Open for responses
Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades
TRANSPORTATION, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
6973GH-27-R-00005
NAICS
237110
PSC
Y1ND
Set-aside
Small Business Set Aside - Total
Posted
November 16, 2026
Response due
November 30, 2026
Place of performance
Oklahoma City, OK
Description
FAA - W.O. #2023-021108
STRUCTURE DEMOLITION
LDG / MMAC IWTP and Collection System Upgrade (Type B)
02 41 16 - 1
SECTION 02 41 16
STRUCTURE DEMOLITION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including the FAA General and
Supplementary Conditions and Division 01 Specification Sections, apply to this
Section.
1.2 SUMMARY
A. Section Includes:
1. Demolition and removal of buildings and site improvements.
2. Abandoning in-place and removing below-grade construction.
3. Disconnecting, capping or sealing, abandoning in-place, and removing site
utilities.
B. Related Requirements:
1. Section 01 10 00 "Summary of Work" for use of the premises and phasing
requirements.
2. Section 02 41 19 "Selective Demolition" for partial demolition of buildings,
structures, and site improvements.
1.3 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless
indicated to be salvaged.
1.4 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to,
cornerstones and their contents, commemorative plaques and tablets, and other items
of interest or value to Owner that may be uncovered during demolition remain the
property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
-- 1 of 384 --
FAA - W.O. #2023-021108
STRUCTURE DEMOLITION
LDG / MMAC IWTP and Collection System Upgrade (Type B)
02 41 16 - 2
1.5 INFORMATIONAL SUBMITTALS
A. Proposed Protection Measures: Submit report, including Drawings, that indicates the
measures proposed for protecting individuals and property, for environmental
protection, for dust control, and for noise control. Indicate proposed locations and
construction of barriers.
1. Adjacent Buildings: Detail special measures proposed to protect adjacent
buildings to remain.
B. Schedule of Building Demolition Activities: Indicate the following:
1. Detailed sequence of demolition work, with starting and ending dates for each
activity.
2. Temporary interruption of utility services.
3. Shutoff and capping or re-routing of utility services.
C. Predemolition Photographs or Video: Show existing conditions of adjoining
construction and site improvements, including finish surfaces, that might be
misconstrued as damage caused by demolition operations. Comply with Section 01 32
33 "Photographic Documentation." Submit before the Work begins.
1.6 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
1.7 FIELD CONDITIONS
A. Buildings to be demolished will be vacated and their use discontinued before start of
the Work.
B. Buildings immediately adjacent to demolition area will be occupied. Conduct building
demolition so operations of occupied buildings will not be disrupted.
1. Provide not less than 72 hours' notice of activities that will affect operations of
adjacent occupied buildings.
2. Maintain access to existing walkways, exits, and other facilities used by
occupants of adjacent buildings.
a. Do not close or obstruct walkways, exits, or other facilities used by
occupants of adjacent buildings without written permission from authorities
having jurisdiction.
C. Conditions existing at time of inspection for bidding purpose will be maintained by
Owner as far as practical.
D. Hazardous Materials: It is not expected that hazardous materials will be encountered in
the Work.
-- 2 of 384 --
FAA - W.O. #2023-021108
STRUCTURE DEMOLITION
LDG / MMAC IWTP and Collection System Upgrade (Type B)
02 41 16 - 3
1. If materials suspected of containing hazardous materials are encountered, do not
disturb; immediately notify Engineer and Owner.
E. On-site storage or sale of removed items or materials is not permitted.
1.8 COORDINATION
A. Arrange demolition schedule so as not to interfere with Owner's on-site operations.
PART 2 - PRODUCTS
2.1 SOIL MATERIALS
A. Satisfactory Soils: Comply with requirements in Section 31 20 00 "Earth Moving."
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting demolition
operations.
B. Review Project Record Documents of existing construction or other existing condition
and hazardous material information provided by Owner. Owner does not guarantee
that existing conditions are same as those indicated in Project Record Documents.
C. Perform an engineering survey of condition of building to determine whether removing
any element might result in structural deficiency or unplanned collapse of any portion of
structure or adjacent structures during building demolition operations.
D. Steel Tendons: Locate tensioned steel tendons and include recommendations for de-
tensioning.
E. Inventory and record the condition of items to be removed and salvaged. Provide
photographs or video of conditions that might be misconstrued as damage caused by
salvage operations. Comply with Section 01 32 33 "Photographic Documentation.
3.2 PREPARATION
A. Salvaged Items: Comply with the following:
1. Clean salvaged items of dirt and demolition debris.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to storage area designated by Owner.
-- 3 of 384 --
FAA - W.O. #2023-021108
STRUCTURE DEMOLITION
LDG / MMAC IWTP and Collection System Upgrade (Type B)
02 41 16 - 4
5. Protect items from damage during transport and storage.
3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Utilities to be Disconnected: Locate, identify, disconnect, and seal or cap off
utilities serving buildings and structures to be demolished.
1. Arrange to shut off utilities with utility companies.
2. If removal, relocation, or abandonment of utility services will affect adjacent
occupied buildin…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Open opportunities in NAICS 237110
Y1DZ--598-22-115 Site Utility Infrastructure-NLR
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due January 5, 2027
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
INTERIOR, DEPARTMENT OF THE · Solicitation · due November 21, 2026
Whiteface Campground Well Replacement
AGRICULTURE, DEPARTMENT OF · Solicitation · due December 14, 2026
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
INTERIOR, DEPARTMENT OF THE · Solicitation · due November 21, 2026
Atchison Storm Sewer Separation Improvements, Atchison, Kansas
DEPT OF DEFENSE · Solicitation · due November 24, 2026
Z2NZ-- 658-23-108 Correct Stormwater Drainage
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due November 18, 2026