Page 1 of 7
VLSB 25 - 0024
CUI
CUI
DESIGN/BUILD
STATEMENT OF WORK
FOR
WATEREE OFFICE CABIN
24 July 2026
PROJECT: VLSB 25-0024
SCOPE OF WORK:
The Design Build Contractor shall provide all personnel, equipment, supplies,
facilities, transportation, tools, materials, supervision, and other items and non-
personal services necessary to design and construct a log cabin kit to be ordered
from Conestoga Log Cabins. Existing site already has 2 new Conestoga Log
Cabins and continuity is recommended.
The Design Build Contractor shall provide all personnel, equipment, supplies,
facilities, transportation, tools, materials, supervision, and other items and non-
personal services necessary to design and construct an asphalt paved parking lot
for the Wateree Recreation users and employee use. All work shall be done in
strict accordance with this Statement of Work and subject to the terms and
conditions of the contract and in accordance with Unified Facilities Criteria (UFC),
Unified Facilities Guide Specifications(UFGS), International Building Code (IBC),
National Electrical Code (NEC), National Electrical Safety Code (NESC), National
Fire Protection Association (NFPA), EPA 402-K-01-001 (2008), South Carolina
Department of Transportation (SCDOT), and Shaw Air Force Base Design
Standards. Additional information is included in the following attachments that
must be reviewed:
• Attachment A: Preliminary Design
BASE BID (CLIN 0001):
• Demo existing utilities, retain connection point for water, sewer, and power.
All will be re-utilized for the new building
• Construct new concrete foundation and 12” square masonry piers spaced
at 8’ O.C. each way for the main building and 8’ O.C. for the porch ensuing
the finished floor elevation is a minimum 2’ above the existing foundation
• Construct rim joist and girder system on top of the masonry piers. Exterior
and interior beams shall be three 2x12’s nailed together with 16d nails, 12”
O.C., alternating the length of the beam
o Strap beam to masonry piers
• Procure and install the log cabin from Conestoga
-- 1 of 7 --
Page 2 of 7
VLSB 25 - 0024
CUI
CUI
o Ensure the structural requirements are met for uplift
• Install wood stairs and ramp meeting ADA requirements
o Install appropriate foundation and posts to accommodate the new
stairs and ramp
SITEWORK:
• Prepare the existing site by thoroughly compacting the subgrade before
starting construction
• Grade, pave, and paint a parking lot in front of proposed office for users and
handicap accessibility. Provide the necessary Handicap spot and meet all
standards in accordance with the UFC, UFGS and SCDOT for parking lot
design. Provide a no parking zone for drop-off area (re-stocking, equipment
drops-offs etc.)
• Provide gravel-based parking lot area for employees at the rear of the
proposed office
• Protect in place all amenities/infrastructure in site area that is not part of this
project’s scope to remove/replace
• Run underground power from GFE pole-mounted transformer to provide
power to the log cabin
NOTE: The existing site includes an overhead primary power line running across
the area of work. The log cabin location must maintain the necessary minimum
distance from the overhead primary power line in accordance to the NEC.
INTERIOR:
• Log Cabin assembly is to be completed by Conestoga
• Log Cabin to include:
Millwork for kitchenette
Sinks. Including a 3-compartment sink and separate hand wash sink
in kitchenette area.
240v outlets must be available at kitchenette area
Receptacles must be located at an interval throughout the cabin and
specific locations to power the kitchenette space including a cash
register and all appurtenances, freezer/cooler, dishwasher, garbage
disposal, daily vacuuming use, outlets for computers in office etc. 120v
electrical outlets for the exterior – total of 4 outlets (1 on each side of
cabin)
-- 2 of 7 --
Page 3 of 7
VLSB 25 - 0024
CUI
CUI
Termination of electrical wiring will be conducted by the contractor
including but not limited to lighting, switches, garbage disposal etc.
HVAC:
• Contractor to provide and install all HVAC equipment and hook ups to feed
an 800 sqft. cabin for user comfort. Minimum of 2 zone split system – 1 in
main area, 1 in office.
• Ductless split system is acceptable
PLUMBING:
• Install all potable and sewer water lines along with all drains to include
connections to onsite sewer system supply
• Install cleanout at an accessible location outside of building footprint
• All restroom, kitchen equipment and a water heater
• Provide 2 outdoor hose bibs on exterior of cabin (1 in rear of cabin, 1 on
South side of cabin near the front left corner – side facing entrance to
grounds)
DESIGN:
The design build contractor shall provide a thorough design to house a log cabin
in the area of work alongside a parking lot to meet the needs of both the Wateree
Recreational users and employees.
The contractor shall provide design documents to include a 65%, 95% design and
as-builts. These should be submitted electronically as .dwg and .pdf. Hard copies
of each submittal shall include (1) 24x36 and (1) half size set.
• The design shall accurately represent the existing conditions for all trades
involved with the exception of finishes.
• No specification books are required. All products/materials may be specified
on the drawings.
Design Minimum submittal requirements
65% Submittals shall include, but not be limited to:
1. Demolition plans
2. Location, size and route for all exterior equipment and utilities
(gas, water, sanitary sewer, electrical, telephone). Show
exact location where the utilities will enter the facility.
3. Any design, calculations or equipment submittals deemed
necessary by the Contractor to allow construction to begin.
-- 3 of 7 --
Page 4 of 7
VLSB 25 - 0024
CUI
CUI
4. Any items deemed necessary by the Contractor to allow for
the continuation of the design.
95% Submittals shall include, but not be limited t…