jet required components. PIECE NO. QTY. NAME OF PART PARA NO. PC-01 1 Trailer mounted UHP waterblast unit 3.2 PC-02 6 Hose, 50ft, 20K WP 3.5 PC-03 3 Burst Disc 24K PSI 3.4 PC-04 3 Burst Disc 28K PSI 3.4 PC-05 1 E-stop and cabling 3.2 3.2. UHP Water Jet System Requirements. 3.2.1. Diesel Powered 3.2.2. Operating Pressure: 0-20,000 PSI 3.2.3. Flow Rate: 20 GPM 3.2.4. The pump shall be powered by a single diesel engine with a fuel tank sized to run the equipment. 3.2.5. Diesel tanks must be either of double wall construction meeting UL-142 requirements or have approved integrated secondary containment or external berm style containment of 110% of the tank capacity. 3.2.6. UHP water jet system shall be suitable for outdoor operation with an ambient operating temperature range of -10°F to 110°F. 3.2.7. UHP equipment shall have an operator control panel, which provides the following features: 3.2.7.1. Warning displays will indicate and the pump will shut down if automatic sensors indicate low inlet water pressure, and low pump oil. -- 1 of 5 -- STATEMENT OF WORK Diesel UHP Trailer 20K PSI/20 GPM Location: PNSY Kittery, ME Rev: A Page 2 of 5 3.2.7.2. An emergency stop button that stops all machine functions and activates a high-pressure bleed down valve to relieve system pressure to 0 PSI within 5 seconds. Pressure shall be relieved in the pump and attached UHP hoses. 3.2.8. Inlet water shall pass through a booster pump and be filtered. Pressure gauges shall be included on the inlet side and the outlet side of the filter to indicate when the filter needs maintenance. 3.2.9. All opening/connections/flanges are to be cleaned and capped. 3.2.10. All contractor supplied equipment shall be capable of operating in below freezing temperatures and include freeze protection measures on components that are prone to freezing (e.g. condensate line, water separators, and drains) 3.2.11. UHP water jet system must be pre-wired for and compatible with a Remote Emergency Stop (E- stop) Switch. This will enable the UHP equipment to be shut down in response to an emergency condition where pressure needs to be secured. The Contractor shall route all E-stops switch & control wiring to a central location designated by the government where the UHP equipment can be secured. 3.2.11.1. The E-stop cable distance to be routed is estimated at 500 Ft, however, the Contractor shall be prepared to provide & route up to 1500 FT of wire to accommodate complex routing paths, cable routing around obstacles, service brows, electrical service chases, etc. 3.2.11.2. E-stop switch shall be equipped with protective Plexiglas or acrylic style clear cover to prevent inadvertent activation. 3.2.11.3. E-stop cabling must utilize heavy-duty industrial cable for use in flexible, portable, and extra-hard usage applications (type SO cable or equivalent). 3.3. Physical Dimension 3.3.1. Trailer Mounted 3.3.2. Maximum Allowable Footprint (L x W) Inches: N/A 3.3.3. Maximum Allowable Weight (lbs.): N/A. 3.4. UHP Water Jet System Operating and Safety Controls: 3.4.1. Pump shall have two rupture discs to protect the pump and operators. 3.4.1.1. One rupture disc rating at 120% of operating pressure. 3.4.1.2. One rupture disc rating at 140% of operating pressure. 3.5. Equipment Hose Connection & Distribution Hose Requirements: 3.5.1. The contractor shall, on delivery, make all hose connections and all hoses must have safety cables (Safety Restraint Devices) installed to prevent hose whip in case of accidental separation of coupling or clamp device. The Contractor shall provide the necessary length to make all connections. 3.5.2. All components in the system must be properly rated for the intended operating pressure. 3.5.3. The contractor shall provide adequately sized hoses, interconnecting hose, elbows, hardware and any fittings required to connect the pump and hoses to operate the water jet system for initial startup and operation during contract period. 3.6. Equipment Start-up/ Commissioning Services 3.6.1. The Contractor must provide start-up and commissioning services to prepare the equipment to be placed into service. This includes but is not limited to the following: 3.6.1.1. Energizing equipment 3.6.1.2. Pressurizing the system 3.6.1.3. Performing leak check of all contractor made connections 3.6.1.4. Adjusting setpoint(s) to meet the requirements of…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 532490