Reattach Electrical Conduit, Denver Air Traffic Control Tower (DEN ATCT), 9800 Peña Blvd, Denver, CO
TRANSPORTATION, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
697DCK-26-R-00391
NAICS
238210
PSC
Z2BA
Set-aside
Small Business Set Aside - Total
Posted
August 26, 2026
Response due
September 14, 2026
Place of performance
CO
What this opportunity is
The government is seeking a contractor to perform electrical conduit reattachment at the Denver Air Traffic Control Tower, under the Department of Transportation. This opportunity is set aside for small businesses, making it suitable for those in the construction and electrical sectors, specifically under NAICS code 238210. Interested bidders should note that this is a solicitation notice, indicating that they will need to prepare a proposal to compete for the contract rather than simply tracking the opportunity.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
FEDERAL AVIATION ADMINISTRATION
STATEMENT OF WORK
Electrical Conduit Reattachment
Denver International Airport Air Traffic Control Tower
(DEN ATCT)
9800 Peña Blvd, Denver, CO 80249
-- 1 of 26 --
FAA Procurement | Conduit Reattachment SOW | Page 2
Contents
1. General ...................................................................................................................4
1.1 Purpose ..............................................................................................................4
1.2 Background .......................................................................................................4
1.3 Applicable Documents and Standards ..............................................................5
2. Scope of Work .......................................................................................................5
2.1 Work to Be Performed ......................................................................................5
2.1.1 Site Survey and Confined Space Evaluation .................................................5
2.1.2 Diagnostic Inspection and Risk Assessment..................................................6
Tier 1 – Energized / Non-Intrusive Screening (no outage required) ...................6
Tier 2 – De-Energized Testing (requires outage and System Support Center
(SSC) coordination)..............................................................................................7
2.1.3 Work Method Plan .........................................................................................8
2.1.4 Reattachment Work ........................................................................................9
2.2 Schedule of Performance ................................................................................11
Phase 1 –Site Survey and Confined Space Evaluation (up to 7 calendar days) 12
Phase 2 – Diagnostic Inspection, Risk Assessment, and Work Method Plan (21
calendar days) .....................................................................................................12
Phase 3 – FAA/Technical Operations Review and Coordination (15 business
days) ...................................................................................................................12
Phase 4 – Reattachment Work Execution (not to exceed 30 calendar days) .....13
Phase 5 – Closeout (10 calendar days)...............................................................13
2.3 Personnel Qualifications .................................................................................13
Electrical .............................................................................................................13
Rigging and Structural .......................................................................................14
Confined Space ..................................................................................................14
Diagnostic / NDE Personnel ..............................................................................14
Supervisory.........................................................................................................15
Key Personnel ....................................................................................................15
-- 2 of 26 --
FAA Procurement | Conduit Reattachment SOW | Page 3
2.4 Place of Performance ......................................................................................15
2.5 Site Access and FAA Escort ...........................................................................16
3. Government-Furnished Property and Services ....................................................16
4. Contractor-Furnished Items .................................................................................17
5. Deliverables .........................................................................................................17
5.1 Deliverable Summary Table ...........................................................................18
5.2 Site Survey & Confined Space Evaluation Report (Phase 1) .........................18
5.3 Diagnostic Inspection and Risk Assessment Report (Phase 2) ......................19
5.4 Work Method Plan (Phase 2) ..........................................................................20
5.5 FAA/Technical Operations Authorization (Phase 3) ......................................21
5.6 Before & After Photographs (Phase 5) ...........................................................21
5.7 Project Completion Report (Phase 5) .............................................................21
6. Scope Limitations and Contract Modifications ...................................................21
7. Quality Control ....................................................................................................22
8. Safety Requirements ............................................................................................22
9. Definitions ............................................................................................................23
10. Applicable Procurement Guidance Reference ...................................................24
11. Warranty.............................................................................................................25
ATTACHMENTS:
1. Site Trip Report – For Reference Only
2. As built drawings – For Reference Only
-- 3 of 26 --
FAA Procurement | Conduit Reattachment SOW | Page 4
1. General
1.1 Purpose
This Statement of Work (SOW) describes the objectives, scope, and requirements
for electrical conduit reattachment services at the Denver International Airport Air
Traffic Control Tower (DEN ATCT). The Federal Aviation Administration (FAA)
requires a qualified contractor to furnish all labor, materials, equipment, and
supervision necessary to perform diagnostic inspection, risk assessment, and
reattachment of electrical conduit that has become detached from its support
structure and is resting on Heating Ventilation Air Conditioning (HVAC) ductwork
wit…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.