Open for responses
Progressive Design-Build (PDB) - USSF Integration Facility F/10852 at WPAFB
DEPT OF DEFENSE
Notice type
Special Notice
Solicitation #
W912QR-PDB-USSF-Integration-Facility
NAICS
236220
PSC
Z2AZ
Posted
November 16, 2026
Response due
November 30, 2026
Place of performance
Wright Patterson AFB, OH
Description
SPECIAL NOTICE
The U.S. Army Corps of Engineers (USACE) is issuing this special notice to announce an upcoming competition for a design and construction solicitation for the US Space Force (USSF) Integration Facility, F/10852 using Progressive Design-Build under 10 USC §2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release.
I. INDUSTRY DAY
USACE intends to conduct an Industry Day on 03 December 2026 at 0900 Eastern Time to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and proposed PDB under an OT (non-FAR-based) framework. A notional acquisition schedule will be shared.
Interested parties are encouraged to ask questions and provide input in advance of the official Request for Qualifications (RFQ) release. General questions will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and are for informational purposes only. Statements made during the Industry Day do not constitute commitment, authorization, or binding guidance related to the future RFQ. Official Questions and Answers (Q&A) will be accepted and addressed following the release of RFQ.
II. LOCATION
Industry Day Presentation location:
Hope Hotel, 10823 Chidlaw Rd # A, Dayton, OH 45433
III. PROJECT OVERVIEW
Project Title: US Space Force (USSF) Integration Facility, F/10852
Location: Wright-Patterson Air Force Base (WPAFB), OH
NAICS Code: 236220
Total Program Funding: $394,000,000.00
IV. PROJECT DESCRIPTION
The USSF Integration Facility is a newly programmed mission at Wright-Patterson Air Force WPAFB, Ohio. This classified and contiguous operations area ultimately supports USSF’s mission to secure our Nation’s interest in, from, and to space as well as support across the Defense the Intelligence Enterprise. The new facility is situated adjacent to Building F/10854 to enable collaboration with partners and thus requires strict coordination for future utility access, physical security and logistics.
Construction is broken into distinct agreement phases under the Progressive Design-Build (PDB) framework. Phase 1 (Design & Pre-Construction): This Phase is structured to collaboratively advance the facility design from initial concepts to 65% design maturity, perform detailed constructability reviews, conduct transparent open-book cost estimating, identify and mitigate complex interface risks, and validate the overall space programming. Pre-construction services will establish a baseline cost and allow for early design and potential separate authorization of long-lead procurement items. Phase 2 (Final Design and Construction): This Phase will include the completion of final design documents (95% and 100% Certified Final), fast-tracking capabilities, and all physical construction activities, including structural, interior finishes, specialized secure controlled space, redundant systems commissioning, and final security accreditation. Phase 2 will also include comprehensive site work, utility distribution integration, and connection into the active Building F/10854.
Phase 2 covers construction of the multi-floor, approximately 333,700 SF secure USSF Integration Facility, including the physical connection to active Building F/10854, the integration of high-efficiency HVAC networks, a backup generator facility, high-security electrical switchgear, and the buildout of specialized controlled space. The Government will use available concept design information, programmed requirements, and initial planning data as the initial technical baseline. During Phase 1, the selected Design-Builder will validate the baseline and may recommend refinements; any material deviation from the Government’s baseline will require Government review and approval. The scope generally encompasses the following critical lines of effort:
Critical Infrastructure and Utilities: Installation of high-efficiency mechanical, electrical, plumbing (MEP), heating, ventilation, and air conditioning (HVAC) systems designed for 24/7 continuous operation, electrical tie-ins to centralized utilities, replacement of two existing end-of-life generators with new, Lightning Protection Systems (LPS), and addressable fire protection networks.
Secure Facilities: Turnkey design, construction, and Defense Intelligence Agency (DIA) accreditation of highly classified controlled space built to stringent ICD 705, IC Tech Spec, and Telecommunictaions Electronics Material Protected from Emanating Spurious Tranmission (TEMPEST) shielding standards to ensure complete physical, visual, and acoustic isolation.
New Construction, Envelope, and Physical Connection: Construction of a new structural frame with metal panels and pre-cast exterior walls, establishing a secure thermal wall envelope, executing the physical and utility connection to adjacent operational Building F/10854, and conducting all associated site work, paving, and access control infrastructure.
V. ACQUISITION STRATEGY - PRE-AWARD
The USACE will use a streamlined competitive selection process:
Step 1 –RFQ: Interested parties will submit a Statement of Qualifications (SOQ). Following evaluation of the qualification packages, the Government intends to short-list a target of three (3) of the highest qualified Design-Builders to proceed to Step 2.
Step 2 – Pitches: Selected Companies will participate in pitch presentations. One company will be selected as the Design-Build team for award of the initial design and preconstruction services with a modification for design completion and construction award.
…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Open opportunities in NAICS 236220
DOJ Phase II Renovation
JUSTICE, DEPARTMENT OF · Special Notice · due December 11, 2026
5680--FY27 NRM (PROJ 573-24-110) BB - Expand Cardiology Service
VETERANS AFFAIRS, DEPARTMENT OF · Special Notice · due December 18, 2026
GMF Rochester Workshop Bathrooms
AGRICULTURE, DEPARTMENT OF · Special Notice · due November 20, 2026
Child Development Center (CDC), Tinker Air Force Base, Oklahoma
DEPT OF DEFENSE · Solicitation · due December 1, 2026
Z1DA--Design Building (DB) 626-27-504 MHEOCC Compliance TVHS VAMC (Nashville Campus)
VETERANS AFFAIRS, DEPARTMENT OF · Presolicitation · due December 2, 2026
Winder Roof Drain Emergency Repairs
GENERAL SERVICES ADMINISTRATION · Justification