Skip to content

Open for responses

New Office at Wateree

DEPT OF DEFENSE

Notice type
Sources Sought
Solicitation #
FA480326NAF01
NAICS
236220
PSC
Y1JZ
Set-aside
Small Business Set Aside - Total
Posted
November 16, 2026
Response due
November 20, 2026
Place of performance
SC

What this opportunity is

The Department of Defense is seeking a Design Build Contractor to design and construct a log cabin and an asphalt paved parking lot at the Wateree Recreation area in South Carolina. This opportunity is set aside for small businesses, making it suitable for those in the construction sector, particularly those experienced with design-build projects. As this is a Sources Sought notice, interested firms should track the opportunity for potential future solicitations rather than submit bids at this stage.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Page 1 of 7 VLSB 25 - 0024 CUI CUI DESIGN/BUILD STATEMENT OF WORK FOR WATEREE OFFICE CABIN 24 July 2026 PROJECT: VLSB 25-0024 SCOPE OF WORK: The Design Build Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non- personal services necessary to design and construct a log cabin kit to be ordered from Conestoga Log Cabins. Existing site already has 2 new Conestoga Log Cabins and continuity is recommended. The Design Build Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non- personal services necessary to design and construct an asphalt paved parking lot for the Wateree Recreation users and employee use. All work shall be done in strict accordance with this Statement of Work and subject to the terms and conditions of the contract and in accordance with Unified Facilities Criteria (UFC), Unified Facilities Guide Specifications(UFGS), International Building Code (IBC), National Electrical Code (NEC), National Electrical Safety Code (NESC), National Fire Protection Association (NFPA), EPA 402-K-01-001 (2008), South Carolina Department of Transportation (SCDOT), and Shaw Air Force Base Design Standards. Additional information is included in the following attachments that must be reviewed: • Attachment A: Preliminary Design BASE BID (CLIN 0001): • Demo existing utilities, retain connection point for water, sewer, and power. All will be re-utilized for the new building • Construct new concrete foundation and 12” square masonry piers spaced at 8’ O.C. each way for the main building and 8’ O.C. for the porch ensuing the finished floor elevation is a minimum 2’ above the existing foundation • Construct rim joist and girder system on top of the masonry piers. Exterior and interior beams shall be three 2x12’s nailed together with 16d nails, 12” O.C., alternating the length of the beam o Strap beam to masonry piers • Procure and install the log cabin from Conestoga -- 1 of 7 -- Page 2 of 7 VLSB 25 - 0024 CUI CUI o Ensure the structural requirements are met for uplift • Install wood stairs and ramp meeting ADA requirements o Install appropriate foundation and posts to accommodate the new stairs and ramp SITEWORK: • Prepare the existing site by thoroughly compacting the subgrade before starting construction • Grade, pave, and paint a parking lot in front of proposed office for users and handicap accessibility. Provide the necessary Handicap spot and meet all standards in accordance with the UFC, UFGS and SCDOT for parking lot design. Provide a no parking zone for drop-off area (re-stocking, equipment drops-offs etc.) • Provide gravel-based parking lot area for employees at the rear of the proposed office • Protect in place all amenities/infrastructure in site area that is not part of this project’s scope to remove/replace • Run underground power from GFE pole-mounted transformer to provide power to the log cabin NOTE: The existing site includes an overhead primary power line running across the area of work. The log cabin location must maintain the necessary minimum distance from the overhead primary power line in accordance to the NEC. INTERIOR: • Log Cabin assembly is to be completed by Conestoga • Log Cabin to include:  Millwork for kitchenette  Sinks. Including a 3-compartment sink and separate hand wash sink in kitchenette area.  240v outlets must be available at kitchenette area  Receptacles must be located at an interval throughout the cabin and specific locations to power the kitchenette space including a cash register and all appurtenances, freezer/cooler, dishwasher, garbage disposal, daily vacuuming use, outlets for computers in office etc. 120v electrical outlets for the exterior – total of 4 outlets (1 on each side of cabin) -- 2 of 7 -- Page 3 of 7 VLSB 25 - 0024 CUI CUI  Termination of electrical wiring will be conducted by the contractor including but not limited to lighting, switches, garbage disposal etc. HVAC: • Contractor to provide and install all HVAC equipment and hook ups to feed an 800 sqft. cabin for user comfort. Minimum of 2 zone split system – 1 in main area, 1 in office. • Ductless split system is acceptable PLUMBING: • Install all potable and sewer water lines along with all drains to include connections to onsite sewer system supply • Install cleanout at an accessible location outside of building footprint • All restroom, kitchen equipment and a water heater • Provide 2 outdoor hose bibs on exterior of cabin (1 in rear of cabin, 1 on South side of cabin near the front left corner – side facing entrance to grounds) DESIGN: The design build contractor shall provide a thorough design to house a log cabin in the area of work alongside a parking lot to meet the needs of both the Wateree Recreational users and employees. The contractor shall provide design documents to include a 65%, 95% design and as-builts. These should be submitted electronically as .dwg and .pdf. Hard copies of each submittal shall include (1) 24x36 and (1) half size set. • The design shall accurately represent the existing conditions for all trades involved with the exception of finishes. • No specification books are required. All products/materials may be specified on the drawings. Design Minimum submittal requirements 65% Submittals shall include, but not be limited to: 1. Demolition plans 2. Location, size and route for all exterior equipment and utilities (gas, water, sanitary sewer, electrical, telephone). Show exact location where the utilities will enter the facility. 3. Any design, calculations or equipment submittals deemed necessary by the Contractor to allow construction to begin. -- 3 of 7 -- Page 4 of 7 VLSB 25 - 0024 CUI CUI 4. Any items deemed necessary by the Contractor to allow for the continuation of the design. 95% Submittals shall include, but not be limited t…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 236220